Executice EngineerProvincial Division No 1 Karnal
Executice Engineer Provincial Division No 1 Karnal
DNIT forRestoration of damages carried out for providing sewerge Network and all ancillary works including construction of pumping station STP Sewerage Treatment Plant on SBR technolocy alongwith O M for 5 Years in Karnal Town under AMRUT Program
2021_HRY_187846_1
DNIT forRestoration of damages carried out for pro
Open Tender
Civil Works
Works
60 days
DNIT forRestoration of damages carried out for pro
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
₹4,000
Yes
27 Sept 2021
13 Sept 2021
23 Sept 2021
13 Sept 2021
22 Sept 2021
13 Sept 2021
Amount
Providing & laying 100 mm Granular Sub-Base with Coarse Graded Material - Grading-I filter layer (Table:- 400-2) by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying WBM (G-II) 53 mm to 22.4 mm with screening of Type ‘A’ in layer of 75mm each, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) WBM Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer
Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG - 10 laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications (HSR 17.32)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor @ 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR.17.26.2)
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of crushed stone aggregates of specified grading premixed in a continuous type of hot mix plant of appropriate capacity not less not less than 75 tonne per hour, with bituminous binder VG - 10 @ 1.46 kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complete as per technical clause 510 of MORT&H specifications. (Based on HSR 17.33.1) Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note:-Before laying PC on existing black top all cracks shall be sealed as MoRT&H specification (5th edition) clause No. 3004.3. which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2 and 3004.3.3 of MoRT&H specification (5th edition) 2013 respectively. Proper measurement and consumption shall be entered in MB for fog seal/or crack filling/ or patch work but no payment on this account shall be made as fog seal/or crack filling/ or patch work is/are incidental to work.
Providing and laying of premix sand seal coat premixed in continuous type HMP of appropriate capacity not less than 75 tonnes/ hours using specified fine aggregates and penetration grade bitumen @0.68 kg/sqm laid to specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications. (Based on HSR 17.36.3) Note:- In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR. the unit and nomenclature given in HSR Shall be applicable. ii) In case of any difference in the unit of any Non- schedule items depicted in this DNIT and the Conventional unit of that N.S Item as per practice in this department the conventional unit as per practice shall be applicable.
Bani Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .