| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹4,743.54 (0.03%)Admitted-Finance | ₹1.7 Cr+₹4,743.54 (0.03%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R. Subramanian L1 | SR INFRAA L2 |
|---|---|---|---|---|---|
| 1.001.) Koothamuthal-Kovilur Road Km 0/0-0/700 | |||||
| 2.00 | Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-0/700 | 1,260 | Sqm | 4.5 ₹5,670 Lowest | 6.5 ₹8,190 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-0/700 | 5,366.99 | Cum | 111.88 ₹6,00,458.84 Lowest | 111.88 ₹6,00,458.84 Lowest |
| 4.00 | Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) Km 0/0-0/700 | 5,346.5 | Cum | 23.39 ₹1,25,054.64 Lowest | 23.39 ₹1,25,054.64 Lowest |
| 5.00 | Blastering to the Hard Rock Requiring Blastering & Stacking Hard Granite Surface for Hard Soild Measured including all charges etc , complete Km 0/0-0/700 | 111.81 | Cum | 742.5 ₹83,018.93 Lowest | 742.5 ₹83,018.93 Lowest |
| 6.00 | Medium rock and medium Dense rock not Requiring Blastering including all Charges etc , completed Km 0/0-0/700 | 111.81 | Cum | 378.75 ₹42,348.04 Lowest | 378.75 ₹42,348.04 Lowest |
| 7.00 | Rough stone dry Packing for aprons including cost and conveyance of all materials to site and all labour charges etc complete for 10 cum Km 0/0-0/700 | 159.32 | Cum | 2,098.93 ₹3,34,401.53 Lowest | 2,098.93 ₹3,34,401.53 Lowest |
| 8.00 | Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete Km 0/0-0/700 | 422.37 | Cum | 4,880.37 ₹20,61,321.88 Lowest | 4,881 ₹20,61,587.97 |
| 9.00 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an Km 0/0-0/700 | 422.37 | Cum | 5,839.35 ₹24,66,366.26 Lowest | 5,839.35 ₹24,66,366.26 Lowest |
| 10.00 | Hectametre Stone | 3 | Each | 231 ₹693 Lowest | 231 ₹693 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
17 Feb 2021, 3:00 pmClosed
Additional Director/ Project Director
DRDA, SALEM
SCPAR -2020-21 Package No.08/2020-21 Yercaud Block in Salem District No of Works -01
2021_RDTN_192382_52
Roc.No.08/2021/A6
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per tender schedule
3 documents required · 3 mandatory
₹0
₹1.8 L
DRDA, SALEM
22 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
12 Feb 2021
Amount
1.) Koothamuthal-Kovilur Road Km 0/0-0/700
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-0/700
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-0/700
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) Km 0/0-0/700
Blastering to the Hard Rock Requiring Blastering & Stacking Hard Granite Surface for Hard Soild Measured including all charges etc , complete Km 0/0-0/700
Medium rock and medium Dense rock not Requiring Blastering including all Charges etc , completed Km 0/0-0/700
Rough stone dry Packing for aprons including cost and conveyance of all materials to site and all labour charges etc complete for 10 cum Km 0/0-0/700
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete Km 0/0-0/700
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an Km 0/0-0/700
Hectametre Stone
Sign Board
1.A) 1.50m Span RCC Culvert @ Km 0/375
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. (Culvert)
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Cement Concrete 1:3:6 (one cement three sand and six hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes Below Sill Level
Deck Slab
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinfored cement concrete works as per the design given including cost of steel and binding wire in all floor etc..,
Plain cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete foe bed blocks
Reinforced Cement Concrete 1:1.5:3 mix using 20 mm HBG metal for foundation including wateriung wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete (Deck slab)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for Weep holes 4 " Pvc pipe
1.B) 3.00m Span RCC Culvert @ Km 0/520
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. (Culvert)
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Cement Concrete 1:3:6 (one cement three sand and six hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes Below Sill Level
Deck Slab
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinfored cement concrete works as per the design given including cost of steel and binding wire in all floor etc..,
Plain cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete foe bed blocks
Reinforced Cement Concrete 1:1.5:3 mix using 20 mm HBG metal for foundation including wateriung wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete (Deck slab)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for Weep holes 4 " Pvc pipe
1.C) Protection Wall @ Km 0/0-0/700
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. (Culvert)
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
RR Masonry with cement mortar 1:5 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Dry stone masonry for Retainingwall -10cum including cost and conveyance of all materials and all labour charges etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SR INFRAA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .