Loading…
Loading…
Tender Value
₹37.0 Cr
EMD Value
₹73.9 L
Closing Date
1 Aug 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
MECH
6 conditions · 2 needing a document upload
Please see uploaded tender document & provide all the details and upload relevant documents accordingly.
The rates for conditional based items shall be filled as per the format in Annexure-01 of Tender document and to be uploaded along with the offer.
The tenderer shall have to upload the complete bank details such as Bank Name, Account No., IFSC code, PAN No. etc of his firm with the tender
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per the format and shall be valid for a period of 60 days beyond the bid validity period. In case, submission of Bid Security in the form of Bank Guarantee, the conditions provided in GCC works 2022 has to be followed.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Repair and overhauling of Axle Mounted Disc Brake System of LHB Coaches SS-II & SS III Schedule - Faiveley make of MYSS and UBLS of SOUTH WESTERN RAILWAY
04-CWS-MYSS-2026-27
04-CWS-MYSS-2026-27
Single
Works - General
24 Months
Dharwad, Karnataka
₹0
₹73.9 L
1 Aug 2026
10 Jul 2026
18 Jul 2026
28 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 15,63,79,551.52 | ||
| Per Coach | 128.00 | 6,17,576.6 | — | ||
| Cost towards Must change items for Overhauling of Brake Cylinder & Brake Calliper (SS III schedule) -EOG coaches including GST @ 18 % | — | — | — | 7,90,49,804.8 | |
| Per Coach | 46.00 | 6,15,480.92 | — | ||
| Cost towards Must change items for Overhauling of Brake Cylinder & Brake Calliper (SS III schedule) -POWER CAR coaches including GST @ 18 % | — | — | — | 2,83,12,122.32 | |
| Per Coach | 180.00 | 2,44,332.53 | — | ||
| Cost towards Must change items for Overhauling of Axle mounted disc brake system of EOG coaches SS II/M36 schedule (Kit for Brake controls and WSP only) including GST @ 18 % | — | — | — | 4,39,79,855.4 | |
| Per Coach | 20.00 | 2,51,888.45 | — | ||
| Cost towards Must change items for Overhauling of Axle mounted disc brake system of POWER CAR coaches SS II/M36 schedule (Kit for Brake controls and WSP only) including GST @ 18 % | — | — | — | 50,37,769 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Faiveleytenderdocumentforupload.pdf
ATTACHMENT
ACS11.pdf
ATTACHMENT
GCC-2022-uptoACS6.pdf
ATTACHMENT
IndianRailwaysStandardGeneralConditionsofContractApril- GCC works ACS 7
ATTACHMENT
IndianRailwaysStandardGeneralConditionsofContractApril- GCC works ACS 8
ATTACHMENT
Pt.IAdvanceCorrectionSlip_9ACS-9-
ATTACHMENT
2022AdvanceCorrectionSlipNo_10ACS-10-
ATTACHMENT
2024_09_25-IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_7ACS-71.pdf
ATTACHMENT
2024_12_20-IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2025_01_09-2022-CE-I-CT-GCC-2022-POLICY-Pt.IAdvanceCorrectionSlip_9ACS-9-Regardingperformanceguarantee2.pdf
ATTACHMENT
2025_03_04-RBCE_CE-I-CTIRGCCApril-2022AdvanceCorrectionSlipNo_10ACS-10-Regardingarbitrationclause.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .