Loading…
Loading…
Tender ID
Tender Value
₹5.0 Cr
EMD Value
₹9.9 L
Closing Date
9 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER BUILDING DIVISION MUZAFFARPUR
BUILDING DIVISION MUZAFFARPUR COMBINED BUILDING MUZAFFARPUR
CONSTRUCTION OF ONE NO. PANCHAYAT SARKAR BHAWAN AT EACH PANCHAYAT (BHALURA SIMTOKA PANCHAYAT AND RAMPUR SHANBHUTA PANCHAYAT) AT AURAI BLOCK IN MUZAFFARPUR DISTRICT FOR THE YEAR - 2025-26 (ELECTRIFICATION INCLUDED).
128949
RE-SBD NIT-03/MUZAFFARPUR/BCD/2026-27 (GROUP-01)
Open Tender
CIVIL
Bihar
• ALL INFORMATION IS TO BE FILLED IN REMARK FIEDLD.
• (a) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given.16.1 Bid Security Amount in Rupees Total Bid Security Amount in Rupees 9,91,700.00 IFB
• (i) Legal Status of Bidder 4.3(a)
(ii) Place of Registration.
(iii) write Principal place of Business
(iv) Power of attorney of signatory Bid 4.2(iv)
• Total value of civil engineering construction work, in Rupees, Performed in last five years. minimum annual financial turnover (in all classes of civil engineering construction works only) amount of construction work of at least the equal to the 50 % of estimated cost of works for which bid has been invited. The turn over will be indexed at the rate of 8% for a year i.e.
Rs. 2,47,92,184.00
2020 - 2021
2021 - 2022
2022 - 2023
2023 - 2024
2024 - 2025
• Amount in Rupees related to Work Experience of Similar nature Satisfactory completed at least one similar work of value not less than 50% of estimated Cost Rs 2,47,92,184.00 4.5(A) (b)
• Minimum Quantities of work done as prime contractor in any one year during last five years, units shall be same as in Requirement column Items Qty Unit 4.5A( c)
Items Qty Unit
EARTH WORK/SAND FILLING WORK 2798.000 M3
BRICK WORK 389.370 M3
RCC/PCC 616.700 M3
STONE AND TILE FLOORING 1102.910 M2
ELECTRICAL WORK 1415577.000 RUPEES
FIRE FIGHTING WORK 59500.000 RUPEES
PLUBING WORK 548345.000 RUPEES
• Electrical License The contractor or his identified sub-contractor should possess required valid electrical license for executing the building electrification works and should have executed similar electrical works for a minimum amount as indicated in Appendix in any one year 4.5A( d)
• (a) Amount of Existing commitments and ongoing works in Rupees Sec 2-1.4(A)
• (b) Amount of Work for which Bid already submitted, in Rupees Sec 2-1.4(B)
• Numbers and Maximum age of Equipment's with bidder Type of Equipment Maxm. Age Nos. Sec 2-1.5 (Vide Departmental Letter No-8274 (bh) Dated-12-10-2012)
1. Concrete Mixer with Integral weigh Batching facility .
5 1
2. Concrete Batching & Mixing plant Minimum capacity 15m3/hr.
5 0
3. Pump for concreting 5 0
4. Transit Mixture 5 0
5. Vibrator (Plate & Niddle) 5 2
6. Water Tanker 5 1
7. Steel shuttering 5 2000 sft
• Name of the Personnel and Experience in years and Select from drop down list Personnel / Qualification 4.5(B) (b) (Vide Departmental Letter No-8274 (bh) Dated-12-10-2012)
1. Project Manager B.E. Civil + 10 Years Exp. (5 years as
Manager having MBA) or equivalent or retired E.E. 0 No.
2. Site Engineer B.E. (Civil) + 03 Years Exp. (3 years in Building
Construction) or Diploma in Civil + 7 year Exp. In Building
Construction or retired A.E. 1 No
3. Plant Engineer B.E. Mech./ Civil + 03 Years Exp. or Dip.
Mech + 05 Years Exp. or Retired J.E. 0 No.
4. Quantity Surveyor B.E. Civil + 03 Years Exp. or Dip. Civil + 05
Years Exp. 0 No.
5. Site Supervisor Fresh Graduate in Civil or Diploma Civil + 02
Years Exp. or retired I.T.I Holder. 1 Nos
• Evidence of accesses to Financial Resources in Rupees Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (for work under this bid). 4.2(i)
• Proposed methodology and programme of construction Select from drop down list the proposed methodology and programme of construction, backed with equipment planning and deployment 4.3(l)
• Litigation History. Select from drop down list. Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) 4.3(j)
• Affidavit Select from drop down list. Regarding statements made in the required attachments are true and correct. Sec-2, Affidavit
• Undertaking Select from drop down list. Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. Sec-2, Undertaking
• Time of Completion in months 12 Months
• Registration No.
• IT.& GST Registration & clearance Certificate
• Labour License
• Character Certificate
• NOC for Debar (If required)
22 documents required · 22 mandatory
₹10,000
Processing Fee: 5900
₹9.9 L
27-04-2026 03:00 pm AT CHIEF ENGINEER (NORTH) BUILDING CONSTRUCTION DEPARTMENT PATNA.
9 May 2026
10 Apr 2026
11 May 2026
17 Apr 2026
9 May 2026
17 Apr 2026
27 Apr 2026
CONSTRUCTION OF ONE NO. PANCHAYAT SARKAR BHAWAN AT EACH PANCHAYAT (BHALURA SIMTOKA PANCHAYAT AND RAMPUR SHANBHUTA PANCHAYAT) AT AURAI BLOCK IN MUZAFFARPUR DISTRICT FOR THE YEAR - 2025-26 (ELECTRIFICATION INCLUDED).
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NITANDPC03.pdf
NIT • 1.06 MB
BOQ0320262701PDF.pdf
NIT • 0.14 MB
50 PERCENT MATERIALS.pdf
NIT • 0.02 MB
SBD0320262701PDF.pdf
NIT • 3.02 MB
00707_Letter no 7292 E-in- C bcd.pdf
NIT • 0.64 MB
06397_Letter No 3183 Dated 3-6-2020.pdf
NIT • 1.08 MB
16471_FORBANKGUARANTEECIRCULARS.pdf
NIT • 0.75 MB
29236_NEWADDITIONALPERFORMA.pdf
NIT • 2.13 MB
96007_Letter no 7291 E-in-C bcd.pdf
NIT • 0.55 MB
CHECKLISTFORCONTRACTORS.pdf
NIT • 1.76 MB
E-PROC 2.0 ENC LT NO.7534.pdf
NIT • 0.86 MB
LETTER NO-7974 E-in-C bcd.pdf
NIT • 2.18 MB
LETTER-8274.pdf
NIT • 0.27 MB
MEMO NO-4533 BH DATED 22-5-2025.pdf
NIT • 2.20 MB
BOQ0320262701.xlsx
NIT • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .