Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.0 LAccepted-AOC P O KAHILIPARA GUWAHATI DIST KAMRUP METRO PIN 781019 ASSAM | GUWAHATI | KAMRUP METRO | ASSAM | 781019 | ₹45.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹46.3 L+₹1.3 L (3.00%)Rejected-AOC | ₹46.3 L+₹1.3 L (3.00%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹50.0 L+₹5.0 L (11.1%)Rejected-AOC | ₹50.0 L+₹5.0 L (11.1%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹50.3 L+₹5.3 L (11.8%)Rejected-AOC | ₹50.3 L+₹5.3 L (11.8%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹54.4 L+₹9.4 L (20.9%)Rejected-AOC H NO 2 BYE LANE 1 BELTOLA LAKHIMANDIR PO PS BASISTHA KAMRUP M ASSAM PIN 781038 | BASISTHA | KAMRUP M | ASSAM | 781038 | ₹54.4 L+₹9.4 L (20.9%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Ritumoni Kalita L3 | Balin Deka L2 | Anurag Baishya L5 | M. K. ENTERPRISE L4 | HARAJYOTI DAS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 2.52 | cum | 1,500 ₹3,780 | 1,050 ₹2,646 | 1,782.07 ₹4,490.82 | 1,500 ₹3,780 | 500 ₹1,260 Lowest |
| 1.02 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles above 25 mm and up to 40 mm | 331.96 | sqm | 100 ₹33,196 | 50 ₹16,598 | 98.04 ₹32,545.36 | 80 ₹26,556.8 | 44 ₹14,606.24 Lowest |
| 1.03 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :
Of area 3 sq. metres and below | 100 | each | 200 ₹20,000 | 200 ₹20,000 | 317.63 ₹31,763 | 320 ₹32,000 | 45 ₹4,500 Lowest |
| 1.04 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer in-charge | 394.8 | sqm | 40 ₹15,792 | 30 ₹11,844 Lowest | 48.74 ₹19,242.55 | 56.35 ₹22,246.98 | 35 ₹13,818 |
| 1.05 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:
G.S. Sheet | 298.97 | sqm | 100 ₹29,897 | 80 ₹23,917.6 | 142.68 ₹42,657.04 | 150 ₹44,845.5 | 28 ₹8,371.16 Lowest |
| 1.06 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :
Of sectional area 40 square centimetres and above | 3.65 | cum | 2,500 ₹9,125 | 2,200 ₹8,030 Lowest | 3,875.12 ₹14,144.19 | 3,500 ₹12,775 | 2,400 ₹8,760 |
| 1.07 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.17 | cum | 2,500 ₹425 | 2,000 ₹340 Lowest | 3,071.83 ₹522.21 | 3,551.25 ₹603.71 | 3,100 ₹527 |
| 1.08 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | 5 | each | 100 ₹500 | 60 ₹300 Lowest | 96.92 ₹484.6 | 112.05 ₹560.25 | 112.05 ₹560.25 |
| 1.09 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 0.9 | cum | 180 ₹162 | 110 ₹99 Lowest | 153.53 ₹138.18 | 177.5 ₹159.75 | 177 ₹159.3 |
Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
6 Mar 2026, 5:00 pmClosed
Managing Director
Assam Industrial Development Corporation Ltd. (AIDC), R G Baruah Road Guwahati-24
Repair and renovation of Accounts department and Server room area inside AIDC Campus, R.G. Baruah Road, Guwahati - 24
2026_ICD_49957_2
No. 291333/385
Open Tender
Civil Works
Item Rate
60 days
AIDC Campus, R G Baruah Road Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,260
₹1.3 L
Yes
9 Jul 2026
24 Feb 2026
7 Mar 2026
24 Feb 2026
6 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 2.52 | cum | - | - |
| 1.02 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles above 25 mm and up to 40 mm | 331.96 | sqm | - | - |
| 1.03 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :
Of area 3 sq. metres and below | 100 | each | - | - |
| 1.04 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer in-charge | 394.8 | sqm | - | - |
| 1.05 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:
G.S. Sheet | 298.97 | sqm | - | - |
| 1.06 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :
Of sectional area 40 square centimetres and above | 3.65 | cum | - | - |
| 1.07 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.17 | cum | - | - |
| 1.08 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | 5 | each | - | - |
| 1.09 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 0.9 | cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
RFP.pdf
Tender Documents • 1.38 MB
Drawing.pdf
Additional Documents • 0.11 MB
BOQ_81744.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .