Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-Finance | ₹7.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.0 LAccepted-Finance | ₹8.0 L | L2 | Accepted-Finance L2 |
| 3 | L3₹9.5 LAccepted-Finance 58 KAILASHPURAM GOVINDPURAM GAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹9.5 L | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | SIDVI POWER AND INFRA PRIVATE LIMITED L1 | Powertech Engineers L2 | SARASWAT ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00Following detailed works is to be carried out for Rectification of High Contact Resistance of 220 kV SF₆ Circuit Breakers to achieve contact resistance value less than 100 µΩ with all cost of Men and T & P etc. required to complete the job satisfactorily at 220 K.V. Sub Station Gomti Nagar,220kv substation Chinhat and 132kv substation sahara city, Lucknow | ||||||
| 2.00220 K.V. Sub Station Gomti Nagar | ||||||
| 3.00 | Safe Carriage,loading& unloading of SF-6 gas reclaimimg plant from 220 KV Satrikh substation to 220 KV S/S Gomti Nagar,220kv substation Chinhat and 132kv substation sahara city with all cost of Men, vehicle and T & P etc. required to complete the job. | 3 | Job | 25,000 ₹75,000 | 18,000 ₹54,000 | 10,000 ₹30,000 |
| 4.00 | Dismantling of one pole of 220 kV SF₆ Circuit Breaker, evacuation, recovery and safe storage of SF₆ gas in cylinders including all T&P, manpower and safety precautions, complete as per UPPTCL norms(One Job per Pole). | 15 | Job | 5,000 ₹75,000 | 6,500 ₹97,500 | 10,000 ₹1.5 L |
| 5.00 | Opening of interrupter chamber, detailed inspection of main and arcing contacts, cleaning, polishing and replacement by providing new contacts by the firm, if required, including proper alignment and reassembly, so as to restore the contact resistance to within acceptable limits and below 100 µΩ (MEASUREMENT OF CRM IS DONE BY THE FIRM), complete in all aspects(One Job per Pole). | 15 | Job | 2,700 ₹40,500 | 2,500 ₹37,500 | 12,000 ₹1.8 L |
| 6.00 | Vacuuming of pole, removal of moisture, refilling of SF₆ gas up to rated pressure, checking of gas quality and leakage test,Measurement of contact resistance ,timing test, operation and functional checks of the circuit breaker, recording of test results and submission of test reports, including all activities required to make the circuit breaker fully operational and ready for use,complete as per UPPTCL standards (One Job per Pole). | 15 | Job | 4,500 ₹67,500 | 4,000 ₹60,000 | 7,000 ₹1.1 L |
| 7.00 | Safe Carriage,loading& unloading of SF-6 gas reclaimimg plant from 220 KV Gomti Nagar substation to 220 KV Satrikh S/S with all cost of Men, vehicle and T & P etc. required to complete the job. | 1 | Job | 55,000 ₹55,000 | 60,000 ₹60,000 | 20,000 ₹20,000 |
| 8.00220kv substation Chinhat(02 NO BREAKER) and 132kv substation sahara city(01 NO BREAKER), Lucknow | ||||||
| 9.00 | Dismantling of one pole of 145 kV SF₆ Circuit Breaker, evacuation, recovery and safe storage of SF₆ gas in cylinders including all T&P, manpower and safety precautions, complete as per UPPTCL norms(One Job per Pole). | 9 | Job | 10,000 ₹90,000 | 8,000 ₹72,000 | 20,000 ₹1.8 L |
| 10.00 | Opening of interrupter chamber, detailed inspection of main and arcing contacts, cleaning, polishing and replacement by providing new contacts by the firm, if required, including proper alignment and reassembly, so as to restore the contact resistance to within acceptable limits and below 100 µΩ(MEASUREMENT OF CRM IS DONE BY THE FIRM), complete in all aspects(One Job per Pole). | 9 | Job | 10,000 ₹90,000 | 8,000 ₹72,000 | 12,000 ₹1.1 L |
Updated dates
Tender Value
₹9.2 L
EMD Value
₹9,500
Closing Date
26 Mar 2026, 4:00 pmClosed
S.E, ETC I, Lucknow
Pareshan Bhawan, Gomti Nagar, Lucknow
Work
2026_UPTCL_1117304_1
Short E-tender 111/ETC-ILKO/2025-26
Open Tender
Electrical Works
30 days
Pareshan Bhawan, Gomti Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹9,500
18 Apr 2026
17 Feb 2026
27 Mar 2026
17 Feb 2026
26 Mar 2026
17 Feb 2026
Following detailed works is to be carried out for Rectification of High Contact Resistance of 220 kV SF₆ Circuit Breakers to achieve contact resistance value less than 100 µΩ with all cost of Men and T & P etc. required to complete the job satisfactorily at 220 K.V. Sub Station Gomti Nagar,220kv substation Chinhat and 132kv substation sahara city, Lucknow
220 K.V. Sub Station Gomti Nagar
Safe Carriage,loading& unloading of SF-6 gas reclaimimg plant from 220 KV Satrikh substation to 220 KV S/S Gomti Nagar,220kv substation Chinhat and 132kv substation sahara city with all cost of Men, vehicle and T & P etc. required to complete the job.
Dismantling of one pole of 220 kV SF₆ Circuit Breaker, evacuation, recovery and safe storage of SF₆ gas in cylinders including all T&P, manpower and safety precautions, complete as per UPPTCL norms(One Job per Pole).
Opening of interrupter chamber, detailed inspection of main and arcing contacts, cleaning, polishing and replacement by providing new contacts by the firm, if required, including proper alignment and reassembly, so as to restore the contact resistance to within acceptable limits and below 100 µΩ (MEASUREMENT OF CRM IS DONE BY THE FIRM), complete in all aspects(One Job per Pole).
Vacuuming of pole, removal of moisture, refilling of SF₆ gas up to rated pressure, checking of gas quality and leakage test,Measurement of contact resistance ,timing test, operation and functional checks of the circuit breaker, recording of test results and submission of test reports, including all activities required to make the circuit breaker fully operational and ready for use,complete as per UPPTCL standards (One Job per Pole).
Safe Carriage,loading& unloading of SF-6 gas reclaimimg plant from 220 KV Gomti Nagar substation to 220 KV Satrikh S/S with all cost of Men, vehicle and T & P etc. required to complete the job.
220kv substation Chinhat(02 NO BREAKER) and 132kv substation sahara city(01 NO BREAKER), Lucknow
Dismantling of one pole of 145 kV SF₆ Circuit Breaker, evacuation, recovery and safe storage of SF₆ gas in cylinders including all T&P, manpower and safety precautions, complete as per UPPTCL norms(One Job per Pole).
Opening of interrupter chamber, detailed inspection of main and arcing contacts, cleaning, polishing and replacement by providing new contacts by the firm, if required, including proper alignment and reassembly, so as to restore the contact resistance to within acceptable limits and below 100 µΩ(MEASUREMENT OF CRM IS DONE BY THE FIRM), complete in all aspects(One Job per Pole).
Vaccuming of pole, removal of moisture, refilling of SF₆ gas up to rated pressure, checking of gas quality and leakage test,Measurement of contact resistance ,timing test, operation and functional checks of the circuit breaker, recording of test results and submission of test reports, including all activities required to make the circuit breaker fully operational and ready for use,complete as per UPPTCL standards (One Job per Pole).
220 K.V. Sub Station Kursi Road
Work of maintenance and major overhauling of each pole mechanism assembly of 245KV SF6 circuit breaker(each CB has three pole).The job includes overhauling of control assembly,holding latch assembly,trip latch,anti pumping pin assembly,charging gear assembly etc.Overhauling of three phase lever shock absorver etc.Rectification/repairing of roller,linkage of mechanical assembly.Rectification of gas leakage from gas pipe assembly by replacing O ring and brazing etc.Work also includes tightening of all electrical connections for satisfactorily operation of circuit breaker.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
td.pdf
Tender Documents • 0.95 MB
BOQ_2075935.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid