| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | -12.59% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹41.5 L (14.1%)Admitted-Finance | -0.25% | ₹3.4 Cr+₹41.5 L (14.1%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 Cr+₹55.7 L (19.0%)Admitted-Finance SHOP NO 2 RANJIT STUDIO FIRST FLOOR G BLOCK DADASAHEB PHALKE ROAD DADAR EAST MUMBAI MUMBAI MAHARASHTRA 400014 | MUMBAI | MAHARASHTRA | 400014 | +4.00% | ₹3.5 Cr+₹55.7 L (19.0%) | L3 | Admitted-Finance |
| 4 | L4₹3.6 Cr+₹67.7 L (23.0%)Admitted-Finance | +7.55% | ₹3.6 Cr+₹67.7 L (23.0%) | L4 | Admitted-Finance |
| 5 | L5₹3.9 Cr+₹93.2 L (31.7%)Admitted-Finance | +15.15% | ₹3.9 Cr+₹93.2 L (31.7%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
21 Feb 2026, 10:30 amClosed
DGM (Contract Cell)
Contract Cell Dept., Admin. Bldg., RCF Thal Factory, Alibag, Raigad - 402208
CONTRACT FOR CONSTRUCTION OF RCC BOUNDARY WALL AT RCF THAL
2026_RCFL_895568_1
TH/CC/87201/26/D24-09(V)/145
Open Tender
Civil Works
Works
548 days
RCF Thal, Alibag
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹3 L
Yes
24 Jul 2026
24 Jan 2026
21 Feb 2026
24 Jan 2026
21 Feb 2026
24 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION FOR FOUNDATION UPTO 1.50 M LIFT INCLUDING REMOVING THE EXCAVATED MATERIALS UPTO A DISTANCE OF 50 METRES BEYOND THE BUILDING AREA AND LIFT AS SPECIFIED, STACKING AND SPREADING, NECESSARY DEWATERING UNLESS PROVIDED ELSEWHERE, PREPARING THE BED FOR THE FOUNDATION AND REQUIRED BACKFILLING, RAMMING, WATERING, SHORING AND STRUTTING ETC. COMPLETE AS DIRECETD IN EARTH, SOILS OF ALL TYPES, SAND, GRAVEL AND SOFT MURUM. | 2,000 | CUM | 207 | ₹4,14,000 |
| 2 | PROVIDING DRY/TRAP/GRANITE/QUARTZITE/GNEISS RUBBLE STONE SOLING 15 CM TO 20 CM THICK INCLUDING HAND PACKING AND COMPACTING COMPLETE AS DIRECTED BY EIC. (USING RCF RUBBLE) | 250 | CUM | 432 | ₹1,08,000 |
| 3 | PROVIDING DRY/TRAP/GRANITE/QUARTZITE/GNEISS RUBBLE STONE SOLING 15 CM TO 20 CM THICK INCLUDING HAND PACKING AND COMPACTING COMPLETE AS DIRECTED BY EIC. | 50 | CUM | 1,382 | ₹69,100 |
| 4 | PROVIDING & LAYING IN SITU CEMENT CONCRETE IN GRADE 1:3:6 OF TRAP METAL FOR COPING AND BEDDING AT MID HEIGHT/PARAPET LEVEL OF STONE/BRICK MASONRY AS DIRECTED BY EIC, INCLUDING FORMWORK, COMPACTING AND CURING ETC.COMPLETE AS DIRECTED BY EIC. | 80 | CUM | 5,830 | ₹4,66,400 |
| 5 | SUPPLY OF JCB WITH SHOVEL HAVING GRABBING/DOZING FACILITY AS PER REQUIREMENT INCLUDING OPERATOR, CLEANER, COST OF FUEL, OIL ETC. COMPLETE ON SHIFT BASIS (MINIMUM PAYMENT PAYABLE IS HALF SHIFT. A SHIFT CONSISTS OF 8 HRS. THE ACTUAL START OF WORK IS CONSIDERED AS ZERO TIME. LUNCH & BREAKDOWN SHAIL BE DEDUCTED FROM SHIFT TIMINGS) BREAKDOWN SHALL BE DEDUCTED FROM SHIFT TIMINGS) COMPLETE AS DIRECTED BY EIC | 80 | SHIFT | 5,511 | ₹4,40,880 |
| 6 | SUPPLY OF DUMPER/S INCLUDING DRIVER, CLEANER, COST OF FUEL, OIL ETC. COMPLETE ON SHIFT BASIS (MINIMUM PAYMENT PAYABLE IS HALF SHIFT. A SHIFT CONSISTS OF 8 HRS. THE ACTUAL START OF WORK IS CONSIDERED AS ZERO TIME. LUNCH & BREAKDOWN SHALL BE DEDUCTED FROM SHIFT TIMINGS) | 80 | SHIFT | 3,689 | ₹2,95,120 |
| 7 | PROVIDING AND LAYING IN SITU CEMENT CONCRETE M-25 OF TRAP / GRANITE / QUARTZITE / GNEISS METAL FOR RCC WORK IN FOUNDATIONS LIKE RAFT, STRIP FOUNDATIONS, GRILLAGE AND FOOTINGS OF RCC COLUMNS AND STEEL STANCHIONS ETC. INCLUDING BAILING OUT WATER, FORMWORK, COVER, BLOCKS COMPACTION AND CURING ROUGHENING THE SURFACE IF SPECIAL FINISH IS TO BE PROVIDED (EXCLDUING REINFORCEMENT AND STRUTURAL STEEL) COMPLETE AS DIRECTED BY EIC . | 180 | CUM | 7,104 | ₹12,78,720 |
| 8 | PROVIDING AND LAYING IN SITU CEMENT CONCRETE M-25 OF TRAP / GRANITE / QUARTZITE / GNEISS METAL FOR RCC COLUMNS AS PER DETAILED DESIGNS AND DRAWING OR AS DIRECTED INCLUDING CENTERING, FORMWORK, COVER BLOCKS COMPACTION AND ROUGHENING THE SURFACE IF SPECIAL FINISH IS TO BE PROVIDED AND CURING COMPLETE (EXCLUDING REINFORCEMENT). | 120 | CUM | 13,967 | ₹16,76,040 |
| 9 | PROVIDING AND CASTING IN SITU CEMENT CONCRETE M-25 OF TRAP / GRANITE / QUARTZITE / GNEISS METAL FOR RCC BEAMS, LINTELS AS PER DETAILED DESIGNS & DRAWINGS OR AS DIRECTED INCLUDING CENTERING, FORMWORK, COVER BLOCKS COMPACTION & ROUGHENING THE SURFACE IF SPECIAL FINISH IS TO BE PROVIDED & CURING COMPLETE AS DIRECTED BY EIC. (EXCLUDING REINFORCEMENT) | 300 | CUM | 12,452 | ₹37,35,600 |
| 10 | PROVIDING AND CASTING IN SITU CEMENT CONCRETE M-25 OF TRAP / GRANITE / QUARTZITE / GNEISS METAL FOR RCC PARDI AS PER DETAILED DESIGNS & DRAWINGS OR AS DIRECTED INCLUDING CENTERING, FORMWORK, COVER BLOCKS COMPACTION & ROUGHENING THE SURFACE IF SPECIAL FINISH IS TO BE PROVIDED & CURING COMPLETE AS DIRECTED BY EIC. (EXCLUDING REINFORCEMENT) | 1,000 | CUM | 15,750 | ₹1,57,50,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.41 MB
BOQ_941309.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .