Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 00 KHATA NO 514 4357 PLOT NO 169 3484 KESHARA BHUBANESWAR KHURDA KHORDHA ODISHA 751007 | KHORDHA | ODISHA | 751007 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
19 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (Project)
GE (Project) Bangalore
PROVN A BLDG FOR ADVANCED DATA PROCESSING CENTRE ADP WITH ALLIED INFRASTRURE AT ASC C AND C BANGALORE SPL WK LIST V SER NO 01 ARTRAC WKS AMWP 2022 23
2023_MES_612167_1
3011/06/E3
Open Tender
Job Works
Works
30 days
Bangalore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
23 Aug 2023
4 Aug 2023
23 Aug 2023
5 Aug 2023
19 Aug 2023
7 Aug 2023
1 Consultancy Services for carrying out soil investigation collection of sample form Boreholes at different location and depth and testing of samples as per IS provisions and recommending the value of SBC in Tonne/ sqm etc complete. 2 Boring 150mm dia 01 bore holes with trial pit through all kinds of soil upto a depth of 10.00 mtrs for building work below ground level or up to strain value reaches not less than 50 Collecting samples and conducting necessary field tests as per the following parameters- (a) Depth of bore holes may be taken minimum 10.0m or N value reaches >50, whichever is earier in hard rock maximum depth exploration 3.0m. The reduced level (RL) of location of BH may also be included in soil report. (b) SPT value at every 0.75m intervals or change of strata. (c) Grain size distribution and analysis. (d) Soil Characteristics. (e) Value of cohesion and angle of internal friction. (f) Recommended SBC at different depths of foundation i.e. 1500mm, 2000mm & 2500mm. (g) SBC and its calculation based on “N” value, shear strength and settlement criteria should be worked out for following size of footing 1.5 x 1.5, 1.5 x 2.5, 2.0 x 2.5 & 2.0 x 3.0m. (h) Depth of water table (maximum and minimum) (j) Depth of expansive soil and its properties, if any. (k) Recommendation for type of foundation I ncl special structure such as auditorium for the given dimension as per BPs, AE’s and Arch Drgs. (l) Recommendation as regards possibility for liquefaction of soil in case of saturated or partially saturated loose/uncompacted sandy soil. (m) Recommendation for filling under floors and filling under protection including plinth protection. (n) Chemical analysis of soil (o) Details of soil profile and bore logs. (p) K Value of soil 0.5m to 5.0m depth required in case of swimming pool / UG water retaining structure, Raft foundation if any. (q) Plate load test for ascertain of SBC at the proposed level of foundation specifically for OHT only. (r) Modulus of sub-grade reaction for Raft/Mat Foundation (s) Soil investigation and the report shall be as per NBC, IS 1892, 2131, 1858, 2720, 1904,6403,8009,1495,4968 and SP 36 in general (t) Colour photographs of A4 size photo paper of the site with the location of the boreholes duly flagged should be submitted. The photographs should also preferably include any reference structure and the identification of the same be marked. (u) A CD containing video evidence of the depth of each bore hole and machinery deployed at site location. (v) Any other recommendation. 3. Provision of Trial pit of size 1.2m x 1.2m for a depth of 3m including collection of sample for each strata in the excavated pit and conducting the soil investigation as per relevant IS code and submission of results as directed. 4. Changes for mobilization and demobilization of equipment from office to site & shifting of eqpts from one bore hole location to another bore hole including trial pit above 6.00 mtrs and upto 10.00 mtrs. 5. Mobilization & Demobilization of tools & equipment and staff from office to site and back for conducting survey work at site. 6. Carrying out topographical survey of the area with total station, giving traverse of surveyed area, spot levels at about 3.0m center to center and marking of existing major structure, roads, drains, power lines and trees showing contours at 1m interval complete. Note: Clearing or area including cutting bushes, shrubs and any type of vegetations any type under. Rate shall be included under above quoted rate and no extra cost will be paid for area clearance. 7. Preparation and submission of two sets of survey drawings for the LS following:- (a) Traverse & spot level (b) Contour maps at every 1.0m
SEAGULL GEOTECH AND ENGINEERING SERVICES
Sai Enterprises
stage.html
html • 0.02 MB
finance_685365.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .