Removal of damaged 05MVA Transformer at 33/11KV Sub-Station Delhi Road of EDD-I Hapur
2021_PVVNL_590661_1
02(W)/EDCH/2021-22
Open Tender
Electrical Works
Lump-sum
Hapur
Removal of damaged 05MVA Transformer at 33/11KV Sub-Station Delhi Road of EDD-I Hapur
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹1,600
14 Jun 2021
31 May 2021
11 Jun 2021
31 May 2021
11 Jun 2021
31 May 2021
31 May 2021 - 11 Jun 2021
Amount
FOR REMOVAL OF DAMAGED 05MVA POWER TRANSFORMERS AT 33/11KV SUB-STATION DELHI ROAD, IN THE JURISDICTION OF EDD-I HAPUR.
Dragging/Shifting of Transformers 63 to 250KVA (10Nos.) at above 33/11KV Sub-Stations with the help of Crane and Manual labour and putting out side for clearing Path.
Dragging/Shifting of 11KV XLPE 3x185Sqmm Cable drum (12Nos.) at above 33/11KV Sub-Stations with the help of Crane and Manual labour and putting out side for clearing Path.
cutting the earthing strips at different places and neutral point of 05MVA damaged T/F at above 33/11KV Sub-Stations.
Removal of 11KV XLPE Cable connections from 05MVA damaged T/F at above 33/11KV Sub-Stations.
Removal of Jumpering of HV/LV side of 05MVA damaged T/F at above 33/11KV Sub-Stations.
Dragging/Shifting of damaged 05MVA T/F at above 33/11KV Sub-Stations with the help of Crane and Manual labour and lowering towards ground level tuning the T/F and putting out side of switchyard.
Dragging/Shifting of New 05MVA T/F from dump site to inside switchyard on foundation, with the help of Crane and Manual labour, at above 33/11KV Sub-Stations.
Connecting the earthing strips at different places and neutral point of the T/F with proper cutting, jointing and welding at site as per requirment and specification given in construction manual issued by RESPO Lucknow.
Making the connection of 11KV XLPE Cable with 05MVA T/F including the cost of required Lugs & PVC Tape etc. at 33/11KV S/Ss.
Connecting all jumpers on HV/LV side and 11KV cable with providing cotton tap & empire Tape etc.
Earthing of neutral & body of Transformer, By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 80 Fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support as per RESPO Drawing/Norms.
M S Electricals
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .