Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC 184 187 TEMPLESTEPS BLOCK ANNASALAI LITTLEMOUNT CHENNAI CHENNAI TAMIL NADU 600015 | CHENNAI | TAMIL NADU | 600015 | L1 | Accepted-AOC L1 |
Tender Value
₹5.2 L
EMD Value
₹10,500
Closing Date
12 Mar 2023, 5:00 pmClosed
XEN Electrical Division No. 1 Shimla
The Executive Engineer Electrical Division No-1 HPPWD Shimla-9
Annual Maintenance of 2 Nos. passenger lift Otis make machine No. Eoo9018 E9009017 at Armsdale bldg and 1 No. Passenger lift Otis make machine No. G008958 at Ellerslie bldg. Shimla 2 period 2023-2024 i.e 1.04.2023 to 31.03.2024
2023_PWD_70239_1
Electrical Division-I dated 27.02.2023
Open Tender
Electrical Works
Item Rate
365 days
SHIMLA
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
E.E.Electrical Division No-I Shimla-9
₹10,500
14 Sept 2023
6 Mar 2023
13 Mar 2023
6 Mar 2023
12 Mar 2023
6 Mar 2023
Amount
Regular examination, lubrication and adjustment of the equipment and planned maintence in a systematic manner and replacement of parts as detailed below:-
(i) Check all wires ropes and chains to maintain an adequate factor of safety, to equalize tension on all hoisting ropes,repair or replace conductor cables and hoistway and machine room elevator wiring and replace the same if required under intimation to Er-in-Charge.
(ii)Systematic examining and adjustment of motor,machine,panel,car door operator,touch/push buttons,car door hanger, car frame car safety mechanism and platforms, emergency lightemergency alarm,lift fan and batteries etc and replacement of all equipments and cards required to make the lift functional.
(iii)Examine periodically all safety devices and governor and all custmary safety tests.
(iv) The Firm will provide emergency minor adjustment call back services 24 hours as all working days as well as holidays/Sundays.The firm will maintain the lift in reliable and efficient operating conditions.The max breakdown period for lift shall not be more than 48 hours in any case,otherwise penality will be imposed on the firm per day basis.
Machine No.E009017
Rate for 2023-24 i.e from 01/04/2023 to 31/03/2024
Machine No.E009017
Rate for 2023-24 i.e from 01/04/2023 to 31/03/2024
Machine No.G008958
Rate for 2023-24 i.e from 01/04/2023 to 31/03/2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_105846.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .