| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 CrAdmitted-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | ₹12.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.9 CrAdmitted-Finance | ₹12.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | LNA Infraprojects Pvt. Limited L1 | Netri Buildcon India Pvt. Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Storm Water Pumping Station including construction of inlet unit and other necessary complete civil works as per site requirenment including all piping connection to the pumping main including supplying, fixing, installation, testing and commissioning of
(a) Required capacity of non-clog submersible pumps
(b) Supply, fabrication and fixing of stainless steel (SS-316) Coarse Bar screen (mechanically raked and manual both) with flat bar 50mm X 10mm Spacing of bars 50mm total 2 nos.
(c) CI Thimble Mounted Sluice Gate, Manually operated, Rising Spindle type. Sluice gates are as per IS 13349
(d) Electrically Operated Travelling Crane (EOT)
(e) MCC Panel for pumps
(f) Electrically Operated Travelling Crane (EOT)
(g) DG Set of required capacity according to the pumps
All items/equipments as per peak flow 40.1 MLD to 45 MLD.
Note: Design of Pumping Station for Storm water and waste water discharge shall be provided by the Contractor at his own cost. It shall be vetted by expert from reputed engineering college/MNIT by ADA, Ajmer and cost for the same shall be borne by ADA, Ajmer with complete satisfaction and approval of Engineer In-charge. Already sump is existing which may be repaired by the firm as per site requirement. | 1 | Each | 2,61,00,000 ₹2.6 Cr | 2,75,00,000 ₹2.8 Cr |
| 2.00Operation and Maintenance of Pumping Station | |||||
| 2.10 | O & M cost for 1st Year | 1 | Per year | 9,99,000 ₹10.0 L | 10,50,000 ₹10.5 L |
| 2.20 | O & M cost for 2nd Year ( 5% increment on previous year) | 1 | Per year | 10,48,950 ₹10.5 L | 11,02,500 ₹11.0 L |
| 2.30 | O & M cost for 3rd Year ( 5% increment on previous year) | 1 | Per year | 11,01,398.4 ₹11.0 L | 11,57,625 ₹11.6 L |
| 2.40 | O & M cost for 4th Year ( 5% increment on previous year) | 1 | Per year | 11,56,467.6 ₹11.6 L | 12,15,506.25 ₹12.2 L |
| 2.50 | O & M cost for 5th Year ( 5% increment on previous year) | 1 | Per year | 12,14,290.8 ₹12.1 L | 12,76,281.56 ₹12.8 L |
Tender Value
₹11 Cr
EMD Value
₹22 L
Closing Date
5 Jan 2023, 6:00 pmClosed
EE, ADA, Ajmer
ADA, Ajmer
Pushkar mai pratham charan mai varaah ghat chowck, Brahmchowck hote hue santoshi mata dhani sthit SUMP tak Drain ka kary.
2022_ADA_310180_1
NIT-42/2022-23/2809
Open Tender
Civil Works
180 days
ADA
as per tender document
2 documents required · 2 mandatory
₹5,000
ADA, Ajmer
₹22 L
Yes
DE, ADA, Ajmer
12 Jan 2023
15 Dec 2022
6 Jan 2023
15 Dec 2022
5 Jan 2023
15 Dec 2022
27 Dec 2022
Amount
Construction of Storm Water Pumping Station including construction of inlet unit and other necessary complete civil works as per site requirenment including all piping connection to the pumping main including supplying, fixing, installation, testing and commissioning of (a) Required capacity of non-clog submersible pumps (b) Supply, fabrication and fixing of stainless steel (SS-316) Coarse Bar screen (mechanically raked and manual both) with flat bar 50mm X 10mm Spacing of bars 50mm total 2 nos. (c) CI Thimble Mounted Sluice Gate, Manually operated, Rising Spindle type. Sluice gates are as per IS 13349 (d) Electrically Operated Travelling Crane (EOT) (e) MCC Panel for pumps (f) Electrically Operated Travelling Crane (EOT) (g) DG Set of required capacity according to the pumps All items/equipments as per peak flow 40.1 MLD to 45 MLD. Note: Design of Pumping Station for Storm water and waste water discharge shall be provided by the Contractor at his own cost. It shall be vetted by expert from reputed engineering college/MNIT by ADA, Ajmer and cost for the same shall be borne by ADA, Ajmer with complete satisfaction and approval of Engineer In-charge. Already sump is existing which may be repaired by the firm as per site requirement.
Operation and Maintenance of Pumping Station
O & M cost for 1st Year
O & M cost for 2nd Year ( 5% increment on previous year)
O & M cost for 3rd Year ( 5% increment on previous year)
O & M cost for 4th Year ( 5% increment on previous year)
O & M cost for 5th Year ( 5% increment on previous year)
Bidder Name
Amount
LNA Infraprojects Pvt. Limited(GSTN-08AADCL1585B1ZQ)
Netri Buildcon India Pvt. Ltd(GSTN-NA)
Netri Buildcon India Pvt. Ltd
Netri Buildcon India Pvt. Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
biddoc42_merged_compressed.pdf
Tender Documents • 12.68 MB
BOQ_549838.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid