Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
Closing Date
30 Dec 2021, 4:30 pmClosed
xen rews kathua
xen rews kathua
Constt. of lane with allied work NHO Anchal Singh wno 2 Kudera
2021_RDPR_154792_6
e-NIT No. 238 REW/K of 2021 Dated 23 /12/
Open Tender
Civil Works
Item Rate
30 days
basohli
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rews kathua
Exempted
8 Jan 2022
24 Dec 2021
31 Dec 2021
25 Dec 2021
30 Dec 2021
25 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kind of soil
P/L in position dry crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
CEMENT PLASTER (IN FINE SAND)20mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
P/l 50mm thick Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete
Reinforced cement conc. Work in beam , suspended floor , roofs having slope upto 15 degree, landing balconies, shelves, chsjjas, lintel, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1 cement:1.5 coarse sand: 3 graded stone agg. 20 mm nominal size.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form Foundations, footings, bases of columns etc. for mass concrete
KULBUSHAN SINGH
Vandna
YASHPAL BADIAL
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .