| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC PLOT NO 515 JAGANNATH BHAWAN PROFESSORPARA B K ROAD A D MARKET CUTTACK 753 012 ODISHA | CUTTACK | CUTTACK | ODISHA | 753012 | ₹9.2 L | L1 | Accepted-AOC Work order on L1 basis to M/s B.K. Giri amounting Rs.919340.00 excluding GST amount |
| 2 | L2₹9.7 LRejected-Finance | ₹9.7 L | L2 | Rejected-Finance Vendor is L2 hence financially rejected |
| 3 | L3₹10.2 LRejected-Finance 2RA 135 PRESS COLONY KHARVEL NAGAR UNIT III BHUBANESWAR 751001 | BHUBANESWAR | KHORDHA | ODISHA | 751001 | ₹10.2 L | L3 | Rejected-Finance Vendor is L3 hence financially rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically disqualified |
| Sl No | Description | Qty | Unit | M/s. B.K. GIRI L1 | M/s. PRACHI ELECTRICALS L3 | M/S. MEERA ELECTRICALS L2 |
|---|---|---|---|---|---|---|
| 1.00M.V. PVCA/XLPA CABLES: Supply, installation testing & commissioning of 1.1KV grade PVC/XLPE insulated, inner sheath tapped, outer sheath PVC extruded, GI strip/armored, multi stranded/ Aluminum conductor power cable as per IS 1554 specifications, FRLS grade anti-rodent and anti-termite PVC (ST-2) outer sheathed cable, in ground at a depth of 900mm below ground level, sand bedding, laying of baked bricks on side and top, temporary reinstatement, back filling, dewatering, consolidation, disposal of excess earth within the radius of 500m and making good to the original finish etc. or fixed on wall/column/slab/in existing GI Cable trays/hume pipes/ trenches by 5mm thick GI spacer fixed/coach screws/anchor fasteners in brick/stone wall /column/slab with 2mm thick GI saddle, all fixing accessories etc. complete including painting of saddle /flat/angle iron etc. The space between two supports shall be generally 600mm Etc. all as per the instructions of Engineer-in-charge-IOP. The tinned copper earth wires to be laid along with the cables should be painted with two coats of black bituminous compound for earth wire in ground & Jointing of the earth wire shall be solder joints with tinned copper cable sockets & GI nuts & bolts. Note: Scope includes all types of masonry work required making good to its original finish of holes through wall, slopes etc. after laying of the cable. Make of cables: Finolex/Polycab/CCI or approved equivalent of the same. | ||||||
| 1.01 | 01 no x 3 ½ core x 185 Sqmm Al. PVCA/XLPE cable and 01 nos. of 8 SWG tinned copper earth wire. (From Block-B main panel room to UPS Incoming Panel)
Holes in tiles provided on the walls is to be made of suitable size to draw the cables inside the Lab using the cutting machine and without damaging the tiles and aesthetic look of the room should be protected. | 40 | Mtr | 1,435 ₹57,400 | 1,393 ₹55,720 | 1,300 ₹52,000 |
| 1.02 | 01 no x 4 core x 25 Sqmm Al. PVCA/XLPE cable and 01 nos. of 8 SWG tinned copper earth wire. (From 120KVA UPS output DB to Furnace Room (03 run-45+45+45) +XRD Lab-35+ Chemical lab-55 + PL Lab30+ Tool room-10)
Holes in tiles provided on the walls is to be made of suitable size to draw the cables inside the Lab using the cutting machine and without damaging the tiles and aesthetic look of the room should be protected. | 265 | Mtr. | 512 ₹1.4 L | 499 ₹1.3 L | 500 ₹1.3 L |
| 2.00DISTRIBUTION BOARDS: Supply, Installation, testing & commissioning of following medium voltage (415V) TP&N/ SP & N distribution boards single door complete with necessary SFU, MCCB, MCBs, etc. suitable for wall mounting with M.S. frame work of 40x40x5mm angle mounting with M.S. enclosure fabricated out of 16SWG thick M.S. CRCA sheet with concealed hinged door, cam type locking arrangement, dust and vermin proof with IP-42 protection, Front operated front access, all live parts shall be shrouded, all bus bars shall be insulated with heat shrinkable sleeves, SMC/DMC shrouds and Bus bar supports shall be used etc. Suitable tinned copper bus bars have to be provided for all phases, neutral and earth connections both for incoming and outgoing connections. Cable end box, wire way box, including interconnections with appropriate size of PVC insulated copper conductor, phase barriers, earth of DB, enameled danger board, name plate, neoprene gasket for joints & door has to be provided. Necessary metal treatment, two coats of red oxide paint & Powder coated with color shade of RAL 7032. A suitable Bakelite sheet with necessary cutouts for knobs/ operating levers of MCB’s/ MCCB/ SFU etc is to be provided duly fixed on to the cabinet with nuts and bolts/ screws. The front door (MS sheet) should have the name of the DB in anodized aluminum plate. Phase distribution drawing etc. all as per drawings specifications etc. relevant IS & instruction of Engineer-in-charge (G.A. & fabrication drawing to be got approved before fabrication) Note: 1.MCB’s shall be minimum 10KA breaking capacity 2. All tinned copper bus bars should be minimum of 200A rating or more than that as mentioned in the drawing. 3. All SFU units should have to be provided with HRC fuses 4. Make of SFU: L & T, Siemens, or approved equivalent of the same & make of MCB: Legrand or approved equivalent of the same. 5. All feeders including the Incoming are to be provided with proper nomenclature in anodized Aluminium plates near the MCB, output terminals & on DB as per requirement/ as per instruction of EIC. 6. All terminals inside the DB has to be provided with suitable copper lugs/sockets for connection. 7. For the feeders above 125A rating output connection is to be made directly from the Bus bars and the output bus bars has to be extended suitably to the cable bay box for connection of the output cables. 8. Suitable Copper Tinned Bus-bar has to be provided for the running earth in each DB. 9. The DBs are to be fabricated in electrical panel fabrication shop approved by Institute of Physics. The DBs will be inspected by our EIC in 3 stages and for which it has to be informed accordingly. | ||||||
| 2.01 | Main Incoming DB (Located in UPS room).
a) 250A TPN SFU for In-comer -01no.
b) 200A TPN SFU for outgoing (120KVA UPS) -01no
c) 100A TPN SFU for outgoing (Spare) – 01 no.
d) 32A TPN MCB for outgoing (4TR cassette AC units) – 03 nos.
e) 63A TPN MCB for outgoing (Spare) – 01 no.
f) 32A DP MCB for (Tool room Sockets) – 01 no.
a) 32A DP MCB for (Spare) – 01 no.
b) 0-500V Voltmeter with 3 way & off selector Switch and HRC Fuse carrier with fuse – 01 set
c) RYB LED type indicating lamps with HRC fuse protection – 01 set | 1 | Set. | 79,500 ₹79,500 | 1,17,685 ₹1.2 L | 1,30,000 ₹1.3 L |
| 2.02 | 120KVA UPS Output DB (Located in front of UPS Room):
a) 200A TPN SFU with 160A Fuse for In-comer -01no.
b) 125A TPN SFU for output (SPS).
c) 125A TPN SFU with 100A Fuse for output (Furnace Room).
d) 63A TPN SFU (Furnace Room +XRD Lab+ Chemical lab + PL Lab) – 04 nos.
e) 32A TPN SFU (Tool room) – 01 nos.
f) 32A DP MCB (SPS Room-02 + Tool Room-02) – 04 nos.
g) 16A DP MCB (Scholar Room) – 01 no.
h) 32A DP MCB for (spare) – 01 no. | 1 | Set. | 92,200 ₹92,200 | 1,29,685 ₹1.3 L | 90,000 ₹90,000 |
| 2.03 | Furnace Room UPS DB (Located in Furnace Room)
a) 125A TPN SFU with 100A fuse for In-comer -01no.
b) 63A DP MCB (10KW Furnace) – 01 no.
c) 25A DP MCB (04KW Furnace) – 03 nos.
a) 20A DP MCB (03x15A Socket) – 01no.
b) 16A DP MCB (02KW Furnace) -01 no.
c) 32A DP MCB (Spare) – 01 no. | 1 | Set. | 26,650 ₹26,650 | 53,851 ₹53,851 | 35,000 ₹35,000 |
| 2.04 | Incoming TPN SFU (Located in Block-B main panel room)
The panel will be wall mounting type and will contain the following items:
1. 250A TPN SFU with Fuse – 01 nos.
Note:
There should be sufficient length of Copper Bus Bar and end termination space for connection of the following cables:
Incomer-1 - 1x 185Sqmm XLPE, Armored, 3 ½ Core cables (From Block-B main Panel room i.e. Normal supply)
Outgoing–1 - 1x 185Sqmm XLPE, Armored, 3 ½ Core cables (To Normal DB SPS Lab) | 1 | Set. | 25,600 ₹25,600 | 31,951 ₹31,951 | 37,000 ₹37,000 |
| 3.00END TERMINATION OF ARMOURED CABLES: End termination and connection of the following cables by crimping with supply of all jointing materials like tinned copper cable sockets, cable glands, gland earthing insulation tape, flux, duplicate interconnection between gland earthing strip and the nearest earthing bus terminals as per the drawing, specifications, Aluminum cable tag is to be provided with each end termination and all as per the instruction of the Engineer in charge. Make of lugs/sockets: Dowels/Jainson | ||||||
| 3.01 | 3 ½ core x 185 Sqmm Al. PVCA /XLPE cable | 4 | Nos. | 820 ₹3,280 | 799 ₹3,196 | 800 ₹3,200 |
Tender Value
₹11.2 L
EMD Value
₹56,188
Closing Date
30 Oct 2025, 6:00 pmClosed
REGISTRAR
Institute of Physics,PO-Sainik School,Bhubaneswar
Electrical Works of SPS and XPS Lab in Block-B at IOP
2025_IOPB_880686_1
NIT/IOP/116/2025-26
Open Tender
Electrical Works
60 days
Institute of Physics, PO-Sainik School, Bhubaneswar
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹56,188
Yes
17 Mar 2026
9 Oct 2025
31 Oct 2025
9 Oct 2025
30 Oct 2025
9 Oct 2025
9 Oct 2025 - 24 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_925680.xls
BOQ • 0.31 MB
Technicalspecification.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid