| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance Qualified |
| 2 | L2₹2.0 CrAccepted-Finance | ₹2.0 Cr | L2 | Accepted-Finance Qualified |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD not submitted |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
15 Apr 2023, 11:00 amClosed
EE Sangram Division, PWD
O/o Executive Engineer, Sangram division, PWD, Kurung Kumey District, A.P.
Construction of Road from PWD road to VKV School Gaga in Kurung Kumey District AP, SH Widening, CD works, Protection works, Blacktopping etc.
2023_PWDAP_1250_1
SGMD/RE/Tender/2023-24/01
Open Tender
Civil Works – Roads
Item Rate
365 days
Gaga Nyapin ADC Hq. Kurung Kumey District
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EE Sangram division, PWD
₹2.0 L
Jollang
21 Apr 2023
8 Apr 2023
21 Apr 2023
8 Apr 2023
15 Apr 2023
8 Apr 2023
12 Apr 2023
Amount
SH:WIDENING
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
SH: RCC Slab culvert 1mtr span, 1.5 mtr Height=2 Nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) * Ordinary Soil * Manual Means Upto 3 Mtr Depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications * Coursed rubble masonry (first sort)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications * PCC Grade M 20 * Height Upto 5M
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specifications * RCC Grade M20 * Using concrete Mixer * For solid slab super-structure, 20-30% of (a+b+c) * Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in Super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specifications a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
SH: PAVEMENT
WBM-I=1.30 KM Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (i) Grading- I (Using Screening Crushable type such as Moorum or Gravel) (b) Using Screening Type-A (13.2mm Agg.)
WBM-II=1.30 KM Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel) (c) Using Screening Type-B (11.2mm Agg.)
WBM-III=1.30 KM Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (ii) Grading- III (Using Screening Crushable type such as Moorum or Gravel) (c) Using Screening Type-B (11.2mm Agg.)
SH: BLACK TOPPING=1.30 KM
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Tack Coat-Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
Open - Graded Premix Surfacing (Providing, laying and rolling of open -graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) (i) Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour .
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) (i) Case - I : Type A
SH: RETAINING WALL= 59 MTRS.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I. Ordinary Soil A. Manual Means * Upto 3m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification b) Random Rubble Masonry
D. Dry rubble masonry
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular Material
SH: CC DRAIN=1030 MTRS.
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth
Centring and shuttering including strutting proping etc. and removal of form work for: b) Walls including attached buttresses, pilasters etc.
12 mm Cement plaster in CM 1:4 (1 Cement: 4 Sand)
Neat Cement punning
M/s G.A Enterprise
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1369.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].