Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | GEDEMA BASUMATARY L2 | SUN WARY L1 |
|---|---|---|---|---|---|
| 1.00 | (i)Bengtol to Serfanguri (Ch. 0.00m to Ch. 1400.00m) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) By Manual means.
(A) In area of non-thorny jungle. | 0.81 | Hect. | 52,995.08 ₹42,926.01 | 52,995.08 ₹42,926.01 |
| 2.00 | Maintenance of Earthen shoulder (filling with fresh selected soil)
Making up loss of material / irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000m as per technical specification clause 1903 | 3,037.5 | Sqm | 85 ₹2.6 L | 83.28 ₹2.5 L |
| 3.00 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres as per Technical Specification Clause 305.4.3) | 5,062.5 | Sqm | 9 ₹45,562.50 | 7.35 ₹37,209.38 |
| 4.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
A) By Mix in Place Method
ii) For Grading II Material. | 151.88 | Cum | 2,453 ₹3.7 L | 2,442.7 ₹3.7 L |
| 5.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarseaggregate, watering and compacting to the required density Grading 2 as per TechnicalSpecification Clause 405.
(A) By Manual Means
W.B.M.-II | 75.94 | Cum | 4,618.68 ₹3.5 L | 4,618.68 ₹3.5 L |
| 6.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarseaggregate, watering and compacting to the required density Grading 3 as per TechnicalSpecification Clause 405.
(A) By Manual Means
W.B.M.-III | 391.08 | Cum | 4,668.4 ₹18.3 L | 4,668.4 ₹18.3 L |
| 7.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per Technical Specification Clause 502 | 5,214.38 | Sqm | 55 ₹2.9 L | 48.93 ₹2.6 L |
| 8.00 | Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25-0.30kg/sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | 5,214.38 | Sqm | 15 ₹78,215.70 | 13.33 ₹69,507.69 |
| 9.00 | Semi-Dense Bituminous Concrete: Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler........'With hydrated lime/cement as filler (refer table 500-9 of MoSRT&H specification ) for grading-II (10mm nominal size) | 156.43 | Cum | 11,665.91 ₹18.2 L | 11,665.91 ₹18.2 L |
| 10.00 | Providing and fixing retro reflectorised cautionery, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75mmx 75mmx 8mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concreyte 450mmx450mmx600mm below ground level as per drawings and technical specification Clause 801.
600mm equilateral triangle | 10 | Each | 3,933.15 ₹39,331.50 | 3,933.15 ₹39,331.50 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
14 Aug 2025, 2:00 pmClosed
O/O CE, PWRD,Chandmari,Guwahati-03
O/O CE, PWRD,Chandmari,Guwahati-03
BTR_SOPD_G_25_26_23 (1) Improvement of Road from Bengtol to Serfanguri (22 to Serfanguri Pt-I and II under PMGSY Package No. AS-25-78) (2) Re-construction of Goibari Basugaon connecting road under SOPD-G for the year 2025-26.
2025_PWD_46196_27
CE/DEV/TB/122/2025-26/06 Dated. 04-08-2025
Open Tender
Civil Works – Roads
270 days
Sidli-Chirang
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,960
₹3.0 L
Yes
O/O CE, PWRD,Chandmari,Guwahati-03
11 Feb 2026
7 Aug 2025
14 Aug 2025
7 Aug 2025
14 Aug 2025
7 Aug 2025
7 Aug 2025 - 11 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid