Tender Value
₹7.6 L
EMD Value
₹15,131
Closing Date
31 Aug 2026, 2:00 pm6d left
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DIRECTORATE, AFTAB CLUB COMPOUND, BURDWAN 713101
Patch Repairing work of Sankarpur Nibhujibazar Road from 2.00 - 6.00 km under Burdwan Highway Sub Division- I of Burdwan South Highway Division in the district of Purba Bardhaman during the financial year 2026-2027.
2026_WBPWD_5018720_3
WBPWD/RD/EE/BSHD/NIT-07/26-27
Open Tender
CIVIL WORKS
Percentage
10 days
BURDWAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,131
Yes
AFTAB CLUB COMPOUND, BURDWAN 713101
14 Aug 2026
14 Aug 2026
2 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing Pot-holes with Bituminous Macadam
(Grading - II, for compacted thickness of upto
75mm)
Filling Pot Holes with Bituminous Macadam using Mobile Hot Mix plant (6-10 TPH) with approved crushed aggregates of specified grading premixed with bituminous binder @3.4% by wt. of the total mix, transported to site and laid in the pot hole prepared before hand by cutting
the edges to get a firm vertical face and by
removing all the failed and loose materials
including dust and applying tack coat evenly on
the sides and on the surface as per
specification, rolling the filled depression with 8-10 tonne smooth wheeled roller to
achieve the desired compaction, including the
cost and carriage of stone aggregates and
bitumen, hire charges of machinery and
equipment, cost of fuel and lubricants and
wages of all operational staff, quality control
except the cost of tack coat complete as per
direction of Engineer-in-charge. Payment to be
made on the basis of the loose net volume of
the stone aggregates used in the work. | 6.25 | m3 | 11,484.53 | ₹71,778.31 |
| 2 | Filling Pot-holes and Patch Repairs
with open-Graded Premix
surfacing, 20mm.
Removal of all failed material,in the
pavement courses and if necessary
below the pavement,until the root
causes of the failure is removed, the
trimming of completed excavation
to provide firm vertical faces;
specified for the pavement layer;
application of tack coat conforming
to cl. 503 of MORT&H's specification
,on to the sides and base of
excavation prior to placing hot
bituminous material as per clause
510 and the compaction,trimming
and finishing of the surfaces of all
patches to form a smooth
continuous surface, level with the
surrounding road as per the
requirement of clause 3004.2 of
MORT&H's specification . | 1,100 | m2 | 278.3 | ₹3,06,130 |
| 3 | Providing and laying seal coat
sealing the voids in a bituminous
surface laid to the specified levels,
grade and cross fall using. Type A
and B seal coats (Reference to
MORT&H's specification clause 511)
Case - II : Type B
Providing and laying of premix sand
seal coat with HMP using approved
crushed stone chipping and
viscosity grade paving bitumen of
suitable approved grade. | 1,100 | m2 | 92.1 | ₹1,01,310 |
| 4 | Concrete Block Pavement
Supplying and Laying in the particular pattern of cement concrete block pavements with BIS certification and spacer nib of size and
shape with aspect ratio as per IS 15658 with cement concrete grade not less than M40 on the prepared base course of specified CBR as
mentioned in design and drawing with a cushion of bedding sand of 30 to 50 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC
SP-63) and filling up the gaps between two paver block with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2) complete as per IRC SP - 63 with proper confinement of bedding and joint filling sand, ompaction,levelling and filling up of the edge gaps with mortar. Type I, II,III, IV should be
as per design requeirment or instruction of E-I-C.
c) Type - III (80 mm thickness) inter locking system | 110 | m2 | 1,444.96 | ₹1,58,945.6 |
| 5 | Tack Coat
Providing and applying tack coat
with Cationic bitumen emulsion
(RS1) complying with IS:8887 using
emulsion pressure distributor on
the prepared bituminous/granular
/cement concrete pavement
surface cleaned with mechanical
broom and high pressure air jet
(Reference to MORT&H's
specification clause 503).
i)On bituminous surface @ 0.25kg /sqm.
Using Cationic RS-I | 109.65 | m2 | 27.32 | ₹2,995.64 |
| 6 | GST-18% (sgst=9% & cgst=9%)ADD | 1 | each | - | - |
| 7 | WEST BENGAL LABOUR WELFARE CESS=0% ADD | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 1.46 MB
Tendernotice_4.pdf
PDF • 1.05 MB
BOQ_5089968.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].