Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹11.4 L+₹1.3 L (12.5%)Accepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L2 | Accepted-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹12,300
Closing Date
25 Jun 2024, 2:00 pmClosed
SEES NCTPS-II
OFFICE OF SEES NCTPS-II
Sp.29 NCTPS II ES circle MRT Division S DnI Switchyard Carrying out time bound works for routine Maintenance of Switchyard Switchyard Peripherals and MRT LAB for a period of 215 days
2024_EB_451898_1
CE NCTPS II MRT SPEC NO 29 24 to25
Open Tender
Electrical and Maintenance Works
Works
215 days
NCTPS-II
AS PER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹0
₹12,300
Yes
1 Jul 2024
15 Jun 2024
26 Jun 2024
15 Jun 2024
25 Jun 2024
15 Jun 2024
Amount
Daily Maintenance Monitoring and observing for any abnormality in switchyard relays, Transducers and Meters, Protection Relay panels of unit I & II in 400kV and 230kV, Bus bar panels of Unit-I & II in 400kV & 230kV and 3.3kV 0CA Switchgear Panels, LTMSB Relays of CWPH & ACW Pump of Unit-I & II, UPS battery in switchyard, PLC Panels of Debris & COLTCS Panels of Unit -I & II as instructed by maintenance engineer in charge
Weekly Maintenance Cleaning of switchyard control panels in 230kV & 400kV, PGCIL panel, Auxiliary panel, Metering panel, Bus bar protection panels (400kV & 230kV), cleaning of 3.3kV OCA Switchgear Panels and UPS battery of Switchyard and Cleaning of motor operated valves in ACW(U-I), CWPH (U-I), Cleaning the PLC Panels of Debris & COLTCS of Unit -I & II. Weekely Maintenance covering of 70 panels which requires 4shift =One operation (i.e. 4 x (1459.305 x 31=1,80,953.696))
Monthly Maintenance Tightness checking of control circuit wiring in the following areas 3.3kV OCA, Motorized Actuators of ACW(U-I), CWPH (U-I), Debris & COLTCS PLC Panels, Field equipment related to all systems are continuously in service & the area is also dust bronze, so it is very essential to do periodic maintenance. Monthly Maintenance covering of 70 panels in 1 Month requires 2 Shifts= 1 Operation. Hence For 7 Months : 7 x 70 Panels = 490 Panels: (Rate / Operation for 1 Panel = (2 x 2395.162) / 70 = 68.43) i.e ( 490 x 68.43) = 33,530.7
Breakdown Maintenance Trouble shooting and replacement of Cards in Actuators & Relays, Panel meters, auxiliary panels for the below mentioned areas as instructed by maintenance engineer in charge. Areas : 230kV & 400kV Switchyard, UPS in switchyard, 3.3kV OCA, Switchgears & Actuators in ACW(U-I), CWPH (U-I), DEBRIS & COLTCS PLC Panels
MRT LAB Charges for handling of vital testing Kit and transport the testing kit with other accessories to various locations of the power plant. Assist in testing & Troubleshooting of Relays, C.T's, P.T's, Transducers, L.T & H.T Motor's, OLR's and Electronic Cards of Epac of Motorized Actuators. In addition to assisting in connection of the special testing equipments like High Voltage Test kit, Tan δ test Kit, Thermal Imaging Camera etc.,
A.R.C.ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .