Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.0 L+₹27,957.72 (10.1%)Rejected-Finance VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | THE NEW NATIONAL CO-OP. L&C SOCIETY LIMITED L1 | EVERGREEN EARTH MOVERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 12.01 | cum | 182 ₹2,185.82 Lowest | 191 ₹2,293.91 |
| 2.00 | Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street/Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, watering, including the cost of dewatering of rain water, diversion for traffic, night signals. Providing and fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects. 28.1 (a) Earthwork upto 1.5 meter Depth (i) all classes of soil except rocky | 375 | cum | 109 ₹40,875 Lowest | 114 ₹42,750 |
| 3.00 | Providing, Lowering precast concrete NP-2 Plain end pipes and Collar with reinforcement in trenches to corrrect gradient and alignment cutting of Reinforcement cement concrete Plain end Pipes stringing in trenches , jointing ends and fixing collar with cement mortar 1:2 as per IS 458; 2003 into trenches for all depths and laying out same to correct alingnment gradients levels etc. complete in all respect. RCC Pipe NP-2, 500 i/d | 100 | mtr | 1,736 ₹1,73,600 Lowest | 1,984 ₹1,98,400 |
| 4.00 | cement concrete 1:4:8 with stone aggregate with 40 mm gauge mixing by manual means | 0.81 | cum | 4,830 ₹3,912.3 Lowest | 5,058 ₹4,096.98 |
| 5.00 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth | 4.73 | cum | 5,565 ₹26,322.45 Lowest | 5,770 ₹27,292.1 |
| 6.00 | 10 mm thick Cement Plaster 1:4 | 20.26 | sqm | 172 ₹3,484.72 Lowest | 172 ₹3,484.72 Lowest |
| 7.00 | Cold twisted detormed (Ribbed/Tore steel) BaRS (Fe 500 grade as per IS 1786-2008) , for RCC works, where not including in the complete rate of RCC including bending and binding placing in position complete | 0.32 | qtl | 7,827 ₹2,504.64 Lowest | 7,827 ₹2,504.64 Lowest |
| 8.00 | Cement concrete 1:2:4 with stone ballast or shingle mixing by manual means | 0.44 | cum | 5,985 ₹2,633.4 Lowest | 6,235 ₹2,743.4 |
| 9.00 | Dismentling brickwork tile masonry or tile lining in cement | 3.45 | cum | 718 ₹2,477.1 Lowest | 718 ₹2,477.1 Lowest |
| 10.00 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 3.45 | cum | 5,500 ₹18,975 | 5,474 ₹18,885.3 Lowest |
Tender Value
₹3.4 L
EMD Value
₹6,804
Closing Date
15 Jul 2024, 1:00 pmClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground water Division, Bathinda
Estimate For Laying U/G pipeline from outlet RD 48207 /R OF Bathinda Disty
2024_WR_123120_1
08/22A/2024-25
Open Tender
Civil Works - Canal
Item Rate
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹6,804
Yes
Bathinda
23 Aug 2025
1 Jul 2024
15 Jul 2024
1 Jul 2024
15 Jul 2024
1 Jul 2024
5 Jul 2024
Amount
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street/Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, watering, including the cost of dewatering of rain water, diversion for traffic, night signals. Providing and fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects. 28.1 (a) Earthwork upto 1.5 meter Depth (i) all classes of soil except rocky
Providing, Lowering precast concrete NP-2 Plain end pipes and Collar with reinforcement in trenches to corrrect gradient and alignment cutting of Reinforcement cement concrete Plain end Pipes stringing in trenches , jointing ends and fixing collar with cement mortar 1:2 as per IS 458; 2003 into trenches for all depths and laying out same to correct alingnment gradients levels etc. complete in all respect. RCC Pipe NP-2, 500 i/d
cement concrete 1:4:8 with stone aggregate with 40 mm gauge mixing by manual means
First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth
10 mm thick Cement Plaster 1:4
Cold twisted detormed (Ribbed/Tore steel) BaRS (Fe 500 grade as per IS 1786-2008) , for RCC works, where not including in the complete rate of RCC including bending and binding placing in position complete
Cement concrete 1:2:4 with stone ballast or shingle mixing by manual means
Dismentling brickwork tile masonry or tile lining in cement
First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level.
EVERGREEN EARTH MOVERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .