| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹22.0 L+₹2.1 L (10.3%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹22.5 L+₹2.6 L (12.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹24.0 L+₹4.0 L (20.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹34.4 L
EMD Value
₹68,860
Closing Date
22 Jul 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
Concertina wire and chain link fencing along the boundary wall in Jammu and Kashmir Academy of Art Culture and Language
2026_PWDJK_315289_1
eNIT 34 of 2026-27 Dated 09-07-2026
Open Tender
Civil Works
Percentage
90 days
Jammu
BOQ
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹68,860
Yes
28 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 56.25 | Cum | 479.3 | ₹26,960.63 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 56.25 | cum | 256.85 | ₹14,447.81 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size | 22.5 | Cum | 5,202.9 | ₹1,17,065.25 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 48.3 | Cum | 5,733.6 | ₹2,76,932.88 |
| 5 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade | 732 | Sqm | 852.05 | ₹6,23,700.6 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required 14:22In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. | 8,299.2 | Kg | 181.6 | ₹15,07,134.72 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 28.06 | Cum | 7,571.55 | ₹2,12,457.69 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 28.06 | Cum | 1,455.65 | ₹40,845.54 |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 981.15 | Kg | 120.8 | ₹1,18,522.92 |
| 10 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length ( total length 90m), having 50nos rounds per 6 meter length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T.reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron,all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478gm/ meter (cost of M.S. angle, C.C. blocks shall be paid separately) | 380 | meter | 305.8 | ₹1,16,204 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1022319.xls
BOQ • 0.29 MB
Extension_12.pdf
PDF • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .