Loading…
Loading…
Tender Value
₹206.7 Cr
EMD Value
₹4.1 Cr
Closing Date
4 Sept 2026, 11:00 am
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
14/08/2026 11:30
Lowest to Highest
180 days
Expenditure
Capital (Works)
PROJECT
14 conditions · 2 needing a document upload
Refer 2.2.2 Qualification requirements of Bidders ( Sub para 2.2.2.2) Amendment no-3 dtd: 09.07.2026.For rest details please refer RFP document.
Refer 2.2.2 Qualification requirements of Bidders ( Sub para 2.2.2.1 to 2.2.2.9 of RFP document). For rest details please refer RFP document.
Similar nature of works: Refer 2.2.2 Qualification requirements of Bidders ( Sub para 2.2.2.1 to 2.2.2.9 of RFP document). For rest details please refer RFP document.
10 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall inspect the proposed site of switching posts before bidding and acquaint themselves with the site conditions and working hours and shall take into consideration each and every factor applicable for work execution in their bid.
All rates quoted in the tender shall be deemed to be inclusive of all Taxes royalties payable by the contractor{s} to the Government or public body or local authority and no additional amount will be paid or claim entertained on this account by the Railway.
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the website from time to time
The tenderer shall inspect the proposed site of work and acquaint himself themselves with the site conditions working hours layout of laid trees and shrubs that he they cut for making stacking space for aggregates approach road path way available working area local conditions etc and all other relevant items connected with the execution of the work No claims shall be entertained from the contractors for making his their own arrangement for approaches approach roads etc in and outside Rly Land and contractor will bear entire expenses such as road taxes payment for right of Way etc to outsiders and for constructions of approaches approach road etc
If the tenderer expires after the submission of his tender or after the acceptance of this tender the railway shall deem such tender as cancelled If a partner of firm expires after the submission of their tender or after acceptance of their tender the Railway shall deems such tender as cancelled unless the firm retains its character.
The tenderers shall not add any conditions on their own either in their covering letter or in the tender documents while submitting their offer. Any such conditions if stated and if are in violation of the Railways tender conditions or having financial implication may lead to summary rejection of the offer. Railway reserves the right to reject such tenders summarily without assigning any reasons whatsoever.
Whether submitted SCANNED AND ATTESTED certificates in support of TECHNICAL CRITERIA
Design/Modification, Supply, Erection, Testing and Commissioning of 132kV/55 kV Scott connected Traction Sub Station and switching posts with AT between feeding Itarsi (Excl.) - Shridham (Incl.) section (without SCADA) of Jabalpur Division, W C Railway in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System of WCR to meet 3000 MT loading target.
JBP-PROJECT-EPC-2025-01R~WCR
JBP-PROJECT-EPC-2025-01R
Open
Works - General
18 Months
Jabalpur, Madhya Pradesh
₹0
₹4.1 Cr
4 Aug 2026
4 Aug 2026
21 Aug 2026
14 Aug 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,06,72,56,267 | ||
| — | — | — | 2,06,72,56,267 | ||
| Supply, with AT between with Up-gradation | :- Design/Modification, switching posts in connection loading target. | Erection, Testing and Commissioning feeding Itarsi (Excl.) - Shridham (Incl.) of Electric Traction System from 1x25 | Scott connected SCADA) of Jabalpur System of |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GPSdiagramETSRIDRev1.pdf
ATTACHMENT
132KV2x25KVscottTRAutoTRspecification_1.pdf
ATTACHMENT
33TypicallayoutofcabletrenchfoundationcablescheduleofSwitchingstation2x25kVATSystemforfourlinesection._3.pdf layout cable
ATTACHMENT
132KV-25KVCTspecification.pdf
ATTACHMENT
132KV-25KVPTspecification.pdf
ATTACHMENT
132KV-50KV-25KVSPI-DPI-TPImannualoperatedspec.pdf
ATTACHMENT
132KVoutdoorSF6CBspec.pdf
ATTACHMENT
a227_362RelaycontrolTSSSPSSPspec.pdf
ATTACHMENT
b237_336controlroomSPSSPdrawing.pdf
ATTACHMENT
batteryspecification.pdf
ATTACHMENT
controlroombuildingsTSSSPSSPdrawing.pdf
ATTACHMENT
controlroomofTSSdrawing.pdf
ATTACHMENT
FinaldraftspecificationNoTI-SPC-PSI-AFL-02401.pdf
ATTACHMENT
finalearthingspecificationof25kVand2x25kVsystem.pdf
ATTACHMENT
OHEguideline.pdf
ATTACHMENT
RDSOOHEguidellineTI-IN-0042.pdf
ATTACHMENT
RDSOOHEguidellineTI-IN-0043rev-1.pdf
ATTACHMENT
RDSOcrossapprovalprocedureTIIN044.pdf
ATTACHMENT
RDSOinstructionsforimplementationofCyberSecurityintheexistingSCADAsystems.pdf
ATTACHMENT
RDSOTSSSPSSP02LineDiagram.pdf
ATTACHMENT
Revised160kmphPSIguidelines.pdf
ATTACHMENT
RevisedControlroombuildingdrgTSS.pdf
ATTACHMENT
SeriesreactorandshuntcapacitorbankRDSOspecification.pdf
ATTACHMENT
SpcTI-SPC-PSI-PROTCT-7101Controlrelaypanelspec.pdf
ATTACHMENT
TI-SPC-PSI-40-150-CHGR-1210.pdf
ATTACHMENT
TI-SPC-PSI-200-250-CHGR-0210.pdf
ATTACHMENT
Specno-TI-SPC-PSI-LVCBIN-0121.pdf
ATTACHMENT
spsspbuildings.pdf
ATTACHMENT
33TypicallayoutofcabletrenchfoundationcablescheduleofSwitchingstation2x25kVATSystemforfourlinesection._3.pdf
ATTACHMENT
2x25kvTSSSPSSPBSPRDSOdrawingasperletterdtd10032025_comp.pdf
ATTACHMENT
ET-SRIDlocationplan16nos.pdf
ATTACHMENT
GeneralpowersupplydiagramET-SRID.pdf
ATTACHMENT
EPCAgreementuptoAmendment33007final.pdf
ATTACHMENT
EPCRFPuptoAmendno-2AnnexureVIIFinal.pdf
ATTACHMENT
FinalRFP040826AnnexVII.pdf
ATTACHMENT
FinalEPCagmt040826Amendno-3_compressed.pdf
ATTACHMENT
ProvisionofAdditionalstoreroomibTSSSPSSP_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].