Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 L+₹591.43 (0.10%)Rejected-Finance | ₹5.9 L+₹591.43 (0.10%) | L2 | Rejected-Finance HIGH RATE |
Tender Value
₹7.0 L
EMD Value
₹14,000
Closing Date
13 Apr 2026, 12:00 pmClosed
EE RED BALRAMPUR
EE RED BALRAMPUR
Construction work of canteen in Vikas Bhawan complex
2026_REDUP_1124322_2
895/NOTICE/2025-26 DATE 07-02-2026
Open Tender
Civil Works
Percentage
90 days
EE RED BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹680
Yes
₹14,000
Yes
20 Jun 2026
25 Mar 2026
13 Apr 2026
25 Mar 2026
13 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting of rank vegetations, grass,bush,wood trees and saplings of girth up to 30 cm. measured at a height of 1.00 M. above ground level and removal of rubbish up to a distance of 50.00M.Out side the peripheri of area cleared as per E/I & dsr2.31 | |||||
| 2Earthwork in Excavation in foundation in Ordinary Soil including Lift up to 1.50 M. and Lead up to 30.00m. Including all Complete as per dsr2.1.1 | |||||
| 3Concrete with 40 mm gauge B/Ballast,Fine sand of 1.25 FM.and Cement in proportion of 12:6:1 in Foundation and under Floor I/C Supply of all material labour and T&P etc.all complete as per S.I.No.273. | |||||
| 4Class M-150 Brick work in 1:6 Cement and Coarse sand of 1.25FM.morter in foundation and plinth I/C all complete as per dsr 6.1.1 | |||||
| 5R.C.C.Work in 1:2:4 cement coarse sand &20 MM stone grit in sill band, lintel band,sun shade I/C all Complete as per dsr 5.3 | |||||
| 6Earth work in filling or in Embankment in Ordinary soil I/C 1.00Km. Extra cartage from site as per S.I. No.253 | |||||
| 7Fabrication & supply of angle iron or T-Iron door / window chaukhat frame,record racks etc.I/C cost of steel all carriage,welding,cutting,labour,smooth finishing staple plate 6 mm thick welded in back plain of hinges I/C all Complete as per si no502 (1) (40x40x6 or 35x35x5 ) dsr 10.1 | |||||
| 8Class M-150 Brick work in 1:4 Cement and coarse sand of 1.25FM.morter in superstructure I/C all complete as per dsr 6.4.1 | |||||
| 9Class M-150 Brick work in 1:4 Cement and coarse sand of 1.25FM.morter in superstructure I/C all complete as per dsr 6.4.1 | |||||
| 10R.C.C.Work in 1:1.5:3 cement coarse sand & 20 MM stone grit in Lighter Beam I/C all Complete as per dsr 5.30 | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_2095185.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .