| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17,413Accepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹20,143+₹2,730 (15.7%)Accepted-Finance SHAKTI NAGAR KISHTWAR KISHTWAR JAMMU KASHMIR 182204 | KISHTWAR | JAMMU AND KASHMIR | 182204 | 2 | Accepted-Finance L2 | |
| 3 | 3₹23,225+₹5,812 (33.4%)Accepted-Finance | 3 | Accepted-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
7 Jun 2021, 4:00 pmClosed
Ex Engg
Ex Engineer ED kishtwar
pl refer sbd
2021_PDD_125624_1
ENIT NO. 37 OF 2021-22
Open Tender
Electrical Works
Item Rate
365 days
kishtwar
pl refer tender doc
3 documents required · 3 mandatory
₹1,000
Ex Engg ED kishtwar
₹40,000
3 Aug 2021
31 May 2021
8 Jun 2021
31 May 2021
7 Jun 2021
31 May 2021
31 May 2021 - 7 Jun 2021
Amount
Unloading of ST Poles 13 Mtr Long
Unloading of ST Poles 11Mtr Long
Unloading of ST Poles 9 Mtr Long
Unloading of ST Poles 8 Mtr Long
Unloading of P.C.C. Pole 8 Mtr Long
Loading of ST Poles 13 Mtr Long
Loading of ST Poles 11Mtr Long
Loading of ST Poles 9 Mtr Long
Loading of ST Poles 8 Mtr Long
Loading of P.C.C. Pole 8 Mtr Long
Dragging of Old /New/ PCC and ST Poles at a average distance upto 50 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking
Unloading of Old/New ACSR Conductor
Making of carriageable Bundles Weighing and Loading of Old/New ACSR Conductor
Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking
Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking
Unloading of 25 KVA Transformer (New/Repair/Damaged )
Unloading of 50/ 63 KVA Transformer (New/Repair/Damaged )
Unloading of 100/160 KVA Transformer (New/Repair/Damaged )
Unloading of 200/250/300 KVA Transformer (New/Repair/Damaged )
Unloading of 400/500 KVA Transformer (New/Repair/Damaged )
Unloading of 630 KVA Transformer (New/Repair/Damaged )
Loading of 25 KVA Transformer ( New/Repair )
Loading of 50/63 KVA Transformer ( New/Repair )
Loading of 100/160 KVA Transformer ( New/Repair )
Loading o f 200/250/300 KVA Transformer ( New/Repair )
Loading of 400/500 KVA Transformer ( New/Repair )
Loading of 630 KVA Transformer ( New/Repair )
Dragging of Repaired /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of Repaired /New 50/ 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of Repaired /New /Damaged 100/160 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
Dragging of Repaired /New /Damaged 200/250/300 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
Dragging of Repaired /New/Damaged 400/500 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of Repaired /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Unloading of Channel/Angle/Flat Iron
Loading of Channel/Angle/Flat Iron
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Unloading of Link/Knife/HG/DO/LA Set
Loading of Link/Knife/HG/DO/LA/GO Set
Unloading of CT/PT Unit
Loading of CT/PT Unit
Unloading of DPC CU/AL Wire /strip etc. and stacking .
Sorting,carriage and Issuance of DPC CU/AL Wire /strip to Divisional workshop .
Un-loading and Stacking of Workshop alied material such as, Electrical Kraft paper ,Lethoride paper ,PVC sheets ,Press card board pre-compressed solid ,HT Insulating gum,Aluminum Welding flux (L&T),Dhoti cloth cotton,Silica Gel.,Press board andPress Board Gutties , HV bushing ,LV Bushes ,Bakelite tubes ,HV Bush clamps etc.etc
Sorting,carriage and issuance of Workshop alied material such as, Electrical Kraft paper ,Lethoride paper ,PVC sheets ,Press card board pre-compressed solid ,HT Insulating gum,Aluminum Welding flux (L&T),Dhoti cloth cotton,Silica Gel.,Press board andPress Board Gutties , HV bushing ,LV Bushes ,Bakelite tubes ,HV Bush clamps etc.etc to Divisional workshop
Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)
Loading of allied material for HT/LT Line/Substations (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc)
Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
Unloading/Loading and stacking of Bamboo /Al Ladders /chain block etc.
Unloading/Loading and stacking of Single/Three Phase Meters
Unloading of PVC Cable single core 95/120/185mmsq
Unloading of PVC Cable single core 300/400/630mmsq
Loading of PVC Cable single core 95/120/185mmsq
Loading of PVC Cable single core 300/400/630mmsq
Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
Un Loading and stacking of Fresh Transformer oil
Dragging and Loading /issuance of Fresh Transformer oil
Unloading/Loading and stacking of Single phase/three phase Energy meters
un laoding ,carriage and loading/issuance of Synthetic enamel Paint thinner,Turpentine Oil,Transformer oil Old/Fresh,Varnish,Zinc Cromite (Yellow) etc. and issuance to. Divisional Workshop
Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes alongwith drilling of holes etc.
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6/100X75X6 alongwith drilling of holes etc.
Fabrication of fi ties ,fi clamps from MS flat (suitable for 8mtr ,9mtr,11 mtr and 13 mtr poles)
Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards
Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards
Fabrication of ST poles by way of drilling of extra holes
Fabrication of foundation bolts from MS tor steel including threadding as per REC Standards
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
Unloading/Loading of Straight jointer kit/Heat shrin kable Kit for AB/XLPE cables of HT/LT Lines
Painting of Channel , Angle iron etc with red oxide
DEV ENGINEERS
Malik Brothers Electrical Contractor and Suppliers
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .