| 1 | L1₹54.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹56.7 L+₹2.2 L (4.03%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | P.Sumalatha L2 | AMR CCONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the the existing Rmasonry in cement mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials | 12 | cum | 294 ₹3,528 | 283 ₹3,396 Lowest |
| 1.02 | Dismanting the existing cement concreate in the existing causeway and clearing away from the work site and carefully atacking the useful materials for reuse | 23 | cum | 505 ₹11,615 | 486 ₹11,178 Lowest |
| 1.03 | Eartheork excation in allclasses of soil except hard rock requiring blasting and depositing on bank with all leaks and lifts as per SS20B, including such as all labour | 92 | cum | 257 ₹23,644 | 246 ₹22,632 Lowest |
| 1.04 | Earthwork excavation in soft disintegrated rock requiring blasting expect hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B | 287.51 | cum | 602 ₹1,73,081.02 | 579 ₹1,66,468.29 Lowest |
| 1.05 | Vibrated cement concreate of 1:4:8, USING 40CM ISS HBG metal including cost and conveyance of all material to site including cement at site including cost | 21.84 | cum | 5,186 ₹1,13,262.24 | 4,986 ₹1,08,894.24 Lowest |
| 1.06 | Scaffolding and centering charges for the structural components of abutment piers, bed block abd deck slab including cost and conveyance of all materials to the site | 877.04 | sqm | 538 ₹4,71,847.52 | 516.5 ₹4,52,991.16 Lowest |
| 1.07 | Vibrataed cement concreate of 1:3:6, using 40mm ISS HBG mental including cost and conveyance of all material to site includiing cement at site including cost | 230.2 | cum | 5,528 ₹12,72,545.6 | 5,314.5 ₹12,23,397.9 Lowest |
| 1.08 | Vibrated cemnt concreate of 1:3:6, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement a site including cost of formwork soft water, labour charges for mixing transporting laying and curing concrete working at depths, Tools and plants and incidental charges such as maintaining of protective bunds | 229.3 | cum | 5,528 ₹12,67,570.4 | 5,314.5 ₹12,18,614.85 Lowest |
| 1.09 | Scaffolding and centering charges for the structural components of abutment piers, bed block and deck slab including cost and conveyance of all material to the site | 133.91 | sqm | 1,074 ₹1,43,819.34 | 1,033 ₹1,38,329.03 Lowest |
| 1.10 | Reinforcd cement concreate 1:1. 5:3 using 20MM iss hbg metal for all RCC item of works exluding cost of rein forcement and fabricating charges, centering and shuttering | 4.6 | cum | 9,042 ₹41,593.2 | 8,694 ₹39,992.4 Lowest |
Tender Value
₹55 L
EMD Value
₹55,000
Closing Date
9 Apr 2025, 3:00 pmClosed
Block Development Officer VP
Andipatti
Construction of 2 x 5.00 m Span RCC Minor Bridge in Pullimancombai to Mallayagoundanpatti road Ch 1950m at Pullimancombai Panchayat under Mines and Minerals 2023-24
2025_RDTN_537663_1
Mines and Minerals 23-24 09.04.2025
Open Tender
Civil Works - Others
Item Rate
180 days
Andipatti
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹55,000
Yes
21 Aug 2025
3 Apr 2025
9 Apr 2025
3 Apr 2025
9 Apr 2025
3 Apr 2025
Amount
Dismantling the the existing Rmasonry in cement mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials
Dismanting the existing cement concreate in the existing causeway and clearing away from the work site and carefully atacking the useful materials for reuse
Eartheork excation in allclasses of soil except hard rock requiring blasting and depositing on bank with all leaks and lifts as per SS20B, including such as all labour
Earthwork excavation in soft disintegrated rock requiring blasting expect hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B
Vibrated cement concreate of 1:4:8, USING 40CM ISS HBG metal including cost and conveyance of all material to site including cement at site including cost
Scaffolding and centering charges for the structural components of abutment piers, bed block abd deck slab including cost and conveyance of all materials to the site
Vibrataed cement concreate of 1:3:6, using 40mm ISS HBG mental including cost and conveyance of all material to site includiing cement at site including cost
Vibrated cemnt concreate of 1:3:6, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement a site including cost of formwork soft water, labour charges for mixing transporting laying and curing concrete working at depths, Tools and plants and incidental charges such as maintaining of protective bunds
Scaffolding and centering charges for the structural components of abutment piers, bed block and deck slab including cost and conveyance of all material to the site
Reinforcd cement concreate 1:1. 5:3 using 20MM iss hbg metal for all RCC item of works exluding cost of rein forcement and fabricating charges, centering and shuttering
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia semi-spherical back fill arrangement with 100 mm size broken granite chips at the periphery and labour charges.,
Providing and fixing KRAFT PAPER for fll width of seating of deck and including cost and conveyance to eork site, labour charges for fixing the same in the correct position and all other incidental charges etc., complete.,
Reinforcd cement concreate 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works exclding cost of rein forcement and fabricating charges, cencreate and shuttering
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyence to work site
Filling behind abutmants and wings with clean gritty gravel including cost abd conveyance of gravel to worksite, laying, handling charges and filling in layers, temping under optimum moisture content to get the maximum density including watering with al leads for water and all other incidental charges.,
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion
Supply and fabrication of Fe500 steel required for all RCC items of works involved in the schedule cost of ateel at site fabricatin, labour charges for cleaning the rods straighening, cutting bending tying grills, including overlapping to the required lengh whenever necessary and placing the reinforcement in position
Vibrated cement concreate of 1:4:8, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement ai site including cost of formwork, soft water, labour charges for mixing, transporting layng and curing concrete, working at depths, Tools and plants and incidental charges such as maintaining of protective bunds,
Reinforcd cement concreate 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works exclding cost of rein fobricating charges, centering and shuttering but not including curing and shall be finished smooth with cement mortar 1:3, 12 mm Thick .
Virabrated cement concreate M30 design mix using ISS size HBG grated metal including metal including cost and convyance of all materials to worksit and cement at site including
Vibrated reinforced concreate M-25 grade, design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including of steel, including labour charges for mixing , transporting ,laying , and curing concrete,
Vibrated cement concreate of 1:3:6, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100 mm dia drainage spout projecting beyond the buttom.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Sumalatha (BID ID -1284471)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .