Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -26.00% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹4,792.57 (4.07%)Admitted-Fee/PreQual/Technical/Finance | -22.99% | ₹1.2 L+₹4,792.57 (4.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.3 L+₹7,953.16 (6.76%)Admitted-Fee/PreQual/Technical/Finance | -21.00% | ₹1.3 L+₹7,953.16 (6.76%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.4 L+₹20,517.56 (17.4%)Admitted-Fee/PreQual/Technical/Finance | -13.10% | ₹1.4 L+₹20,517.56 (17.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹4,770
Closing Date
30 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of Bathroom at Masjid Shareef Abrahim W9 at Allachizeb
2026_RDPR_317078_1
NIT NO 70 OF 2026-27 ADF QADERABAD
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹4,770
6 Aug 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
21 Jul 2026 - 21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 12 | cum | 479.3 | ₹5,751.6 |
| 2 | P/l of stone soling / RBM including all carriages. | 1.06 | cum | 1,000 | ₹1,060 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate. | 2.5 | cum | 5,733.6 | ₹14,334 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 3.48 | cum | 7,571.6 | ₹26,349.17 |
| 4.1 | Extra for brick work in super structure | 2.32 | cum | 1,455.3 | ₹3,376.3 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.3 | cum | 9,821.25 | ₹12,767.63 |
| 6 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level TMTbars | 1.4 | qtl | 11,535 | ₹16,149 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: | 1 | Na | 1 | ₹1 |
| 7.01 | Suspended Floors | 3 | sqm | 718.2 | ₹2,154.6 |
| 7.02 | Walls | 12 | sqm | 286.35 | ₹3,436.2 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1037316.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .