| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | L1 | Accepted-Finance Lowest Amount | |
| 2 | L2₹8.3 L+₹751.46 (0.09%)Rejected-Finance | L2 | Rejected-Finance Highest Amount | |
| 3 | L3₹8.3 L+₹843.30 (0.10%)Rejected-Finance | L3 | Rejected-Finance Highest Amount |
Tender Value
₹8.3 L
EMD Value
₹17,000
Closing Date
3 Oct 2026, 11:00 amClosed
eo
np sumerpur
ward 13 laibrery me baelens work book self farnichar wai fhai toilel nirman kary
2026_DOLBU_1188727_1
577 date 17.09.2026/01
Open Tender
Civil Works
Percentage
np sumerpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
eo
₹17,000
Yes
5 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. | 11.9 | cum | 120 | ₹1,428 |
| 2 | Coarse sand filling in plinth including supply of necessary quantity of coarse sand/moorum from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (as per S.I. No. 255) | 1.15 | cum | 1,000 | ₹1,150 |
| 3 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12:6:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (as per S.I. No. 273) | 1.55 | cum | 3,700 | ₹5,735 |
| 4 | RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. | 2 | cum | 6,300 | ₹12,600 |
| 5 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (as per S.I. No. 303) | 5.95 | cum | 5,300 | ₹31,535 |
| 6 | (a) As in item (309) above butt walls of half brick 112 mm (41/2") thick add for extra labour to the rate of item (309) | 2.1 | cum | 5,790 | ₹12,159 |
| 7 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504) | 2.35 | Qtl. | 5,600 | ₹13,160 |
| 8 | 12mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584) | 62.45 | sqm | 130 | ₹8,118.5 |
| 9 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work. | 6 | sqm | 80 | ₹480 |
| 10 | Supply & fixing galvanzad mosquitos proof heavy quality iron wire gauge or expended metal heavy quality over windows & including supply of C.P. Teak wood battens 8cm. x 1cm. (3"x3/8") and including supply and fixing of necessary screws, all materials, labour and tools and plants etc. required for proper completion of the work. | 5.21 | sqm | 620 | ₹3,230.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_2239432.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .