Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MAYILADUTHURAI | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,920
Closing Date
2 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OandM TKGTPS
SE O and M TKGTPS
Overhauling of Condenser Cooling water pump no3
2020_EB_185210_1
Enq.no.W-210
Open Tender
Miscellaneous Works
Works
10 days
TKGTPS, Thirumakkottai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,920
9 Dec 2020
17 Nov 2020
3 Dec 2020
17 Nov 2020
2 Dec 2020
17 Nov 2020
180 days
Amount
Complete Overhauling of condenser cooling water pump no.3
Charges for Dismantling of condenser cooling water pump such as decoupling of pump from motor , pre alignment checks, opening of casing parting plane bolts, loosening of glands , lifting of upper casing , rotor assembly , bearings and its housings, etc including the cost of cutting gas and consumables as directed by the Engineer in charge.
Charges for cleaning and inspection of pump internals such as stuffing box, gland sleeves, bearings,impeller,wear rings and shaft sleeves; shaft trueness and taking clearance values,etc including the cost of cutting gas and consumables as directed by the Engineer in charge
Charges for renewal of pump bearings, blue matching the bearings, renewal of impeller wear rings and gland sleeves, etc including the cost of cutting gas and consumables as directed by the Engineer in charge
Charges for renewal of impeller, shaft and its sleeves; fabrication of fixtures for removal of impeller if necessary including the cost of matching works, consumables, cutting gas, etc as directed by the Engineer in charge
Charges for assembling the complete pump, replacement of gland ropes, coupling, checking of alignment readings, conducting trial run and normalizing the pump etc including the cost of cutting gas and consumables as directed by the Engineer in charge
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .