Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹19,640
Closing Date
16 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer
RnB Division Kralpora
Construction of Culvert at Kalipora Kul at Mir Mohalla Kalipora Connecting Kukroosa Kalipora
2026_PWDJK_323759_4
E tendering NIT No 36/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
45 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division Kralpora
₹19,640
7 Sept 2026
7 Sept 2026
17 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
7 Sept 2026 - 14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil | 46.98 | Cum | 256.85 | ₹12,066.81 |
| 2 | dewatering of trenches, requireddiversion during execution and disposal of the same (Complete job) | 2 | No | 7,500 | ₹15,000 |
| 3 | Supply and laying of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density and level surface including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 16.93 | Cum | 1,000 | ₹16,930 |
| 4 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level. including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 1.36 | Cum | 5,202.9 | ₹7,075.94 |
| 5 | Centering & Shuttering using kitply including strutting propping etc & removal of form work including all leads, lifts, costs & carriages upto site of work complete in Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete | 9.5 | Sqm | 286.35 | ₹2,720.33 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc | 78.59 | Sqm | 628.95 | ₹49,429.18 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 5.17 | Cum | 7,788.4 | ₹40,266.03 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 12.36 | Cum | 8,422.45 | ₹1,04,101.48 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all levels incl all costs and carriages Complete Job Thermo-Mechanically Treated bars of grade Fe-500D or more including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 1,753 | Kg | 123.2 | ₹2,15,969.6 |
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Welded, including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 3,750 | Kg | 138.2 | ₹5,18,250 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.33 MB
BOQ_1090825.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .