| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC S 32 UNIT NO 419 4TH FLOOR JMD MEGAPOLIS 419 424 BADSHAHPUR SOHNA ROAD SECTOR 48 GURUGRAM HARYANA 122018 | GURUGRAM | GURUGRAM | HARYANA | 122018 | ₹1.1 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.2 Cr+₹1.0 L (0.92%)Rejected-Finance | ₹1.2 Cr+₹1.0 L (0.92%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 Cr+₹4.8 L (4.16%)Rejected-Finance | ₹1.2 Cr+₹4.8 L (4.16%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.2 Cr+₹7.3 L (6.37%)Rejected-Finance | ₹1.2 Cr+₹7.3 L (6.37%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.3 Cr+₹15.0 L (13.2%)Rejected-Finance | ₹1.3 Cr+₹15.0 L (13.2%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
18 Dec 2020, 6:00 pmClosed
AGM(E-E) AAI Deoghar Airport
AAI, Deoghar Airport PO Gurukul Via Deosangh Dist Deoghar Pin 814114
Design, Supply, Installation, Testing and Commissioning of 330 KWp Grid Connected Solar PV Power System at AAI Deoghar Airport, Deoghar
2020_AAI_62299_1
AAI/DEO/AGM(E-E)/ E-NIT-03/2020-21/ 480
Open Tender
Electrical Works
Item Rate
120 days
AAI DEOGHAR AIRPORT
PQQ as per NIT
2 documents required · 2 mandatory
₹1,120
₹3.5 L
1 Jun 2021
16 Nov 2020
21 Dec 2020
17 Nov 2020
18 Dec 2020
17 Nov 2020
17 Nov 2020 - 3 Dec 2020
Amount
SH I: Supply of Solar PV Modules Supply Of Crystalline Solar Photo Voltaic (PV) Modules as per the technical specifications.
SH II : Roof Top Solar Power at ESS Building Design, Installation, Testing & Commissioning of Solar PV Modules of Item No. 01 of SH -I and Design Supply Installation Testing Commissioning of GI Array Structure, JBs, SMUs, SCBs, DC & AC Distribution Boards, Invertors/PCUs, & Associated Cables complete as required. 1. Design, Installation, Testing & Commissioning of the Solar PV modules mentioned at Item 1 of SH I for Roof Top of ESS Building along with Design, Supply, Installation, Testing & Commissioning of the items & components mentioned below and complete as required and confirm to the technical specifications enclosed. i. Hot dip galvanized steel structure (Zinc coating not less than 80 micron) for mounting of solar PV modules complete as required and as specified. ii. Cement concrete base for the steel structure including associated foundation works. iii. Junction boxes/String Monitoring Units/String Connector boxes and associated incoming and outgoing DC Power Copper Cables of suitable size & rating, communication cables and control cables and accessories complete as required & as specified. iv. Inverters Units along with associated incoming and outgoing power cables of suitable size & rating, control cables and communication cables & accessories complete as required & as specified. v. Associated/required AC & DC power distribution boards along with required & designed rating control and switchgear and associated incoming and outgoing power, control & communication cables complete as required & as specified. vi. Aluminium power cables of Suitable size & rating from AC side of inverter to LT Panel of Substation complete as required and as specified. vii. Earthing & Lighting Arrestor System for complete Solar PV System, invertor rooms, invertors, AC & DC Distribution boards, Invertors, Junction Boxes, SMUs & other current carrying equipments complete as required and as specified. viii. Any other item/work, which is not clearly specified but required to complete the work as per the scope of work mentioned & specified technical specifications complete as required and as specified. NOTE : Item No 01 of SH I & Item No 01 of SH II shall be measured and paid at the award rates as per the actual Solar Plant Capacity Installed, Capacity Demonstrated and meeting the scope of work, technical specifications and conditions of contract .
SH III : CAR PARK Solar Power Design, Installation, Testing & Commissioning of Solar PV Modules, Design of GI Steel Structure for Car Parking , JBs, SMUs, SCBs, DC & AC Distribution Boards, Invertors/PCUs, & Associated Cables complete as required ( excluding Steel Structure. Note: Supply of GI structurer Steel shall be excluding and measured in Item No. 01 of SH-IV. 1.Design, Installation, Testing & Commissioning of the Solar PV modules mentioned at Item 1 of SH I for CAR Park area along with Design, Supply, Installation, Testing & Commissioning of the items & components mentioned below and complete as required and confirm to the technical specifications enclosed. i. Junction boxes/String Monitoring Units/String Connector boxes and associated incoming and outgoing DC Power Copper Cables of suitable size & rating, communication cables and control cables and accessories complete as required & as specified. ii. Inverters Units along with associated incoming and outgoing power cables of suitable size & rating, control cables and communication cables & accessories complete as required & as specified. iii. Associated/required AC & DC power distribution boards along with required & designed rating control and switchgear and associated incoming and outgoing power, control & communication cables complete as required & as specified. iv. Aluminium power cables of Suitable size & rating from AC side of inverter to LT Panel of Substation complete as required and as specified. v. Earthing & Lightning Arrestor System for complete Solar PV System, invertors, AC & DC Distribution boards, Invertors, Junction Boxes, SMUs & other current carrying equipments complete as required and as specified. vi. Any other item/work, which is not clearly specified but required to complete the work as per the scope of work mentioned & specified technical specifications complete as required and as specified. vii. NOTE : Item No 01 of SH I & Item No 01 of SH III shall be measured and paid at the award rates as per the actual Solar Plant Capacity Installed, Capacity Demonstrated and meeting the scope of work, technical specifications and conditions of contract .
SH IV : SITC OF GI Structurer Steel at Car Parking 4.1 Supply installation, testing & commissioning Hot dip galvanised steel structure (Zinc coating not less than 80 micron) for mounting of solar PV modules complete as required and as specified.
4.2 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.. All kinds of soil.
4.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)
4.4 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement including centering & shuttering. - All work up to plinth level . 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
4.5 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
SH V: MONITORING system for Solar Power System Design, Supply, installation and testing and commissioning a solar radiation and environment monitoring system as per the requirements provided in the technical specifications and as required including soft integration of the Solar System with existing system.
SH VI : Operation & Compressive maintenance Contract. All inclusive Comprehensive Maintenance and operation & maintenance for the above installed (All Items Installed under SH I to SH V above) Complete Solar Photovoltaic Power Plant which includes & comprise of installed Solar PV modules, Structural support systems, lightning and earthing protection arrangements, solar system cables, AC & DC Power Cables, communication and control cables including Plant Solar Radiation & Environment Monitoring System and Complete along with software and hardware as well as water cleaning system as per the Technical specifications & Conditions of contract enclosed from the date of commissioning and completion of the project and handing over the Solar PV System to AAI. 6.1 1st Year (During 1st year of DLP)
6.2 2nd Year (During the 2nd year of DLP)
6.3 3rd Year (1st Year after DLP)
6.4 4th Year (2nd Year after DLP)
6.5 5th Year (3rd Year after DLP)
OAKRIDGE ENERGY PRIVATE LIMITED
SOLLUZ ENERGY PVT LTD
JAI MATA DI & COMPANY
SM RENERGY PRIVATE LIMITED
Sunborne Energy Services India Pvt Ltd
KSL CLEANTECH LIMITED
Arcedo Systems
Aegasun Energy LLP
HFM SOLAR POWER PRIVATE LIMITED
PREMIER ENERGIES LIMTIED
Vyomaa Energy Pvt. Ltd.
Tech Solar Solutions Pvt. Ltd
Bharat Heavy Electricals Limited
SWELECT ENERGY SYSTEMS LTD
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .