| 1 | L1₹19.0 LAccepted-AOC | ₹19.0 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹19.5 L+₹47,545 (2.50%)Rejected-AOC | ₹19.5 L+₹47,545 (2.50%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
| 3 | L3₹21.1 L+₹2.1 L (11.3%)Rejected-AOC | ₹21.1 L+₹2.1 L (11.3%) | L3 | Rejected-AOC Quoted high rate as compared to L1 |
| 4 | L4₹2.4 L−₹16.6 L (87.5%)Rejected-AOC HOUSING COLONY LEH | LEH LADAKH | LADAKH | 194101 | ₹2.4 L−₹16.6 L (87.5%) | L4 | Rejected-AOC Quoted high rate as compared to L1 |
| 5 | L4₹22.0 L+₹3.1 L (16.2%)Rejected-AOC | ₹22.0 L+₹3.1 L (16.2%) | L4 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹23.7 L
Closing Date
1 Dec 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of 10MT ration store at Sumdha Chun
2022_RDD_8555_7
NIT 60 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
10 Apr 2023
25 Nov 2022
3 Dec 2022
25 Nov 2022
1 Dec 2022
25 Nov 2022
Amount
Earth work in bulk excavation by mechanical means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains,pipes and cables etc. (not exceeding 1.5mtr in width or1 Osqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed,within a lead of 50 mtr.All kinds of soil
Providing and laying of stone soling hand packed in horizontal level
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with Hard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 course sand 4 graded stone aggregate 20mm nominal size.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and Reinforcemen t1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement of R.c.c work in plinth band incl. straightening, cutting, bending, placing in position and binding all complete.TMT Bars
Centring and shuttering including strutting propping etc and removal of form work for footing bases of coloumn mass concret etc
Centring and shuttering including strutting propping etc and removal of form work for.-Columns, piers, abutments, pillars, posts and struts.
Centring and shuttering including strutting propping etc and removal of form work for.-Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and shuttering including strutting propping etc and removal of form work for.Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttering including strutting propping etc and removal of form work for Edges of slabs and breaks in floors and walls.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second kail wood
Providing and fixing of 12mm TMT bar for window grill for windows all complete job
15mm Cement plaster on the rough side of single or half brick wall of mix: ( 1 cement : 4 coarse sand)
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.
Suppying and fixing rolling shutters of approved make, made of required size M.S. laths interlocked together through their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete including the cost of providing and fixing necessary 27.5 em long wire springs manufacture from high tensile steel wire of adequate strength confirming to IS 4454 part1 andm M.S. top cover of required thickness for rolling shutters. 80x1.20 mm M.S. laths with 1.20 mm thick top cover
providing and fixing of Ball bearing for rolling shutters
Carraige of Sand and aggregate from an avg 30 Km by Mechanical Transport
carriage of cement and steel avg lead 70 km by MT
Carriage of stone avg lead 5 km by MT
contractor
M/S ABDUL HAKIM
M/S TSERING DORJEY
M/S TUNDUP YANGJOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .