| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L1 | Accepted-AOC Being Lowest (L1) Bidder | |
| 2 | L2₹42.3 L+₹23,156.60 (0.55%)Rejected-Finance | L2 | Rejected-Finance Not being lowest (L1) Bidder | |
| 3 | L3₹44.3 L+₹2.2 L (5.28%)Rejected-Finance NO 237 7TH MAIN 3 D STAGE PILLANA GARDEN BANGALORE 560045 | BENGALURU URBAN | KARNATAKA | 560045 | L3 | Rejected-Finance Not being lowest (L1) Bidder | |
| 4 | L4₹45.6 L+₹3.5 L (8.29%)Rejected-Finance | L4 | Rejected-Finance Not being lowest (L1) Bidder | |
| 5 | L5₹46.9 L+₹4.8 L (11.3%)Rejected-Finance | L5 | Rejected-Finance Not being lowest (L1) Bidder |
| Sl No | Description | Qty | Unit | RK Builders L3 | SREE BALAJI CONSTRUCTIONS L6 | DHANUSH CONSTRUCTIONS CO. L4 | C R R CONSTRUCTIONS L2 | VP DEVELOPERS AND CONTRACTOR L1 | J CHALAPATHI L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced) in ground floor and paving not exceeding 15 cm thick above or below ground level and removal of entire debris as ordered outside MD land complete all as specified directed. | 61.6 | Cum | 800 ₹49,280 | 850 ₹52,360 | 740 ₹45,584 | 500 ₹30,800 | 350 ₹21,560 Lowest | 499 ₹30,738.4 |
| 2.00 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris to a distance not exceeding 50 mts and depositing where directed complete all as specified and directed. | 10.75 | Cum | 700 ₹7,525 | 600 ₹6,450 | 780 ₹8,385 | 500 ₹5,375 | 300 ₹3,225 Lowest | 499 ₹5,364.25 |
| 3.00 | Dismantling wrought iron or mild steel work of any description and in any position not otherwise provided for complete all as specified and as directed. | 20 | Qtl | 500 ₹10,000 | 10 ₹200 Lowest | 500 ₹10,000 | 500 ₹10,000 | 1,000 ₹20,000 | 249 ₹4,980 |
| 4.00 | Dismantling of AC Corrugated or semi corrugated sheet etc any thickness including ridges as in roof covering and stacking at site where directed and removal of debris to a outside MOD land and depositing where directed complete all as specified and directed | 765 | Sqm | 20 ₹15,300 | 35 ₹26,775 | 33 ₹25,245 | 30 ₹22,950 | 40 ₹30,600 | 11 ₹8,415 Lowest |
| 5.00 | Dismantling of wall and ceiling boards (fibre, pulp, insulation) or insulation boards /slab /blankets of any description and thickness including frame/grid of any description complete all as specified and directed | 470 | Sqm | 20 ₹9,400 | 10 ₹4,700 | 35 ₹16,450 | 30 ₹14,100 | 30 ₹14,100 | 5 ₹2,350 Lowest |
| 6.00 | Taking down cement plaster on brick or concrete surfaces of wall/ceiling and likes including racking out joints, hacking for keys scrubbing down with water etc any description including removal of rubbish outside MoD land, complete all as specified and directed.
Note : The rate quoted by the Contractor is deemed to be included necessary scafolding reqd. | 530 | SQM | 60 ₹31,800 | 35 ₹18,550 | 63 ₹33,390 | 35 ₹18,550 | 30 ₹15,900 | 15 ₹7,950 Lowest |
| 7.00 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks etc complete all as specified and directed. | 30 | RM | 100 ₹3,000 | 100 ₹3,000 | 50 ₹1,500 | 200 ₹6,000 | 30 ₹900 | 5 ₹150 Lowest |
| 8.00 | Taking up or down steel tubing and connections of 25mm bore including cleaning or removal to store complete all as specified and directed. | 50 | RM | 40 ₹2,000 | 10 ₹500 | 35 ₹1,750 | 30 ₹1,500 | 40 ₹2,000 | 5 ₹250 Lowest |
| 9.00 | Taking up or down GI tubing and connections 32mm bore including cleaning or removal to store complete all as specified and directed. | 70 | RM | 40 ₹2,800 | 10 ₹700 | 35 ₹2,450 | 35 ₹2,450 | 40 ₹2,800 | 6 ₹420 Lowest |
| 10.00 | Dismentling of PVC/ RCC water storage tank of capacity exceeding 500 litre but not exceeding 1000 litre, including removal of rubbish outside MoD land, complete all as specified and directed. | 3 | Each | 500 ₹1,500 | 600 ₹1,800 | 900 ₹2,700 | 600 ₹1,800 | 300 ₹900 | 50 ₹150 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
10 Jun 2026, 6:55 pmClosed
GE (Central) Bangalore
GE (CENTRAL) BANGALORE AGRAM POST BANGALORE KARNATAKA-560007
REP TO ROOF CEILING AC SHEET AND OTHER CONNECTED WORK IN OTM BLDGS OF ASC SOUTH 2 ATC UNDER AGE BR-II OF GE (CENTRAL) BANGALORE
2026_MES_766979_1
8620E
Open Tender
Civil Works - Others
Item Rate
270 days
ASC CENTRE (SOUTH) 2 ATC BANGALORE
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CENTRAL BANGALORE
₹98,000
Yes
4 Aug 2026
21 May 2026
13 Jun 2026
21 May 2026
10 Jun 2026
5 Jun 2026
22 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (un-reinforced) in ground floor and paving not exceeding 15 cm thick above or below ground level and removal of entire debris as ordered outside MD land complete all as specified directed. | 61.6 | Cum | - | - |
| 2 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris to a distance not exceeding 50 mts and depositing where directed complete all as specified and directed. | 10.75 | Cum | - | - |
| 3 | Dismantling wrought iron or mild steel work of any description and in any position not otherwise provided for complete all as specified and as directed. | 20 | Qtl | - | - |
| 4 | Dismantling of AC Corrugated or semi corrugated sheet etc any thickness including ridges as in roof covering and stacking at site where directed and removal of debris to a outside MOD land and depositing where directed complete all as specified and directed | 765 | Sqm | - | - |
| 5 | Dismantling of wall and ceiling boards (fibre, pulp, insulation) or insulation boards /slab /blankets of any description and thickness including frame/grid of any description complete all as specified and directed | 470 | Sqm | - | - |
| 6 | Taking down cement plaster on brick or concrete surfaces of wall/ceiling and likes including racking out joints, hacking for keys scrubbing down with water etc any description including removal of rubbish outside MoD land, complete all as specified and directed.
Note : The rate quoted by the Contractor is deemed to be included necessary scafolding reqd. | 530 | SQM | - | - |
| 7 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks etc complete all as specified and directed. | 30 | RM | - | - |
| 8 | Taking up or down steel tubing and connections of 25mm bore including cleaning or removal to store complete all as specified and directed. | 50 | RM | - | - |
| 9 | Taking up or down GI tubing and connections 32mm bore including cleaning or removal to store complete all as specified and directed. | 70 | RM | - | - |
| 10 | Dismentling of PVC/ RCC water storage tank of capacity exceeding 500 litre but not exceeding 1000 litre, including removal of rubbish outside MoD land, complete all as specified and directed. | 3 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_858973.xls
BOQ • 1.85 MB
Tender8620E.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .