| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹15.0 L (8.08%)Admitted-Finance | ₹2.0 Cr+₹15.0 L (8.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ULTRAPOWER BUILDERS L1 | THULUKKANAM L2 |
|---|---|---|---|---|---|
| 1.00 | Fabrication and supply of MS Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions. | 8.6 | MT | 1,30,000 ₹11,18,000 Lowest | 1,45,000 ₹12,47,000 |
| 2.00 | Fabrication and supply of HT Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions. | 25.7 | MT | 1,36,000 ₹34,95,200 Lowest | 1,50,000 ₹38,55,000 |
| 3.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 1.7 | MT | 1,80,000 ₹3,06,000 Lowest | 1,90,000 ₹3,23,000 |
| 4.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Zebra Conductor) | 12 | Set | 3,000 ₹36,000 Lowest | 3,200 ₹38,400 |
| 5.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Single suspension fittings for Zebra Conductor | 9 | Set | 2,300 ₹20,700 Lowest | 2,500 ₹22,500 |
| 6.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Vibration dampers for Zebra Conductor | 12 | Set | 1,450 ₹17,400 Lowest | 1,500 ₹18,000 |
| 7.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Mid span joint for Zebra | 1 | Set | 625 ₹625 Lowest | 625 ₹625 Lowest |
| 8.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Repair sleve for Zebra | 1 | Set | 467 ₹467 Lowest | 467 ₹467 Lowest |
| 9.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. PA Rod for Zebra conductor | 9 | Set | 1,200 ₹10,800 Lowest | 1,200 ₹10,800 Lowest |
| 10.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Panther Conductor) | 24 | Set | 2,500 ₹60,000 Lowest | 2,550 ₹61,200 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
30 Jan 2023, 2:30 pmClosed
CE/TP -I/CHN
A10 TVK INDL. Estate., Guindy
Conversion of existing 110 KCO 3 DC tower of Nokia Pillaipakkam DC line into NMD 3
2023_EB_283147_1
TP1-0125/2022-23
Open Tender
Civil Works - Others
Works
120 days
Pillaipakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.5 L
16 Feb 2023
21 Jan 2023
31 Jan 2023
21 Jan 2023
30 Jan 2023
21 Jan 2023
Amount
Fabrication and supply of MS Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions.
Fabrication and supply of HT Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions.
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Zebra Conductor)
Supply of hard ware’s for conductor as per IS conforming to latest issue. Single suspension fittings for Zebra Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Vibration dampers for Zebra Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Mid span joint for Zebra
Supply of hard ware’s for conductor as per IS conforming to latest issue. Repair sleve for Zebra
Supply of hard ware’s for conductor as per IS conforming to latest issue. PA Rod for Zebra conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Panther Conductor)
Supply of hard ware’s for conductor as per IS conforming to latest issue. Single suspension fittings for Panther Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Vibration dampers for Panther Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Mid span joint for Panther
Supply of hard ware’s for conductor as per IS conforming to latest issue. Repair sleve for Panther
Supply of hard ware’s for conductor as per IS conforming to latest issue. PA Rod for Panther conductor
Labour charges for clearing of juliflora jungle for facilitating survey including cost of all labour, lead, lift etc., complete
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Leveling the site and removing scrub jungles and earth by engaging JCB with lead and lift whereever necessary as directed by Engineer, etc., Complete
Providing & laying of RCC Hume pipe 1.20 M Dia to transport men and material of tower parts in canal area placing in correct position including cost of all materials, labour, lead, lift etc complete as directed by the dept. engineer at site.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete.
Setting of piling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete.
Supplying, fabrication of 6mm MS sheet for making into circular casing shape to there required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour, lead, lift charges, etc., complete. For 500mm dia
Installation of vertical cast-in -situ borded RCC piles of 500 mm dia of suitable depth of 15m from basement floor level, using RCC M30 design mix and 20mm HBS, mixed with Conplast SP337 @300ml per bag of cement, providing temporary casing pipe of minimum length of 1m at top using drilling mud (Bentonite Slurry) of suitable of bore holes for the remaining length, concreting the pile through tremie pipes with minimum cement content of not less than 400KG /Cum of concrete incuiding the cost of all materials, labours lead, lift, T&P etc complete, but excluding the cost of reinforcement.
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
Assembling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. (NMD Tower)
Earth work excavation in hard stiff clay, stiff black cotton hard red eareth, shales, murram, grvel stoney earth, earth mixed witrh small size boulders and hard gravelly soil including bailing or pumping charges if necessary etc. complete.
Shoring and shuttering using C.W. planks and C.W. scantlings including cost of all materials labour lead lift etc. complete as directed by the engineer at site.
Supplying and filling with M - sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
Plain cement concrete 1:3:6, 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
R:C:C 1:1:5:3 using 12 to 20mm metal with form work including cost of all materials, curing,labour, lead, etc., complete.
Chipping and dismantling of weak pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete.
Back filling of pits with excavated earth including watering and consolidation in 150 mm thick and spread balance earth around the location lead and lift etc., complete
Supllying and fixing of earthing including labour charges for earthing of towers to the required length and connecting to the tower leg and earth pipe with 2 nos bolts, nuts washer etc., complete
Labour charges for erection of towers including sorting out of towers parts tightaning punching of bolds and nuts and rectification of defects if any during erection cost of all meterials labours lead lift etc., complete. (Under LC condition)
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Labour charges for Transporting through head load and hoisting of 14 units 120 KN Ordinary Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for Transporting through head load and hoisting of 13 units 90 KN Ordinary suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for Transporting through head load and hoisting of 8 units 120 KN Ordinary Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for Transporting through head load and hoisting of 7units 90 KN Ordinary suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for paying out of 3 Nos Zebra conductor with fittings including sorting out of conductor according to drum shedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete (Continuous span in KM)
Labour charges for rough sagging tensioning clipping of 3 nos Zeebra conductor with fitting including cost of T& P lead and lift etc., complete (Single span cut point) (Under LC condition)
Labour charges for paying out of 6 Nos Panther conductor with fittings including sorting out of conductor according to drum shedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete (Single span in KM)
Labour charges for rough sagging tensioning clipping of 6 nos Panther conductor with fitting including cost of T& P lead and lift etc., complete (Single span cut point) (Under LC condition)
Labour charges for paying out and stringing of 1no.GI earth wire with fittings cost of T&P lead and lift etc., complete (Continuous span)
Labour charges for rough sagging transioning clipping of 1no.GI earth wire with necessary fittings including cost of T&P lead and lift etc., complete (Single Span out point) (Under LC condition)
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Arranging and attending shutdowns work on HT/LT, EHT lines, dismantling and restringing of HT/LT/EHT lines after completion of line stringing work including charges for T&Ps, transport all labour leads and lifts etc, complete ( one set means all the conductor and earth wire in the corresponding one no HT/LT/EHT line)
Painting tower legs using best qulity anticorroessive black paint two coats 1m above coping including cost of all materials labour lead lift complete in all respects.
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Number plate)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Danger Board)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Phase plate ( Set of three)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Name Board)
Providing plastering C:M 1 : 5 including cost of all materials labour lead, lift, etc., complete in all respect
Labour charges for Dismantling of towers under LC condition. The dismantled towers to be devoluted to stores in good and reusable condition including cost of all labour, lead, lift, etc., complete.
Labour charges for releasing the existing conductor by rough sagging, clipping of 6 nos Panther conductor with fitting including cost of T& P lead and lift etc., complete and devoluting to stores
Labour charges for releasing the existing Earthwire by rough sagging, clipping with fitting including cost of T& P lead and lift etc., complete and devoluting to stores
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete under LC/Normal condtion for 7 unit 90 KN Disc Insulators and devoluting to stores
Dismantling the insulator string including cost of labour for releasing, Tools and Plants transporting charges from site etc complete under LC/Normal condtion for 8 unit 120 KN Disc Insulators and devoluting to stores
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
THULUKKANAM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .