Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | ₹8.7 L | L1 | Admitted-Finance |
| 2 | L2₹9.2 L+₹50,500 (5.79%)Admitted-Finance 211 KRALPORA BUDGAM JAMMU KASHMIR 191113 UDYAM JK 04 0011111 | BUDGAM | JAMMU AND KASHMIR | 191113 | ₹9.2 L+₹50,500 (5.79%) | L2 | Admitted-Finance |
| 3 | L3₹9.5 L+₹77,403 (8.87%)Admitted-Finance CHANDPORA HABBAKADAL HABBA KADAL SRINAGR CHANDPORA HABBAKADAL HABBA KADAL SRINAGR SRINAGAR JAMMU AND KASHMIR 190001 | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹9.5 L+₹77,403 (8.87%) | L3 | Admitted-Finance |
| 4 | L4₹9.8 L+₹1.1 L (12.6%)Admitted-Finance | ₹9.8 L+₹1.1 L (12.6%) | L4 | Admitted-Finance |
| 5 | L5₹10.3 L+₹1.6 L (18.3%)Admitted-Finance | ₹10.3 L+₹1.6 L (18.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R R ELECTRICAL SERVICES L9 | M/S FALCON ENGINEERING L6 | Tech Infra Pvt Ltd L7 | I.T ELECTRIC SUPPLIER L3 | M/S WANI ELECTRA & SUPPLIERS L2 | M/S AQUIB TRADERS ELECTRICAL and MECHANICAL ENGINEERING WORKS L8 | m/s paul engineering constructions L4 | M/S K PLUS ELECTRICAL SOLUTIONS L1 | M/S SOFI SONS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply, Installation, testing and Commissioning of 400Amp MCCB at output of 200KVA Sub Station with MS Box and Stand | 1 | No | 28,000 ₹28,000 | 50,000 ₹50,000 | 80,000 ₹80,000 | 20,415 ₹20,415 Lowest | 30,000 ₹30,000 | 29,000 ₹29,000 | 45,000 ₹45,000 | 25,500 ₹25,500 | 40,000 ₹40,000 |
| 1.02 | Supply, Installation, testing and Commissioning of 120 mm² 3.5 Core armoured/ XLPE (with earthing strips) 1.1kV grade LT cable (polycab/Gloster/Havells or equivalent) | 450 | Mtr | 4,95,000 ₹4,95,000 | 6,03,000 ₹6,03,000 | 6,45,750 ₹6,45,750 | 4,12,650 ₹4,12,650 | 2,25,000 ₹2,25,000 Lowest | 3,82,500 ₹3,82,500 | 4,13,550 ₹4,13,550 | 4,95,000 ₹4,95,000 | 3,82,500 ₹3,82,500 |
| 1.03 | Supply, Installation, testing and Commissioning of 90 mm² 3.5 Core armoured/ XLPE (with earthing strips) 1.1kV grade LT cable (polycab/Gloster/Havells or equivalent) | 200 | Mtr | 1,80,000 ₹1,80,000 | 1,80,000 ₹1,80,000 | 1,80,000 ₹1,80,000 | 40,000 ₹40,000 Lowest | 70,000 ₹70,000 | 1,34,000 ₹1,34,000 | 1,47,600 ₹1,47,600 | 60,000 ₹60,000 | 1,48,600 ₹1,48,600 |
| 1.04 | Supply, Installation, testing and Commissioning of LT Prodigy Meter complete with all related accessories as per design | 2 | No | 38,000 ₹38,000 | 80,000 ₹80,000 | 80,000 ₹80,000 | 28,000 ₹28,000 | 60,000 ₹60,000 | 50,800 ₹50,800 | 26,000 ₹26,000 Lowest | 26,000 ₹26,000 Lowest | 33,000 ₹33,000 |
| 1.05 | Boring by HDD Drilling 4inch Dia | 425 | RM | 2,33,750 ₹2,33,750 | 1,27,500 ₹1,27,500 | 53,125 ₹53,125 Lowest | 2,72,000 ₹2,72,000 | 3,82,500 ₹3,82,500 | 2,76,250 ₹2,76,250 | 2,12,500 ₹2,12,500 | 1,91,250 ₹1,91,250 | 1,61,500 ₹1,61,500 |
| 1.06 | HDPE Pipe Outer Dia 160 mm Inner Dia 148 mm for laying of XLPE Cable | 650 | RM | 1,95,000 ₹1,95,000 | 32,500 ₹32,500 Lowest | 45,500 ₹45,500 | 1,68,350 ₹1,68,350 | 1,48,200 ₹1,48,200 | 2,53,500 ₹2,53,500 | 1,23,500 ₹1,23,500 | 58,500 ₹58,500 | 2,47,000 ₹2,47,000 |
| 1.07 | Providing and fixing of Galvanized Nuts & Bolts of size | 5 | Kg | 675 ₹675 | 1,500 ₹1,500 | 700 ₹700 | 560 ₹560 | 400 ₹400 | 550 ₹550 | 500 ₹500 | 550 ₹550 | 250 ₹250 Lowest |
| 1.08 | Providing and fixing of Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3mm | 2 | No | 4,000 ₹4,000 | 5,000 ₹5,000 | 1,500 ₹1,500 | 3,468 ₹3,468 | 1,000 ₹1,000 | 11,200 ₹11,200 | 300 ₹300 Lowest | 1,400 ₹1,400 | 1,600 ₹1,600 |
| 1.09 | Supply, Installation, testing and Commissioning of End Kit for 120 mmsq 3.5 core cable | 6 | No | 9,000 ₹9,000 | 600 ₹600 Lowest | 3,000 ₹3,000 | 4,560 ₹4,560 | 6,000 ₹6,000 | 6,600 ₹6,600 | 13,800 ₹13,800 | 14,400 ₹14,400 | 18,000 ₹18,000 |
Tender Value
₹12.1 L
EMD Value
₹26,000
Closing Date
30 Jun 2026, 4:00 pmClosed
Executive Engineer EDI
Office of Executive Engineer EDI
Providing of Permanent electrical connection for the load of 80KW for Pump and pavilion Building and Indoor Stadium Cum office of synthetic Hockey Field Polo Ground Srinagar
2026_PDD_311986_1
E-NIT No 013/EDI
Open Tender
Electrical Works
Lump-sum
20 days
Office of Executive Engineer EDI
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
Executive Engineer EDI
₹26,000
Yes
15 Jul 2026
9 Jun 2026
1 Jul 2026
9 Jun 2026
30 Jun 2026
9 Jun 2026
9 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply, Installation, testing and Commissioning of 400Amp MCCB at output of 200KVA Sub Station with MS Box and Stand | 1 | No | - | - |
| 1.02 | Supply, Installation, testing and Commissioning of 120 mm² 3.5 Core armoured/ XLPE (with earthing strips) 1.1kV grade LT cable (polycab/Gloster/Havells or equivalent) | 450 | Mtr | - | - |
| 1.03 | Supply, Installation, testing and Commissioning of 90 mm² 3.5 Core armoured/ XLPE (with earthing strips) 1.1kV grade LT cable (polycab/Gloster/Havells or equivalent) | 200 | Mtr | - | - |
| 1.04 | Supply, Installation, testing and Commissioning of LT Prodigy Meter complete with all related accessories as per design | 2 | No | - | - |
| 1.05 | Boring by HDD Drilling 4inch Dia | 425 | RM | - | - |
| 1.06 | HDPE Pipe Outer Dia 160 mm Inner Dia 148 mm for laying of XLPE Cable | 650 | RM | - | - |
| 1.07 | Providing and fixing of Galvanized Nuts & Bolts of size | 5 | Kg | - | - |
| 1.08 | Providing and fixing of Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3mm | 2 | No | - | - |
| 1.09 | Supply, Installation, testing and Commissioning of End Kit for 120 mmsq 3.5 core cable | 6 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SBD013.pdf
Other Document • 0.71 MB
BOQ_1009927.xls
BOQ • 0.27 MB
Corrig13.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .