| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | Admitted-Finance |
Tender Value
₹3.8 L
EMD Value
₹3,800
Closing Date
4 Jan 2022, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Construction of a cabin for accommodating the shift operators in ETP area.
2021_EB_217104_1
SE/Civil/MTPS-II/OT-44/2021-22
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam.
2 documents required · 2 mandatory
₹0
₹3,800
Yes
7 Jan 2022
18 Dec 2021
5 Jan 2022
18 Dec 2021
4 Jan 2022
18 Dec 2021
Amount
Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2 m in all types of soil and disposing the excess soil away from the site as directed by the Engineer at site including labour charges, hire charges for tools and plants, leads & lifts, etc. complete.
Providing PCC 1:4:8 using 40 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, curing, leads & lifts, etc. complete.
Providing Random Rubble Masonry in CM 1:5 for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads & lifts, etc. complete.
Brick work in CM 1:4 using Fly ash Bricks for super structure as directed by the Engineer in-charge including cost of all materials, scaffolding charges, labour charges, T&P, curing, leads & lifts, etc., complete.
Providing and placing of RCC 1:1½:3 using 20 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, centring, shuttering, curing, leads and lifts, etc. complete but excluding cost of reinforcement. a) Plinth & Lintel beam
Providing and placing of RCC 1:1½:3 using 20 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, centring, shuttering, curing, leads and lifts, etc. complete but excluding cost of reinforcement. b) Roof slab
Supplying, fabricating and placing in position of steel reinforcement for RCC works as directed by the Engineer at site including cost of steel, binding wire, labour charges for cutting, bending, binding, leads and lifts etc., complete.
Supplying, Fabricating and Fixing in Position of MS fully panelled steel Door of single leaf of required size using 40x40x6 mm MS Angles for door frame, 30x30x5mm MS Angles for shutter frame by adopting 5 Nos. horizontally, 2 nos. vertically, shutter covered with 18 Gauge MS sheet, finished neatly as directed by the Engineer at site, including cost of all materials, providing locking arrangements, holdfast, hinges, labour, lead, lifts, etc complete.
Supplying and fixing in position of partly glazed mild steel windows of required size using 23x18x18x 3mm 'Z' section for window main frame, 46x23x20x3mm 'J' section for intermediate frame, 23x18x 18x3mm 'Z' section for shutter frame with 4 leaves top leaves glazed with 4mm thick plain glass, bottom leaves panelled with M.S sheet of 18gauge with 10mm square bar grill at 100mm c/c, 4 nos. of hold fasts, handle pulleys, latches with locking arrangements, including cost of fabrication, transporting, lifting and fixing, embedding the hold fasts in walls rigidly with concrete PCC 1:1.5:3, cost of all material, labour charges, T&P, leads & lifts, etc. complete.
Plastering in C.M 1:3, 10 mm thick for ceiling surfaces including cost of all materials, scaffolding charges, Labour charges, curing, T&P, Lead, Lift, etc., complete.
Plastering in CM 1:5, 12mm thick for wall surfaces including cost of all materials, scaffolding charges, Labour charges, curing, T&P, Leads and Lifts, etc. complete.
Supplying and laying one side polished Cuddapah slab of 30mm thick for shelves including cost of all materials, labour charges, leads and lifts etc. complete.
Providing floor finish with vetrified tiles of approved make, colour and quality and of size 600x600x8mm over 10mm thick Cement mortar 1:3 bedding and pointing with same coloured cement in all floors including cutting chase in walls wherever required, cost of all materials labour charges leads & lifts, curing T&P, personal protective equipment’s, other safety appliances, etc. complete.
Providing two coats of Oil bound distemper of approved quality and colour over a coat of ready mixed primer to the interior wall surfaces as directed by the Engineer at site, including cost of all materials, labour charges, scaffolding charges, leads & lifts etc., complete.
Colour washing with two coats of cement paint over a coat of white cement for the exterior surfaces including cost of all materials, scaffolding, labour, curing, leads & lifts etc., complete.
Providing one course of best pressed tiles of size 230x230x 20mm as weathering course for roof slab embedded in 12mm thick Cement mortar 1:3 mixed with crude oil @ 10% by weight of cement over a bed of brick jelly in pure slacked lime in the ratio of 32:12.50 (32 parts of Brick jelly to 12.5 part of lime) to an average thickness of 80mm laid with required slope well beaten with wooden mallet and pointed with the same oiled mortar including cost of all materials, Labour, curing, Lead, Lift etc., complete.
Painting the steel work with two coats of enamel paint of approved quality and colour over a coat of primer including cost of all materials, labour charges, brush, leads & lifts etc., complete. 179.00 1m2 2506.00
NVS and Co
AGNI AMMAN & CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .