Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.0 LAccepted-AOC | ₹7.0 L | L-1 | Accepted-AOC 1 |
| 2 | L-2₹7.3 LRejected-Finance | ₹7.3 L | L-2 | Rejected-Finance 2 |
Tender Value
₹7.0 L
EMD Value
₹14,080
Closing Date
23 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rohru
R R Damage to various road under Rohru Section under rohru Sub Division SH Hiring of JCB for removal of slips and maintenance of road surface and clearance of drain etc
2026_PWD_134537_2
1780-85 Dated 17-4-2026
Open Tender
Civil Works - Roads
120 days
rhu
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹14,080
16 Jun 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
23 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Hiring of JCB (Excactor cum loader)front end loader 0.50cum/ hour including POL charges shifting charge and other ancillay equipments as required at site of work for removal of slips in all hegiths and all kinds of soils such as kankar moorum shingle boulders decomposed or soft variety of soil such a spade work pick work jumer work soft rock hard rock including their intermediate classification of soil including mechnacial transportion of necessary .The disposal of this undervecable materials has to be done in the acquired width of the road to avoid the damage to the properties of the people or in case any damage took place the contractor shall be liable for its .All salvaged materils such as qurried stone shall belong to the department and manikumum useful quantity of stones from removal of slips shall be to be neatly stacked along road side on road berms minium 18.00 cubice metre of earth work shall be done by the machine in one hours ans 200 cum of snow shell be removed from the road surface in one hour other wise number of hours shall be reduced accordingly.The work shall have to be carried out as per ministry of transport and as per instruction of the Engineer in charge including all leads and lifts. | - | Per Hour | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
SBD2.pdf
Tender Documents • 2.49 MB
BOQ_199107.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid