Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrQualified 0 KISHANI KISHANI KISHANI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹2.0 Cr | L1 | Qualified MII |
| 2 | L2₹2.5 Cr+₹48.4 L (24.1%)Qualified AMBALA CANTT AMBALA HARYANA 133006 | AMBALA | HARYANA | 133006 | ₹2.5 Cr+₹48.4 L (24.1%) | L2 | Qualified MSE, MII, Category: General |
| 3 | L3₹3.1 Cr+₹1.1 Cr (52.7%)Qualified B 12 SECTOR 81 NOIDA NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹3.1 Cr+₹1.1 Cr (52.7%) | L3 | Qualified MSE, MII |
| 4 | L4₹4.1 Cr+₹2.1 Cr (105.5%)Qualified 590 UNNAMED ROAD SECTOR 8 MANESAR GURUGRAM HARYANA GURGAON HARYANA 122051 | GURUGRAM | HARYANA | 122051 | ₹4.1 Cr+₹2.1 Cr (105.5%) | L4 | Qualified MSE, MII, Category: General |
| 5 | Disqualified GROUND FLOOR G 2 MAHAVEER VEGETARIAN SOCIETY NIRANJAN PARK NAJAFGARH ROAD NIRANJAN PARK SOUTH WEST DELHI DELHI 110043 UDYAM DL 10 0047111 | WEST DELHI | DELHI | 110043 | - | - | Disqualified MII |
Tender Value
Refer Docs
EMD Value
₹4.9 L
Closing Date
16 Aug 2023, 3:00 pmClosed
Supply and installation of Pre Fab Huts including foundation
5054490
GEM/2023/B/3712870
Two Packet Bid
Prefab puf panel huts for jawan barracks,Prefab puf panel huts for jawan barracks,Prefab puf panel
90 days
Delhi; South West Delhi, Delhi; Varanasi, Uttar Pradesh; Kangra, Himachal Pradesh; Patna
Total value wise evaluation
BOQ
11 documents required · 11 mandatory
3 yrs
₹3
30%
₹4.9 L
16 Aug 2023
1 Aug 2023
16 Aug 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Prefab puf panel huts for jawan barracks | Prefab Puf panel huts for jawan of size 19.52 mtr x5.50 mtr with 1.52 mtr varandah (as per approved by MHA & circulated vide order dated 25.03.2019 along with civil work i.e. providing of foundation, flooring, finishing, electrical connection i/c fitting etc. complete in all respect as mentioned in drawings, inventory, specifications etc. | 2 | Nos | [email protected] | 90 |
| 2 | Prefab puf panel huts for jawan barracks | Prefab Puf panel huts for jawan of size 19.52 mtr x5.50 mtr with 1.52 mtr varandah (as per approved by MHA & circulated vide order dated 25.03.2019 along with civil work i.e. providing of foundation, flooring, finishing, electrical connection i/c fitting etc. complete in all respect as mentioned in drawings, inventory, specifications etc. | 2 | Nos | [email protected] | 90 |
| 3 | Prefab puf panel huts for toilet block | Prefab puf panel huts for toilet block of size 9.76mtr x 5.50 mtr similar size of barrack (as approved by MHA & circulated vide order dated 25.03.2019) along with civil works i.e. providing of foundation, flooring, finishing, water supply, sanitary, plumbing, septic tank, electrical connections i/c fitting etc. complete in all respect as metioned in drawings inventory, specifications etc. | 1 | Nos | [email protected] | 90 |
| 4 | Prefab puf panel huts for jawan barracks | Prefab Puf panel huts for jawan of size 19.52 mtr x5.50 mtr with 1.52 mtr varandah (as per approved by MHA & circulated vide order dated 25.03.2019 along with civil work i.e. providing of foundation, flooring, finishing, electrical connection i/c fitting etc. complete in all respect as mentioned in drawings, inventory, specifications etc. | 2 | Nos | [email protected] | 90 |
| 5 | Prefab puf panel huts for toilet block | Prefab puf panel huts for toilet block of size 9.76mtr x 5.50 mtr similar size of barrack (as approved by MHA & circulated vide order dated 25.03.2019) along with civil works i.e. providing of foundation, flooring, finishing, water supply, sanitary, plumbing, septic tank, electrical connections i/c fitting etc. complete in all respect as metioned in drawings inventory, specifications etc. | 1 | Nos | [email protected] | 90 |
| 6 | Prefab puf panel huts for jawan barracks | Prefab Puf panel huts for jawan of size 19.52 mtr x5.50 mtr with 1.52 mtr varandah (as per approved by MHA & circulated vide order dated 25.03.2019 along with civil work i.e. providing of foundation, flooring, finishing, electrical connection i/c fitting etc. complete in all respect as mentioned in drawings, inventory, specifications etc. | 2 | Nos | [email protected] | 90 |
| 7 | Prefab puf panel huts for toilet block | Prefab puf panel huts for toilet block of size 9.76mtr x 5.50 mtr similar size of barrack (as approved by MHA & circulated vide order dated 25.03.2019) along with civil works i.e. providing of foundation, flooring, finishing, water supply, sanitary, plumbing, septic tank, electrical connections i/c fitting etc. complete in all respect as metioned in drawings inventory, specifications etc. | 1 | Nos | [email protected] | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5054490.pdf
GEM_BID
tecnical-documents_2023-07-19-11-22-44_e35544281a93d17c06587c815b966003.pdf
BOQ
boq1_2023-07-19-11-22-45_4f126ef173041e9a530e57a531f4acba.csv
BOQ
1689747923.xlsx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .