| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance A 1 BLOCK A ASTHA APRTMENT BHOJUBEER NEAR CIRCUIT HOUSE VARANASI UTTAR PRADESH 221002 UDYAM UP 75 0008931 | VARANASI | UTTAR PRADESH | 221002 | ₹1.2 Cr | L1 | Accepted-Finance Low Rate |
| 2 | L2₹1.2 Cr+₹4.3 L (3.70%)Rejected-Finance | ₹1.2 Cr+₹4.3 L (3.70%) | L2 | Rejected-Finance High Rate |
| 3 | L3₹1.2 Cr+₹4.4 L (3.85%)Rejected-Finance BADHAWAL KHAS BHOJAPUR SAKALDIHA CHANDAULI CHANDAULI UTTAR PRADESH 232108 | CHANDAULI | UTTAR PRADESH | 232108 | ₹1.2 Cr+₹4.4 L (3.85%) | L3 | Rejected-Finance High Rate |
| 4 | L4₹1.4 Cr+₹24.7 L (21.5%)Rejected-Finance | ₹1.4 Cr+₹24.7 L (21.5%) | L4 | Rejected-Finance High Rate |
| 5 | L5₹1.4 Cr+₹25.5 L (22.1%)Rejected-Finance | ₹1.4 Cr+₹25.5 L (22.1%) | L5 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | M/s Aghoreshwar Kripa Construction Co. L2 | SHRI SAI TRANSMISSION CONSTRUCTION L5 | M/S Grid Power Systems L1 | PRATAP ELECTRICAL INDUSTRIES L4 | S. P. ELECTRICAL CO L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of new 33 kv line Kanhar enamated from 132/33 kv s/s Myorpur to 33/11 kv s/s Amwar, Sonbhadra Supply of following Decentralized materials at the works site as per RESSPO norms. | ||||||||
| 1.01 | Bolts, Nuts & Washers (Provided by Contractor) | 1,250 | Kg. | 175 ₹2,18,750 | 200 ₹2,50,000 | 113 ₹1,41,250 Lowest | 115 ₹1,43,750 | 155 ₹1,93,750 |
| 1.02 | F-bracket for 33 KV (Provided by Department) | 700 | No. | 350 ₹2,45,000 | 300 ₹2,10,000 | 252 ₹1,76,400 Lowest | 257 ₹1,79,900 | 280 ₹1,96,000 |
| 1.03 | E Bracket for 33 kv (Provided by Department) | 330 | No. | 80 ₹26,400 Lowest | 230 ₹75,900 | 189 ₹62,370 | 195 ₹64,350 | 230 ₹75,900 |
| 1.04 | Extention Side Bracket channel with supporting angle and clamp with bolts & nuts for 33 kv (Provided by Department) | 30 | No. | 2,600 ₹78,000 | 3,150 ₹94,500 | 1,890 ₹56,700 Lowest | 1,928 ₹57,840 | 3,150 ₹94,500 |
| 1.05 | PG clamp (Provided by Department) | 1,080 | No. | 35 ₹37,800 Lowest | 105 ₹1,13,400 | 113 ₹1,22,040 | 115 ₹1,24,200 | 105 ₹1,13,400 |
| 1.06 | GI Pipe 6 inch dia (Provided by Department) | 120 | Mtr. | 1,950 ₹2,34,000 | 1,650 ₹1,98,000 | 1,450 ₹1,74,000 Lowest | 1,638 ₹1,96,560 | 1,650 ₹1,98,000 |
| 1.07 | HDPE Pipe (Provided by Department) | 3,600 | Mtr. | 550 ₹19,80,000 | 610 ₹21,96,000 | 420 ₹15,12,000 Lowest | 475 ₹17,10,000 | 510 ₹18,36,000 |
| 1.08 | Cross arm holding clamp with bolts & nuts (Provided by Department) | 700 | No. | 450 ₹3,15,000 | 300 ₹2,10,000 | 126 ₹88,200 Lowest | 129 ₹90,300 | 300 ₹2,10,000 |
| 1.09 | Stay clamp (Provided by Department) | 450 | No. | 250 ₹1,12,500 | 200 ₹90,000 | 189 ₹85,050 Lowest | 193 ₹86,850 | 200 ₹90,000 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
10 Sept 2025, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Work Circle, Fatahan, Mirzapur
construction of new 33 kv line Kanhar enamated from 132/33 kv s/s Myorpur to 33/11 kv s/s Amwar, Sonbhadra(Semi-Turnkey)
2025_PVVNV_1068416_1
05/EWC(M)/2025-26
Open Tender
Electrical Works
Lump-sum
180 days
Superintending Engineer Electricity Work Circle
Please Refer Tender Document
2 documents required · 2 mandatory
₹5,900
Superintending Engineer Electricity Work Circle
₹1.4 L
26 Sept 2025
26 Aug 2025
11 Sept 2025
26 Aug 2025
10 Sept 2025
26 Aug 2025
Amount
Construction of new 33 kv line Kanhar enamated from 132/33 kv s/s Myorpur to 33/11 kv s/s Amwar, Sonbhadra Supply of following Decentralized materials at the works site as per RESSPO norms.
Bolts, Nuts & Washers (Provided by Contractor)
F-bracket for 33 KV (Provided by Department)
E Bracket for 33 kv (Provided by Department)
Extention Side Bracket channel with supporting angle and clamp with bolts & nuts for 33 kv (Provided by Department)
PG clamp (Provided by Department)
GI Pipe 6 inch dia (Provided by Department)
HDPE Pipe (Provided by Department)
Cross arm holding clamp with bolts & nuts (Provided by Department)
Stay clamp (Provided by Department)
Top channel clamp and Dropper channel clamp of DP with bolts & nuts (Provided by Department)
Gaurding angle clamp with bolts & nuts (Provided by Department)
3x300 sq mm cable clamp with bolts & nuts (Provided by Department)
Bracing Angle Clamp (Provided by Department)
33 KV Cable J/Kit (3x300 Sq mm) (Provided by Department)
33 KV S/T (3x300 Sq mm) (Provided by Department)
Control cable 2x2.5 mm2 (Provided by Department)
Control cable 4x2.5 mm2 (Provided by Department)
Danger Board with clamp (Provided by Department)
Terminal Gantry (Provided by Department)
Structure for Post insulator (Provided by Department)
Structure for Lightening arrestor (Provided by Department)
Structure for Bus Isolator (Provided by Department)
Structure for CT (Provided by Department)
Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge.
ST Pole 11.0 m long- SP-55 (Provided by Department)
ST Pole 13.0 m long -SP 70 (Provided by Department)
Pcc pole 9 mtr long (Provided by Department)
33kV V-Type Steel Cross Arm (Provided by Department)
MS angle iron 65x65x6mm, 4300 mm long bracing (Provided by Department)
MS angle iron 65x65x6mm, 3.2 Mtr long (5.8kg per mtr) for guarding angle for DP (Provided by Department)
Top channel 125x65mm 3200 mm (10.70 kg/m) (Provided by Department)
Polymeric Disc insulator 70 KN (B&S type) (Provided by Department)
Disc fitting 70KN (Provided by Department)
ACSR Dog conductor (Provided by Department)
Polymeric 33 kv Pin insulater (Provided by Department)
Extra cost of Stay at right angle (with Stay wire and stay insulator) (Provided by Department)
Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. (Provided by Department)
Cable Al 3x300 Sq mm XLPE 33 KV(Provided by Department)
Dropper channel for DP (Provided by Department)
GI Wire 6 SWG and 10 SWG (Provided by Department)
33 Kv Post insulator (Provided by Department)
33 Kv Lightening arrestor (Provided by Department)
33 KV Bus Isolator (Provided by Department)
33 KV VCB with double T/F control Pannel CTR 200/100/1A with CT structure (i) 33 KV VCB (ii) 33 KV double T/F control panel (iii) CT 200/100/1-A (3no.) (Provided by Department)
ERECTION OF WORK
ST Pole 11.0 m long- SP-55
ST Pole 13.0 m long -SP 70
Pcc pole 9 mtr long
33kV V-Type Steel Cross Arm
MS angle iron 65x65x6mm, 4300 mm long bracing
MS angle iron 65x65x6mm, 3.2 Mtr long (5.8kg per mtr) for guarding angle for DP
Top channel 125x65mm 3200 mm (10.70 kg/m)
Polymeric Disc insulator 70 KN (B&S type)
Disc fitting 70KN
ACSR Dog conductor
Polymeric 33 kv Pin insulater
Extra cost of Stay at right angle (with Stay wire and stay insulator)
Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc.
Dropper channel for DP
GI Wire 6 SWG and 10 SWG
33 Kv Post insulator
33 Kv Lightening arrestor
33 KV Bus Isolator
33 KV VCB with double T/F control Pannel CTR 200/100/1A with CT structure (i) 33 KV VCB (ii) 33 KV double T/F control panel (iii) CT 200/100/1-A (3no.)
Bolts, Nuts & Washers
F-bracket for 33 KV
E Bracket for 33 kv
Extention Side Bracket channel with supporting angle and clamp with bolts & nuts for 33 kv
PG clamp
Cross arm holding clamp with bolts & nuts
Stay clamp
Top channel clamp and Dropper channel clamp of DP with bolts & nuts
Gaurding angle clamp with bolts & nuts
3x300 sq mm cable clamp with bolts & nuts
Bracing Angle Clamp
33 KV S/T (3x300 Sq mm)
Control cable 2x2.5 mm2
Control cable 4x2.5 mm2
Danger Board with clamp
Terminal Gantry
Structure for Post insulator
Structure for Lightening arrestor
Structure for Bus Isolator
Structure for CT
Concreting of supports (0.268 cu.m/Pole)
Concreting of stay
Cable Laying charge through pipe
Fitting of Cable route marker with cost material
Making of cable J/K & hanging it on pole including loop & G.I. pipe and earthing with chemical pipe
Drilling/ballasting for erection of stay
Drilling/ballasting for erection of pole
Crossing of state highway & other HDD machine & laying of cable through pipe in very hard rock area (double length)
Tree branch cutting
Earthing of all proposed structure and pannel with 01 no. boring earthing till water
Painting of all new structure
Earthing of L.A. with boring
Re-arrange the one side fencing wall with materials
M/s Aghoreshwar Kripa Construction Co. (BID ID -5524804)
S. P. ELECTRICAL CO (BID ID -5525330)
PRATAP ELECTRICAL INDUSTRIES (BID ID -5525272)
SHRI SAI TRANSMISSION CONSTRUCTION (BID ID -5525151)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .