| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.8 Cr+₹1.8 L (0.48%)Rejected-Finance | ₹3.8 Cr+₹1.8 L (0.48%) | L2 | Rejected-Finance Accepted |
Tender Value
₹3.8 Cr
EMD Value
₹2.0 L
Closing Date
23 Aug 2023, 3:00 pmClosed
DC/EO
Arulmigu Subramaniyaswamy Temple Maruthamalai, Coimbatore
Construction of Devoties Rest Mantapam for Arulmigu Subramaniyaswamy Temple Maruthamalai, Coimbatore District.
2023_HRCE_345754_1
01/2023/A4
Open Tender
Civil Works - Others
Item Rate
930 days
Arulmigu Subramaniyaswamy Temple, Maruthamalai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.0 L
13 Dec 2023
21 Jul 2023
23 Aug 2023
21 Jul 2023
23 Aug 2023
21 Jul 2023
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling M-sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Providing and laying , Standard Concrete Mix - 20 Grade in accordence with IS : 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.55, including admixtrure ( plasticiser / super plasticiser ) in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve stone jelly and with about ( 3.3 cu.m ) 5156 Kg .of 10 - 12 mm machine crushed stone jelly and with about ( 4.79 cu.m. ) 7670 Kg . of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying , vibrating with mechanical vibrators, finishing , curing, etc., and providing fixtures like fan clamps in the RCC floor / roof sabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. THe coarse and fine aggregates to be used should comply with the requirements of IS Stanards. ( No saparate payment will be made by the Department for the excess usage of materials).upto basement.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation.A. Footing & Grade Beam
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation B. Column (Pillar)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation C. Beam
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation D. Roof Slab
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc.A. Cut stone roughly dressed for Kalkaram vari vargams
Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc B. Cut stone roughly dressed for Pillar, Paukkal, Uthiram and Nillaikal
Labour charges for dressing cut stone Chitravanam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Upapeedam Padmajagathi 3 line dressed on all face set in Combination morat 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Upapeeda Kandam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Upapeeda Kabothagam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Inner Vari Upapeedam (2'.9"+1'.6") 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Inner Padmajagathi 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Inner Kandam vari 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Inner Kabothagam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Pillar Chitrakandakal 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete .
Labour charges for dressing cut stone Bothiyal - I 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Bothiyal - II 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Outer Uthiram 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Inner Uthiram 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone High roof uthiram 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone High roof Pillar 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone High roof Bothiyal 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Kodungai Outer 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Kodungai Middle 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Vyalavari Outer 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Vyalavari Middle 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Konavittam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Sathuravittam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Vimanam Kandam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Pandiyal 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Kalasam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Pavukal 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Chitravanam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Handrail Ground Floor Padmajagathi 3 line dressed on all face set in Combination morat 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Handrail Ground Floor Kandam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Handrail Ground Floor Kabothagam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Handrail First Floor Padmajagathi 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete
Labour charges for dressing cut stone Handrail First Floor Kandam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete
Labour charges for dressing cut stone Handrail First Floor Kabothagam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete
Labour charges for dressing cut stone Karnakoodu 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete
Labour charges for dressing cut stone Pillar - I 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete .
Labour charges for dressing cut stone Pillar - II 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Bothiyal L Shape 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Bothiyal 2 Side 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Bothiyal 3 Side 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Middle 2 Side 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Middle 3 Side 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Uthiram - I 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Uthiram - II 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Middle Cross 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Kabothagam 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Vyalavari 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Labour charges for dressing cut stone Pavukal 3 line dressed on all face set in Combination moratr 1: 1 : 4 (One Cement , one of Slaked Lime from Pollachi and Four of M - Sand) including handling charges cost of tools and fixing in position etc., complete.
Weathering course with concrete broken brick jelly of 20mm using Pollachi Lime guage in pure slacked lime.[No sand tobe used] over roof slab,the properties of brick jelly to lime being 32cft : 12.5cft well beaten with wooden beaters giving rquired slope and thickness of 75mm as directed by the departmental officers etc; complete complying with standard specification
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Flooring with Granite Tiles slabs, (Unpolished with Machine cut edges) of size 4'0x2'0 and above 18mm to 20mm thick free from all defects in all floors over a base layer of CM 13:, 20 mm thick. The Granite slab slab shall be laid over the cement mortar by applying white cement slurry in between base mortar and Granite slab.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N.SUBRAMANIAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .