| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.7 LAccepted-AOC THIS INFORMATION IS NOT AVAILABLE IN THE PROVIDED DOCUMENT | KAMRUP METRO | ASSAM | 781005 | L-1 | Accepted-AOC RATES ARE FOUND REASONABLE AND THE FIRM BEING L1 BIDDER | |
| 2 | L-2₹23.2 L+₹1.1 L (5.08%)Rejected-Finance C O DR UMASHANKAR SHARMA RANGIYA TINIALI NEAR RAIL GATE POST RANGIYA DIST KAMRUP ASSAM PIN 781354 | KAMRUP | ASSAM | 781354 | L-2 | Rejected-Finance BEING L2 BIDDER | |
| 3 | L-3₹23.7 L+₹1.6 L (7.34%)Rejected-Finance | L-3 | Rejected-Finance BEING L3 BIDDER | |
| 4 | L-4₹25.3 L+₹3.2 L (14.5%)Rejected-Finance | L-4 | Rejected-Finance BEING L4 BIDDER | |
| 5 | L-5₹25.4 L+₹3.3 L (14.9%)Rejected-Finance VILL BAREGAON PO CHAK CHAKA BAZAR DIST BARPE | BARPETA | ASSAM | 781301 | L-5 | Rejected-Finance BEING L5 BIDDER |
| Sl No | Description | Qty | Unit | MUKUL CHOUDHURY L8 | M/S SITAL BUILDERS L7 | M/S S.S. Construction L2 | M/s DEBOJIT ROY L5 | SYED ATAUR RAHMAN L3 | M/S Rajkamal Enterprise L1 | NARESH DAS L6 | M/S SUNRISE ENTERPRISE L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 16 | EACH | 20 ₹320 | 39 ₹624 | 15 ₹240 Lowest | 50 ₹800 | 50 ₹800 | 40 ₹640 | 120 ₹1,920 | 50 ₹800 |
| 2.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc 1.5 sqm but not exc. 4.0 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 6 | EACH | 20 ₹120 Lowest | 39 ₹234 | 20 ₹120 Lowest | 50 ₹300 | 50 ₹300 | 50 ₹300 | 150 ₹900 | 50 ₹300 |
| 3.00 | Dismantling timber scantlings 40 sq. cm and over in section, in any position and in unframed work, complete all as specified and as directed by Engineer-in-charge. | 0.9 | CUM | 250 ₹225 | 199 ₹179.1 | 150 ₹135 Lowest | 200 ₹180 | 1,000 ₹900 | 400 ₹360 | 250 ₹225 | 450 ₹405 |
| 4.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, complete all as specified and as directed by Engineer-in-charge. | 10.6 | CUM | 250 ₹2,650 | 149 ₹1,579.4 Lowest | 150 ₹1,590 | 200 ₹2,120 | 200 ₹2,120 | 400 ₹4,240 | 480 ₹5,088 | 200 ₹2,120 |
| 5.00 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and as directed by Engineer-in-charge. | 11.37 | CUM | 300 ₹3,411 | 149 ₹1,694.13 Lowest | 150 ₹1,705.5 | 150 ₹1,705.5 | 200 ₹2,274 | 450 ₹5,116.5 | 480 ₹5,457.6 | 400 ₹4,548 |
| 6.00 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. | 152.16 | SQM | 15 ₹2,282.4 | 4.99 ₹759.28 Lowest | 5 ₹760.8 | 10 ₹1,521.6 | 20 ₹3,043.2 | 10 ₹1,521.6 | 30 ₹4,564.8 | 40 ₹6,086.4 |
| 7.00 | Dismantling Asbestos cement (corrugated, semi-corrugated, etc.) sheets in roof coverings, complete all as specified and as directed by Engineer-in-charge. | 260.51 | SQM | 15 ₹3,907.65 | 19 ₹4,949.69 | 15 ₹3,907.65 | 7 ₹1,823.57 Lowest | 10 ₹2,605.1 | 15 ₹3,907.65 | 15 ₹3,907.65 | 20 ₹5,210.2 |
| 8.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified and as directed by Engineer-in-charge. | 3.25 | QTL | 200 ₹650 | 199 ₹646.75 | 150 ₹487.5 Lowest | 500 ₹1,625 | 300 ₹975 | 200 ₹650 | 300 ₹975 | 200 ₹650 |
| 9.00 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. | 23.32 | CUM | 1,700 ₹39,644 | 1,749 ₹40,786.68 | 1,600 ₹37,312 | 2,200 ₹51,304 | 1,350 ₹31,482 | 1,100 ₹25,652 Lowest | 2,000 ₹46,640 | 1,500 ₹34,980 |
| 10.00 | M&L for earth filling, spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape, etc., n exc. 1.5 m high from base, complete all as per specified and as directed by Engineer-in-charge. NOTE- Approved quality earth shall be brought by the contractor outside MoD land and cost of transportation also included in unit quoted rate. | 73.96 | CUM | 600 ₹44,376 | 799 ₹59,094.04 | 850 ₹62,866 | 1,050 ₹77,658 | 600 ₹44,376 | 600 ₹44,376 | 500 ₹36,980 | 450 ₹33,282 Lowest |
Tender Value
₹29.1 L
EMD Value
₹58,300
Closing Date
3 Aug 2026, 6:00 pmClosed
GE Rangia
GE Rangia C/O 99 APO Rangia
SPL REPAIR TO BLDG NO ET-223 AND ET-231 AT RANGIA MIL STN UNDER GE RANGIA
2026_MES_778286_1
8063/RNG/E8
Open Tender
Civil Works
Item Rate
180 days
RANGIA
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE Rangia
₹58,300
Yes
12 Aug 2026
13 Jul 2026
5 Aug 2026
13 Jul 2026
3 Aug 2026
28 Jul 2026
13 Jul 2026 - 21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 16 | EACH | - | - |
| 2 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc 1.5 sqm but not exc. 4.0 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 6 | EACH | - | - |
| 3 | Dismantling timber scantlings 40 sq. cm and over in section, in any position and in unframed work, complete all as specified and as directed by Engineer-in-charge. | 0.9 | CUM | - | - |
| 4 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, complete all as specified and as directed by Engineer-in-charge. | 10.6 | CUM | - | - |
| 5 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and as directed by Engineer-in-charge. | 11.37 | CUM | - | - |
| 6 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. | 152.16 | SQM | - | - |
| 7 | Dismantling Asbestos cement (corrugated, semi-corrugated, etc.) sheets in roof coverings, complete all as specified and as directed by Engineer-in-charge. | 260.51 | SQM | - | - |
| 8 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified and as directed by Engineer-in-charge. | 3.25 | QTL | - | - |
| 9 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. | 23.32 | CUM | - | - |
| 10 | M&L for earth filling, spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape, etc., n exc. 1.5 m high from base, complete all as per specified and as directed by Engineer-in-charge. NOTE- Approved quality earth shall be brought by the contractor outside MoD land and cost of transportation also included in unit quoted rate. | 73.96 | CUM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
8063TENDERDOCUMENT.pdf
Tender Documents • 0.50 MB
BOQ_871704.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .