Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | ₹2.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | KEKA ARMATURE REPAIRING SHOP L1 | NEW ELECTRICAL CONCERN L2 |
|---|---|---|---|---|---|
| 1.00complete repairing of 200 amps 550/440 abc male abc FLP/ACB | |||||
| 2.00 | Cost of fixed contacts. | 3 | Nos | 800 ₹2,400 | 925 ₹2,775 |
| 3.00 | Cost of fixed moving contacts. | 3 | Nos | 800 ₹2,400 | 925 ₹2,775 |
| 4.00 | Cost of arc-chute. | 3 | Nos | 1,200 ₹3,600 | 1,500 ₹4,500 |
| 5.00 | Cost of overload assembly. | 1 | LS | 7,000 ₹7,000 | 7,500 ₹7,500 |
| 6.00 | Cost of no-volt coil with planger. | 1 | LS | 6,000 ₹6,000 | 6,800 ₹6,800 |
| 7.00 | Cost of new isolator. | 1 | LS | 13,400 ₹13,400 | 13,900 ₹13,900 |
| 8.00 | Cost of earth/leakage relay. | 1 | LS | 8,000 ₹8,000 | 8,500 ₹8,500 |
| 9.00 | Cost of terminal with bushes | 12 | Nos | 750 ₹9,000 | 825 ₹9,900 |
| 10.00 | Cost of connection cable. (7/16″) | 7 | mtr | 1,000 ₹7,000 | 1,190 ₹8,330 |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
23 Mar 2026, 4:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete repairing of 200Amps, 550 440V ABC make ACB Sl.no. FLP ACB 5206 and 150HP Kilburn make 550V DOL starter Sl no NKB 0021 of Kumardihi B Colliery under Bankola Area.
2026_ECL_356466_1
ECL/GM/BA/E TENDER/25-26/ENM/397 Dt 12.03.2026
Open Tender
Electrical and Maintenance Works
15 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹3,800
28 Mar 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
12 Mar 2026 - 16 Mar 2026
complete repairing of 200 amps 550/440 abc male abc FLP/ACB
Cost of fixed contacts.
Cost of fixed moving contacts.
Cost of arc-chute.
Cost of overload assembly.
Cost of no-volt coil with planger.
Cost of new isolator.
Cost of earth/leakage relay.
Cost of terminal with bushes
Cost of connection cable. (7/16″)
Cost of copper socket.
Cost of flexible jumper.
Cost of C.B.T.
Cost of ampere meter.
Cost of C.T.
Cost of hardware materials.
Cost of Testing & painting.
Cost of wiring wire for double quoted coppe
Repairing charge.
complete repairing of 150 hp kilburn make 550 DOL startter
Contractor unit (L&T make) ML 12
Replacement of thermal overload. 300/5
Replacement of C.B.C.T.
Replacement of earth/leakage (miliampere).
Replacement of isolator.
Replacement of basbar copper.
Replacement of ampere meter.
Replacement of C.T.
Replacement of copper socket 95 sq mm.
Replacement of connection leads. (95 sqmm)
Replacement of terminal with bushes.
Connection wiring wire for double quoted.
Replacement of element switch.
Replacement of push switch.
Replacement of lamp with holder.
Replacement of fuse with carries.
Hardware materials such as nuts, bolts & washer.
Testing & painting.
Repairing charge.
Transporting charge.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 1.22 MB
Tendernotice_3.pdf
PDF • 0.20 MB
BOQ_369316.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid