| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 RAJ | BARMER | RAJASTHAN | 344001 | ₹6.1 L Quoted ₹6.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹7.6 LRejected-Finance | ₹7.6 L | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹11.9 LRejected-Finance | ₹11.9 L | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | vinayandsons L2 | National Rewinding Works L1 | Continental Engineers and contractors L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing, Commissioning and replacement of 2 Zone Fire Alarm Control Panel as per IS-15908:2011 standard, Certified for Safety Standard IEC 62368-1:2018, Up to 600 Cable Connectivity per zone, 20 Detectors per zone plus 5 MCPs, LCD Display, Stand-by Battery Backup with built in charging, Fire/Fault status LED indication, SMPS System, Key Pad for Panel Operation, System Indication, Stand-by status Indication, Low battery warning with tone, Zone wise Isolation facility with loop voltage cut off complete all as specified and directed. Make:Honeywell,SIMPLEX and Autronica. | 4 | Each | 13,000 ₹52,000 | 4,000 ₹16,000 | 13,111 ₹52,444 |
| 2.00 | Supply, Installation, Testing, Commissioning and replacement of 4 Zone Fire Alarm Control Panel as per IS-15908:2011 standard, Certified for Safety Standard IEC 62368-1:2018, Up to 600 Cable Connectivity per zone, 20 Detectors per zone plus 5 MCPs, LCD Display, Stand-by Battery Backup with built in charging, Fire/Fault status LED indication, SMPS System, Key Pad for Panel Operation, System Indication, Stand-by status Indication, Low battery warning with tone, Zone wise Isolation facility with loop voltage cut off complete all as specified and directed. Make:Honeywell,SIMPLEX and Autronica. | 3 | Each | 17,000 ₹51,000 | 5,000 ₹15,000 | 17,888 ₹53,664 |
| 3.00 | Supply, Installation, Testing, Commissioning and replacement of 6 Zone Fire Alarm Control Panel as per IS-15908:2011 standard, Certified for Safety Standard IEC 62368-1:2018, Up to 600 Cable Connectivity per zone, 20 Detectors per zone plus 5 MCPs, LCD Display, Stand-by Battery Backup with built in charging, Fire/Fault status LED indication, SMPS System, Key Pad for Panel Operation, System Indication, Stand-by status Indication, Low battery warning with tone, Zone wise Isolation facility with loop voltage cut off complete all as specified and directed. Make:Honeywell,SIMPLEX and Autronica. | 4 | Each | 21,000 ₹84,000 | 6,000 ₹24,000 | 26,666 ₹1.1 L |
| 4.00 | Supply, Installation, Testing, Commissioning and replacement of 8 Zone Fire Alarm Control Panel as per IS-15908:2011 standard, Certified for Safety Standard IEC 62368-1:2018, Up to 600 Cable Connectivity per zone, 20 Detectors per zone plus 5 MCPs, LCD Display, Stand-by Battery Backup with built in charging, Fire/Fault status LED indication, SMPS System, Key Pad for Panel Operation, System Indication, Stand-by status Indication, Low battery warning with tone, Zone wise Isolation facility with loop voltage cut off complete all as specified and directed. Make:Honeywell,SIMPLEX and Autronica. | 3 | Each | 25,000 ₹75,000 | 8,000 ₹24,000 | 35,555 ₹1.1 L |
| 5.00 | Supply, Installation, Testing, Commissioning and replacement of Optical Smoke Sensor with Base LEDs for 360° Visibility, Advanced Detection and Communication Protocol, Sleek Low-profile Housing design, Regular 100 mm. base, IP 42, Smoke Sensitivity (1.96±0.76)% per ft., Air Velocity 0-400 fpm. EN54 Certified, 8 to 30 V DC Operating, Operating Temperature -30° to +70°C, including 12 V relay version complete all as speicied and directed. Make:Honeywell,SIMPLEX and Autronica. | 240 | Each | 575 ₹1.4 L | 800 ₹1.9 L | 1,299 ₹3.1 L |
| 6.00 | Supply, Installation, Testing, Commissioning and replacement of Conventional Sounder, wall & ceiling mount, with back box, 24 V DC operation, Peizo electric type, Fire engine siren tone complete all as specified and directed. Make:Honeywell,SIMPLEX and Autronica. | 15 | Each | 1,000 ₹15,000 | 6,000 ₹90,000 | 1,155 ₹17,325 |
| 7.00 | Supply, Installation, Testing, Commissioning and replacement of Response Indicator complete all as specified and direceted. Make:Honeywell,SIMPLEX and Autronica. | 45 | Each | 100 ₹4,500 | 600 ₹27,000 | 211 ₹9,495 |
| 8.00 | Supply, Installation, Testing, Commissioning and replacement of Manual Call Point, alarm status indicated by LED, 24 V DC operation, NC & NO output complete all as specified and directed.Make:Honeywell,SIMPLEX and Autronica. | 40 | Each | 900 ₹36,000 | 1,000 ₹40,000 | 555 ₹22,200 |
| 9.00 | Supply, Laying & Terminations of 2 Core 1.5 sq. mm. PVC cable complete all as specified and directed. Make:- Finolex, havells, Polycab, RR cable | 330 | RM | 60 ₹19,800 | 200 ₹66,000 | 99 ₹32,670 |
| 10.00 | Material and labour for repairing/servicing the Electric induction motor and centrifugal pump coupled type by carefully disconnecting the connection cables and earthings, disconnection of electric, water supply connections both side (suction and discharge side) and fixing of dummy plates as per site requirement. Removing side covers, servicing, greasing, changing of gland packing, gaskets, defective minor parts and re-assembling, testing, preparing the surfaces of the motor and pump for painting with two coats of synthetic enamel paint and commissioning the motor and pump of capacity 60 HP to the satisfaction of Engr-in-Charge. Note: (i) The rent of T&P for handling the pump motor assembly during dismantling and refixing is deemed to be included in the rate quoted by contatcor. (iii) Major spare parts of motor will be measured and paid separately under following respective items. | 1 | Each Job | 10,000 ₹10,000 | 6,000 ₹6,000 | 29,999 ₹29,999 |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
27 Oct 2025, 6:00 pmClosed
GE (AF) Utarlai
GE (AF) Utarlai PB No. 11 Barmer 344001
REPAIR AND MAINT OF FIRE SYSTEM AT AF STN UTARLAI
2025_MES_732401_2
8649/E8
Open Tender
Civil Works
180 days
Utarlai
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Utarlai
₹20,000
Yes
17 Dec 2025
29 Sept 2025
28 Oct 2025
29 Sept 2025
27 Oct 2025
13 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tender.pdf
Tender Documents • 0.52 MB
BOQ_820899.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid