| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.8 CrAdmitted-Finance | -5.40% | ₹8.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.8 Cr+₹2.7 L (0.31%)Admitted-Finance | -5.11% | ₹8.8 Cr+₹2.7 L (0.31%) | L2 | Admitted-Finance |
| 3 | L3₹9.0 Cr+₹22.3 L (2.54%)Admitted-Finance 0 | -3.00% | ₹9.0 Cr+₹22.3 L (2.54%) | L3 | Admitted-Finance |
| 4 | No Rank₹7.1 CrAdmitted-Finance N A | -23.75% | ₹7.1 Cr | No Rank | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹31.7 L
Closing Date
24 Nov 2025, 2:00 pmClosed
Anil Kumar
GAIL GAS LTD
HIRING OF AGENCY FOR CIVIL CONSTRUCTION OF LNG LCNG FACILITY AT MIRZAPUR AND SONBHADRA OF GAIL GAS LIMITED
2025_GAILG_253091_1
GAIL GAS/NOIDA/2251/AK/2025-26/71
Open Tender
Miscellaneous Works
Percentage
180 days
Noida
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹31.7 L
Yes
Through VC
2 Mar 2026
31 Oct 2025
25 Nov 2025
31 Oct 2025
24 Nov 2025
7 Nov 2025
6 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | SOR- CIVIL WORKS | - | - | - | - | - |
| 2 | Vegetation Cleaning &
Tree Cutting | - | - | - | - | - |
| 3 | Cleaning Vegetation:-
Cleaning bushes including uprooting of rank vegetation, green bush wood, trees and saplings of girth upto 30cms (measured at a height of 1m above ground), stacking the serviceable materials and disposal of unserviceable materials at an unobjectionable place outside the premises including rubbish etc. upto any lead and all lift as per specification and direction of the Engineer-in-charge. (Payment will be made for actual site clearance area only). | 4,100 | M2 | 15 | ₹61,500 | 0.18% |
| 4 | Tree Cutting :-
Tree cutting (only of girth more than 30 cm above 1m above ground) along with removal of roots and stumps and handing over the same to Owner / Owner's Representative including paying royalties, disposal, taking approval from competent authorities etc. all complete, as per technical specifications and direction of Engineer-in-charge.
Note:- 1.Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies,loading/unloading, transportation, electric power, illumination and cost of handingover to owner/or his representative etc. complete in all respects as per scope of work and direction of Engineer-in-charge. | 10 | Each | 460 | ₹4,600 | 0.18% |
| 5 | Earthwork in Foundations | - | - | - | - | - |
| 6 | EXCAVATION-ALL KINDS OF SOIL 0 TO 1.5 M:-
Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual means for Footings, Plinth beams, pedestals, culverts, pits, trenches, roads or any structures etc. as directed, in all kinds of soils including soft rock and dis-integrated rock but excluding hard Rock for depth upto 1.5m from existing ground level in both dry and wet conditions including pumping and bailing out surface and subsoil water, slush removal,shoring & strutting if required including staking out of work as per specifications; taking spot levels on edges & centreline as per specifications, segregating the excavated earth in to serviceable and unserviceable earth; stacking the serviceable earth separately within plant premises for enabling reuse for backfilling or any other purpose as per instructions of GAIL GAS; carting away and disposing the unserviceable earth within Plant boundaries all compete as per instructions of GAIL GAS. The Measurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth. | 1,910 | M3 | 540 | ₹10,31,400 | 0.18% |
| 7 | EXCAVATION-ALL KINDS OF SOIL 1.5 TO 3 M:-
Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual means for Footings, Plinth beams, pedestals, culverts, pits, trenches, roads or any structures etc. as directed, in all kinds of soils including soft rock and dis-integrated rock but excluding hard Rock for depth beyond 1.5 m and upto & inclusive of 3 m from existing ground level in both dry and wet conditions including pumping and bailing out surface and subsoil water, slush removal,shoring & strutting if required including staking out of work as per specifications; taking spot levels on edges & centreline as per specifications, segregating the excavated earth in to serviceable and unserviceable earth; stacking the serviceable earth separately within plant premises for enabling reuse for backfilling or any other purpose as per instructions of GAIL GAS; carting away and disposing the unserviceable earth within Plant boundaries all compete as per instructions of GAIL GAS. TheMeasurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth. | 600 | M3 | 700 | ₹4,20,000 | 0.18% |
| 8 | EXCAVATION-ALL KINDS OF SOIL 3 TO 4.5 M:-
Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual means for Footings, Plinth beams, pedestals, culverts, pits, trenches, roads or any structures etc. as directed, in all kinds of soils including soft rock and dis-integrated rock but excluding hard Rock for depth beyond 3 m and upto & inclusive of 4.5 m from existing ground level in both dry and wet conditions including pumping and bailing out surface and subsoil water, slush removal,shoring & strutting if required including staking out of work as per specifications; taking spot levels on edges & centreline as per specifications, segregating the excavated earth in to serviceable and unserviceable earth; stacking the serviceable earth separately within plant premises for enabling reuse for backfilling or any other purpose as per instructions of GAIL GAS; carting away and disposing the unserviceable earth within Plant boundaries all compete as per instructions of GAIL GAS. TheMeasurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth. | 345 | M3 | 1,020 | ₹3,51,900 | 0.18% |
| 10 | HARD ROCK EXCAVATION-0 TO 1.5 M
Excavation in hard Rock as encountered in Footings, Plinth beams, pedestals, culverts, pits, trenches, roads or any structures etc. for depth upto 1.5 m from existing ground level in both dry and wet conditions including pumping and bailing out surface and subsoil water, slush removal,shoring & strutting if required all complete as per technical specifications and instructions of GAIL GAS/EPMC Engineer-in-Charge. Quoted rates are deemed to include stacking the excavated rock for enabling GAIL GAS/EPMC to take stack measurements & including shoring & strutting if any required. The stack measurement will be deducted by 50% for voids. After stack measurement is taken, the stack is to be disposed off at a suitable spot inside Plant premises including loading, transportation & unloading and levelling of hard rock materials at designated spot within Plant premises for all applicable leads & lifts; all complete as per instructions of GAIL GAS/EPMC Engineer-in-Charge(EIC). The Contractor shall carry out petrographic test for confirming that it is hard rock and quoted rates are deemed to include this examination at Lab. The rock shall be broken with Tractor/ trailer mounted chisel hammers/rock breakers. Depth of excavation 0 - 1.5 m. Blasting in site will not be permitted. | 220 | M3 | 1,300 | ₹2,86,000 | 0.18% |
| 11 | HARD ROCK EXCAVATION-1.5 TO 3 M:-
Excavation in hard Rock as encountered in Footings, Plinth beams, pedestals, culverts, pits, trenches, roads or any structures etc. for depth from 1.5 m to 3 m from existing ground level in both dry and wet conditions including pumping and bailing out surface and subsoil water, slush removal,shoring & strutting if required all complete as per technical specifications and instructions of GAIL GAS/EPMC Engineer-in-Charge. Quoted rates are deemed to include stacking the excavated rock for enabling GAIL GAS/EPMC to take stack measurements & including shoring & strutting if any required. The stack measurement will be deducted by 50% for voids. After stack measurement is taken, the stack is to be disposed off at a suitable spot inside Plant premises including loading, transportation & unloading and levelling of hard rock materials at designated spot within Plant premises for all applicable leads & lifts; all complete as per instructions of GAIL GAS/EPMC Engineer-in-Charge(EIC). The Contractor shall carry out petrographic test for confirming that it is hard rock and quoted rates are deemed to include this examination at Lab. The rock shall be broken with Tractor/ trailer mounted chisel hammers/rock breakers. Depth of excavation 1.5-3 m. Blasting in site will not be permitted. | 70 | M3 | 1,690 | ₹1,18,300 | 0.18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TechTender_Part4.pdf
Tender Documents • 2.52 MB
TechTender_Part3.pdf
Tender Documents • 20.17 MB
techtenderpart2.pdf
Tender Documents • 19.86 MB
Tendervol1.pdf
Tender Documents • 4.69 MB
TechTender_Part1.pdf
Tender Documents • 19.67 MB
BOQ_292177.xls
BOQ • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .