Loading…
Loading…
Tender Value
₹14.9 L
EMD Value
₹14,868
Closing Date
27 Aug 2026, 12:00 pm3d left
Executive Engineer,
O/o Executive Engineer, WRD, Araniyar Basin Division, Chennai
Reconstruction of weir and Strengthening the tank bund in Vellambakkam Large tank in Vellambakkam village of Ponneri Taluk in Thiruvallur District
2026_WRD_694528_1
e-Tender Notice No.01 DB/ JDO / F - 208 / 2026-27 / Dt.12.08.2026
Open Tender
Civil Works
Lump-sum
180 days
Thiruvallur
Satisfactorily completed for the Annual Maintenance Works past three year
5 documents required · 5 mandatory
₹0
₹14,868
14 Aug 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers. | 3,700 | Square Metre | 6.36 | ₹23,532 |
| 2 | Earth work in all soils except Medium rock / hard rock requiring blasting and conveying for formation of bund with a lead of 1.00km metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods and sectioning etc complete complying with standard specifications and as directed by the departmental officers (Bund formation) | 4,500 | Cubic Metre | 120.99 | ₹5,44,455 |
| 3 | Dismantling,clearing away and carefully stacking material useful for resuse for Brick work ect.,Complete Complying with standard spesification and as directed by the departmental officers. | 26 | Cubic Metre | 302.95 | ₹7,876.7 |
| 4 | Dismantling,clearing away and carefully stacking material useful for resuse for Plain cement concrete ect.,Complete Complying with standard spesification and as directed by the departmental officers. | 3 | Cubic Metre | 520.25 | ₹1,560.75 |
| 5 | Earth work excavation in all soils except hard rock requiring blasting and coveying for formation of bund with a lead of 0 to 100 m by deploying earth moving machineries and tippers excluding benching, formation of bund, breaking clods sectioning etc., complete as directed by the departmental officers. (Open Excavation) | 16 | Cubic Metre | 50.55 | ₹808.8 |
| 6 | Providing and placing in position of plain cement concrete M 10 grade using graded hard blue granite broken stone jelly of 20 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers | 5 | Cubic Metre | 7,054.92 | ₹35,274.6 |
| 7 | Providing and placing in position of plain cement concrete M 15 grade using graded hard blue granite broken stone jelly of 20 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers specificatiions | 57 | Cubic Metre | 7,451.63 | ₹4,24,742.91 |
| 8 | Supplying, fabrication and placing in position of Ribbed Tor Steel for all RCC works as per design given including cost of steel,Binding wire and labour charges for cutting,bending,laying in position and tying with binding wire etc., complete as per standard specification and as directed by the departmental officers. | 17.1 | Quintal | 9,193.21 | ₹1,57,203.89 |
| 9 | Supplying and erecting centring for vertical plain / RCC concrete walls of supply channel, retaining wall etc of follwing height with necessary supports, all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25mm x 3 mm for bearing laid silver Oak / Country wood joist of size 7.5cm x 5 cm spaced @ about 90 cm c / c and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm c / c etc., complete complying with standard specifications and as directed by the departmental officers (Vertical centering)
Upto 3m height | 90 | Square Metre | 717 | ₹64,530 |
| 10 | GST 18% in Figures | 1 | Tax | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
PQ_Vellambakkam.pdf
Tender Documents • 0.51 MB
BOQ_834993.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].