| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | ₹1.4 L | L1 | Accepted-Finance Financial |
| 2 | L2₹1.4 LRejected-Finance SOMABARAY BAZAR P O FAGU KALIMPONG | ₹1.4 L | L2 | Rejected-Finance Financial |
| 3 | L3₹1.4 LRejected-Finance SOMBARAY BAZAR GORUBATHAN DIST KALIMPONG | GORUBATHAN | KALIMPONG | WEST BENGAL | 735231 | ₹1.4 L | L3 | Rejected-Finance Financial |
Tender Value
₹1.3 L
EMD Value
₹2,685
Closing Date
11 Feb 2026, 4:00 pmClosed
Pradhan
Dalim Gram Panchayat
Creation of plastic waste storage unit near Shermali
2026_GTA_996507_2
PR/DALIM_GP/e-NIT /04(15thCFC)/2025-26
Open Tender
CIVIL WORKS
30 days
Dalim
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,685
11 Mar 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Controlled Cement concrete with well graded stone chips (20 mm nominal size ) excluding shuttering and reinforcement with complete design of concrete as per ISI-456 and relevant special publications submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in-charge. Consumption of cement will not be less then 300kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basic of preliminary test & job mix formula In Ground floor & foundation.[using concrete mixture]M 20 Grade.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary fitting as required, jointing materials and two coats of painting with approved paint in any position above ground.( Payment will be made on the center line measurements of total pipe line including all specials. No seperate payment will be made for accesorie, specials.).
Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63]. 10 Kg/Sq/Cm.(Dia) Working Presssure).
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.) .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_2438820.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid