Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹6.4 L (2.98%)Admitted-Finance | ₹2.2 Cr+₹6.4 L (2.98%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kamalam Construction L2 | HARI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01Strengthening the Road from Melkaranai Panchayat to Anniyur Panchayat Km 0/00 - 2/894 | |||||
| 1.02Clearing the scrub jungles including all labour charges for all labour charges etc complete. | |||||
| 1.03 | Km 0/0 - 2/894 | 9,146.16 | m2 | 15 ₹1,37,192.4 | 6 ₹54,876.96 Lowest |
| 1.04 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 1,039.54 | m3 | 200 ₹2,07,908 | 140 ₹1,45,535.6 Lowest |
| 1.05Collection and supplyi of carted earth from approved quarry an average lead 1km including cost and conveyence of all materials to site and labour charges etc., | |||||
| 1.06 | Km 0/0 - 1/00 | 172.51 | m3 | 147.44 ₹25,434.87 Lowest | 147.44 ₹25,434.87 Lowest |
| 1.07 | Km 1/0 - 2/00 | 181.44 | m3 | 147.44 ₹26,751.51 Lowest | 147.44 ₹26,751.51 Lowest |
| 1.08 | Km 2/00 - 2/894 | 154.25 | m3 | 147.44 ₹22,742.62 Lowest | 147.44 ₹22,742.62 Lowest |
| 1.09Subgraded Stabilization | |||||
| 1.10 | Km 0/0 - 1/00 | 1,215 | m3 | 147.44 ₹1,79,139.6 Lowest | 147.44 ₹1,79,139.6 Lowest |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
5 Jan 2026, 3:00 pmClosed
The Additional Collector
DRDA, Viluppuram
TNVPM/MGSMTSavings/02
2025_RDTN_634800_2
TNVPM/MGSMTSavings
Open Tender
Civil Works
Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.2 L
Yes
8 Jan 2026
20 Dec 2025
5 Jan 2026
20 Dec 2025
5 Jan 2026
20 Dec 2025
Amount
Strengthening the Road from Melkaranai Panchayat to Anniyur Panchayat Km 0/00 - 2/894
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Collection and supplyi of carted earth from approved quarry an average lead 1km including cost and conveyence of all materials to site and labour charges etc.,
Subgraded Stabilization
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Construction of Granular sub base by providing well graded material (25mm to 4.75mm IRC HBG metal @ 65% 4375 to 2.36mm IRC HBG metal @ 20% & spreading in uniform layers with lota grader on prepared as per specification
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Consturction of 5.00m RCC Alsb Culver @ 1280m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting centering shuttering including necessary supports for plane surface I foundation and superstructure
Centering B/GL
Centering A/GL
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision of 15 nos of rumble strips coverd with premix bituminous carpet 15-20mm high at centre 250 mm wide paced at 1 n c/c at approved locations to control speed marked with white srips of road marking paint
Provision for painting lines, dashes, arrows etc., on roads in two coats on new work with ready marking paint conformation to IS Thermoplast
Cost and supply of sign board
Provision for KM Stones
Provision for HM Stones of size 75 x 23 x 10 cm.
Provision for the Name Board
Provision for the Photo Graphic
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kamalam Construction (BID ID -1548101)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Pack2.pdf
Tender Documents • 0.89 MB
BOQ_759614.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .