| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | S.D.DOUNDE INFRA PVT.LTD. L4 | SIDDHIVINAYAK INFRASTRUCTURE L1 | M/S UNITED INFRASTRUCTURE L3 | Atul Sambhajirao Nikam L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 70 mm compacted thickness.USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-40 bulk bitumen rates are considered to arrive at rates) | 350 | Cubic Metre | 8,800 ₹30.8 L | 7,275 ₹25.5 L | 7,550 ₹26.4 L | 6,299 ₹22.0 L |
| 2.00 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-40 bulk bitumen rates are considered to arrive at rates) | 1,575 | Cubic Metre | 10,500 ₹1.7 Cr | 8,081 ₹1.3 Cr | 9,340 ₹1.5 Cr | 9,277 ₹1.5 Cr |
| 3.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-40 bulk bitumen rates are considered to arrive at rates) | 75,005 | SQM | 19 ₹14.3 L | 16 ₹12.0 L | 18 ₹13.5 L | 10 ₹7.5 L |
| 4.00 | BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant, Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-40 bulk bitumen rates are considered to arrive at rates) | 700 | Cubic Metre | 7,360 ₹51.5 L | 5,450 ₹38.1 L | 4,500 ₹31.5 L | 5,733 ₹40.1 L |
| 5.00 | Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum. Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary labour, material and artificial watering etc. complete complete as directed by Engineer in charge. | 3,000 | Cubic Metre | 670 ₹20.1 L | 375 ₹11.3 L | 649 ₹19.5 L | 400 ₹12 L |
| 6.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 11,000 | Cubic Metre | 70 ₹7.7 L | 35 ₹3.9 L | 118 ₹13.0 L | 70 ₹7.7 L |
| 7.00 | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 2,400 | Cubic metre | 148.5 ₹3.6 L | 45 ₹1.1 L | 118 ₹2.8 L | 80 ₹1.9 L |
Updated dates
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
27 Jan 2026, 5:30 pmClosed
EE NHD Chhatrapati Sambhajinagar
EE NHD Chhatrapati Sambhajinagar
STMC to Kopargaon Vaijapur As club Chh Sambhajingar road 30 000 to 80 000 Section of NH 752I in the state of Maharashtra
2025_MoRTH_884221_1
EENHD/Chh.S./Tender/NIT No-5/3002282
Open Tender
Civil Works
365 days
Chhatrapati Sambhajinagar
Rs. 10,000/- Toward cost of RFP at the time of the submission, through the portal Bharatkosh.gov.in (receipt/document of online payment to be submitted along with bid in soft copy.
8 documents required · 8 mandatory
₹10,000
Bharatkosh
₹3.9 L
CE Office (NH) PWD Konkan Bhavan Navi Mumbai CBD B
16 Feb 2026
5 Nov 2025
28 Jan 2026
5 Nov 2025
27 Jan 2026
5 Nov 2025
6 Jan 2026
DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 70 mm compacted thickness.USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-40 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-40 bulk bitumen rates are considered to arrive at rates)
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-40 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant, Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-40 bulk bitumen rates are considered to arrive at rates)
Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum. Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary labour, material and artificial watering etc. complete complete as directed by Engineer in charge.
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.
Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_929377.xls
BOQ • 0.23 MB
Upload.rar
Tender Documents • 3.71 MB
Download all tender documents and submit your bid