| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹5,600
Closing Date
5 Mar 2020, 2:00 pmClosed
SE/SEDC/Salem
SE/SEDC/Salem
Construction of Compound wall at West side for Newly Constructed AEE Shevapet and AE Shevapet
2020_EB_159653_1
SE/SEDC/C73/19-20/13.02.2020
Open Tender
Civil Works
Works
90 days
SE/SEDC/Salem
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,600
Yes
16 Mar 2020
28 Feb 2020
6 Mar 2020
28 Feb 2020
5 Mar 2020
28 Feb 2020
Amount
Clearing the Jungle upto rooting by using JCB etc complete.
Dismantling the existed barbed wire fencing , clearing carefully stacking the useful materials for Reuse , including cost of all materials, labour charges, T&P, lead, lift etc., complete.
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including the cost of all materials, T&P 's, leads, lifts, etc., complete.Hard gravelly soil50%
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including the cost of all materials, T&P 's, leads, lifts, etc., complete.Soft disintegrated rock 20%
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including the cost of all materials, T&P 's, leads, lifts, etc.MR & DMR not requiring blasting 15 %
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including the cost of all materials, T&P 's, leads, lifts, etc.Removing Hard rock by wedging & chiseling 15%.
Supplying and filling the river M.sand for filling in the foundation and basement including cost of M.sand, filling charges as per standard specification (watering & consolidation) with all leads, lifts as per standard specification etc., complete.
Plain cement concrete in CC 1:4:8,for foundation using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plain Cement Concrete 1:3:6 (one cement, two sand and four hard broken stone jelly) using 40mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Random rubble masonry, using rubble stone of HBG in CM 1:5 for footings and basement, including cost of cement, all materials labour curing, all leads and lifts,as per standard specification, etc,complete.(Random rupple stone will be supplied by the Department)
Flush pointing with C.M 1:3, for the exposed faces of R.R. masonry including cost of cement, raking charges, all materials, labour, curing, all leads and lifts as per standard specification, etc., complete.
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Plinth beams including cost of cement, all materials, labour, curing, vibration charges, with shuttering, all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Brick work in C.M. 1:5 using class II chamber burnt bricks for super structure including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete.
Providing RCC 1:11/2:3 mix using 12 to 20 mm HB stone jelly for Compound post including cost of all materials, with form work and curing cost lead and lift etc., complete but exculuding cost of reinforcement etc complete
Supplying and fabrication of steel reinforcement and placing in position tying with binding wire including cost of all materials, labour charges etc., Complete as directed by the Engineer incharge.
Plastering with CM 1:5 -12mmtk including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification..
White washing two coats the innerand Outer walls with approved quality of white cement including cost of all materials, scaffolding, Labour, Leads & , Lifts and as directed by Engineer at site. etc.
SGST For bidders within Tamilnadu
CGST For Bidders within Tamilnadu
IGST For Bidders outside of Tamilnadu
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .