Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance SAMITRA HOUSING SATANA DIST NASHIK MAHARASHTRA | SATANA | NASHIK | MAHARASHTRA | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
13 May 2026, 2:00 pmClosed
Executive Engineer, Public Works Division, Nashik
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel. No.- 0253-2583761-64 2575324
E-Rate Quotation of Non DSR Items for Preparation of Estimate for Providing and Fixing Replica of Panchmukhi Trambakraj at Baje, Tal.Trimbakeshwar, Dist. Nashik in connection with the 2026-27 Kumbh Mela Tal. Dist. Nashik
2026_PWR_1300737_1
e-Quotation Notice No.03 for 2026-27
Open Tender
Metals - Ferrous
Item Rate
30 days
Tal. Trimbakeshwar Dist.Nashik
As Per NIT
3 documents required · 3 mandatory
₹0
Exempted
14 May 2026
7 May 2026
14 May 2026
7 May 2026
13 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fixing and Erecting replica of PANCHMUKHI TRYAMBAKRAJ
installation in 6 to 7 mm BRASS casting a size of 21 feet H x 68 feet circumference
1. METHODS OF ART WORK
a) Clay Model Art Work Of Actual Design As Per Size
b) Dai Making In Pop
c) Model Cast In FRP 6 to 8 mm thickness Material16 feet
2. METHODS OF METAL CASTING (LOST WAX METHOD)
a) West Pop Dai Make Behalf Of Final FRP Model
b) Wax Model Make By POP Dai
c) Burned POP Dai Make By Wax Model
d) Final Brass Metal Peace Cast By Lost Wax Method By Burned POP Dai (6 to 7 mm)
3. Installation Method
a) First Ms Fabricated Structure Installation At Site
b) Pedestal Make In Black Stone Surrounding Metal Art Structure
c) install & fixing proper lighting
d) Frp Model Fixing At Site With Internal Ms Structure
e) Final Brass Model Install on Frp Model Capping Method With Assemble a Different Different Part of Brass Design and Breezed Together of All Small Parts | 1 | Unit | - | - |
| 2 | SUPPLYING & FIXING HIGH RELIEF FRP:
mural on the wall.
A)first Create the Shadow soil model according to the size and drawing.
B)Production should be made from dove craving rubble molds for FRP casting.
C)FRP material 150 gel coat MS lubrication bonding with oven matte colour
D)Work should be done in polyurehane spray colour matte/metallic stone culour for Indoor and outdoor sculpture and mural
E)Work should be done with the lacquer and sun coat spray | 1 | Sqmt | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
Notice03nd.pdf
Tender Documents • 2.39 MB
BOQ_2233588.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .