Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 LAccepted-AOC SECOND FLOOR 134B PART 3 SECTOR 5 GURURAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 1 | Accepted-AOC LOA Issued | |
| 2 | 2₹7.1 L+₹51,000 (7.69%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹7.6 L+₹96,033 (14.5%)Rejected-Finance PLOT NUMBER 629 PLOT NO 629 TEMPLE STREET SECTOR 39 NEAR CYBER PARK GURUGRAM 122001 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | Manoj Kumar Pahuja L2 | Maxworth Infratech L1 | Liberal Protech Engineering & Facilities Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 2.00NS Item | ||||||
| 3.00 | Cleaning of Rain Water Harvesting bore pit and pre-pit including de-silting, removal of sludge, muck and other unwanted material and its proper disposal. Washing of all filtration media and Cleaning and development of existing bore up to 10 inch dia pipe by Bokkey method, including development with air compressor, complete in all respects as per site requirement and directions of Engineer-in-Charge. | 51 | Each | 14,000 ₹7,14,000 | 13,000 ₹6,63,000 Lowest | 14,883 ₹7,59,033 |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
29 Apr 2026, 1:00 pmClosed
Tushar Yadav
Municipal Corporation Gurugram
Cleaning of Rain Water Harvesting Structures under Ward 9,10,16 and 17 under Zone 1 Municipal Corporation Gurugram. Recall
2026_HRY_516769_1
20260FA48F92 9043 48C0 A25C 57BD2127E3E8285ULB
Open Tender
Civil Works
Works
100 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹18,000
Yes
12 May 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | NS Item | - | - | - | - |
| 3 | Cleaning of Rain Water Harvesting bore pit and pre-pit including de-silting, removal of sludge, muck and other unwanted material and its proper disposal. Washing of all filtration media and Cleaning and development of existing bore up to 10 inch dia pipe by Bokkey method, including development with air compressor, complete in all respects as per site requirement and directions of Engineer-in-Charge. | - | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_595635.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .