Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.1 LAccepted-AOC JIND JIND HARYANA | JIND | HARYANA | 126101 | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.0 L+₹4.0 L (6.10%)Rejected-Finance DISTT KARNAL | KARNAL | HARYANA | L2 | Rejected-Finance L2 | |
| 3 | L3₹70.4 L+₹5.3 L (8.22%)Rejected-Finance HARYANA HR | AMBALA | HARYANA | 133001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹71.9 L+₹6.9 L (10.6%)Rejected-Finance MAIN STREET MAIN STREET GONDER 35 132024 | GONDER | KARNAL | HARYANA | 132024 | L4 | Rejected-Finance L4 |
Tender Value
₹73.4 L
EMD Value
₹1.5 L
Closing Date
27 Apr 2023, 5:00 pmClosed
SANDEEP SINGH
PD - I, Karnal
Construction of Retaining wall on Jhanjari Taraori road at RD 400 to 1000 near village Jhanjhari (Road ID 7459) in Nilokheri Constituency in Karnal District.
2023_HRY_271493_1
202302A11E3B 0F59 46E5 A2E1 C5C81352B6A4644BAR
Open Tender
Civil Works
Works
60 days
Taraori
As per Bid Document
2 documents required · 2 mandatory
₹5,000
Yes
₹1.5 L
Yes
27 Jun 2023
6 Apr 2023
28 Apr 2023
6 Apr 2023
27 Apr 2023
6 Apr 2023
6 Apr 2023 - 13 Apr 2023
Amount
[14.23.1]Cement pointing 1:2 on lining 1. In bed.
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications.
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.2.2]Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 2. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
[7.59]Extra for making tapered surface of brick masonry.
Rohit Kumar Contractor
NARENDER KUMAR
pavee construction
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .