Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2,291.52Admitted-Finance | -36.36% | ₹2,291.52 | L1 | Admitted-Finance |
| 2 | L2₹2,448.88Admitted-Finance | -31.99% | ₹2,448.88 | L2 | Admitted-Finance |
| 3 | L3₹2,520.53Admitted-Finance | -30.00% | ₹2,520.53 | L3 | Admitted-Finance |
| 4 | L4₹2,989.35Admitted-Finance | -16.98% | ₹2,989.35 | L4 | Admitted-Finance |
| 5 | L5₹3,061.01Admitted-Finance | -14.99% | ₹3,061.01 | L5 | Admitted-Finance |
Tender Value
₹24.9 L
EMD Value
₹49,800
Closing Date
16 Apr 2026, 6:55 pmClosed
E.O., Nagar Palika, Bhinder
Bhinder, Palika Campus, Udaipur (Raj.)
construction of wmm roads in nagar palika areas bhinder (E_01_26-27_Bhinder / 27)
2026_DLB_550581_1
E_01_2026-27_2880_Bhinder_27
Open Tender
Civil Works
124 days
Bhinder
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.O., Nagar Palika, Bhinder
₹49,800
Yes
9 May 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per oRT&H specification clause 301. In all type of soil | - | P.Cum | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | P.Cum | - | - |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth Rate for lead 5 km | - | P.cum. | - | - |
| 4 | Providing, laying, spreading and compacting of granular sub-base by providing close graded material (Table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | - | P.Cum | - | - |
| 5 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | P.Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_981310.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid